The hinge put in on purpose
An arch with two pinned feet cannot be solved by statics. Add a third hinge at the crown — deliberately weakening it — and the whole structure falls out of one moment equation.
One support too many, and what it costs to know
Add a redundant restraint and the load has two routes to the ground. Equilibrium cannot say how it splits, and the answer turns out to depend on stiffness — which is a different kind of question.
The support that moved
A redundant structure knows things statics cannot see. Settle one support by ten millimetres and a complete set of bending moments appears — in equilibrium with no load at all, and larger for a stiffer beam.
The column that stops
A load path that runs straight to the ground costs almost nothing. Interrupting one costs depth in proportion to the square root of the load times the distance it is moved — and the interruption's own deflection becomes the settlement of everything standing on it.
The columns are shorter than the core
Every column in a tall building gets shorter as the building is built on top of it, and the core beside it gets shorter by a different amount. The floors between them tilt by the difference — and the difference is largest exactly half way up, because a floor near the top has almost nothing built above it and a floor near the bottom has almost nothing beneath it.
The deflection that belongs to the support
A beam calculation answers a question about a beam sitting on things that do not move. Real ones sit on bearings, on other beams and on columns that shorten, and every one of those is a spring in series with the member — so a deflection is the sum of two things and only one of them is a property of the beam.
The thrust that never reaches the ground
The arches so far have all ended at the same sentence — the foundation is where an arch is really decided. A tie changes the sentence without changing the arithmetic: the horizontal force is still there, still the same size, and it now closes on itself through a bar at deck level.
The abutment that spreads before it turns
A fixed arch is fixed only if its abutments hold still, and they have two ways not to. Turning releases the springing moment, but slowly: an abutment has to be a hundred times the rib's EI/L to hold nine tenths of it, and a footing on stiff clay under a slender concrete rib already is. Spreading does the opposite. The rib's own shortening is worth 13.6 mm of spread, so an abutment that gives 7 mm a side under the thrust doubles every secondary moment in the arch — and a footing on dense sand gives 8.
The frames the deck pushes first
A half-through girder's U-frames are the ends of the cross-girders that carry its deck. Load the deck and every cross-girder sags, its ends rotate, and every frame's foot swings inward by millimetres before the compression chord has asked the frames for anything. It looks like a second imperfection on top of the chord's bow. It is a much weaker one: the frames all move together and the chord simply goes with them, so a 7.5 mm push adds 1.4 kN to frames that the bow loads with 13.6, and stiffer frames make it smaller, not larger. What the push leaves is mostly in the frames' own members, not in what they ask of the chord.
The jack that creep carries past the mark
A continuous beam built from both ends towards a closure bay keeps less secondary moment at its supports than the same beam stressed all at once, and creep gives back three-quarters of the difference over the years. Bridge builders do not always wait: before the closure is cast, the supports can be lowered on jacks so that the beam starts with the moments it would have had. Jacked by the whole difference, it does start there — and creep, which goes on returning the staged deficit while it relaxes the jacked correction, carries it past them, by a seventh of what was jacked. Jacked by 0.89 of the difference, it starts a ninth short and ends a ninth over. And it takes a jack at every interior support: with fewer, the moment goes to the wrong places.
The pier's share is cut into the members
A truss continuous over a middle support has one reaction that statics cannot find, and the lengths its members are cut to decide it. Cambered to land level under its dead load on three bearings, a two-span truss puts 572 kN on its pier; cambered span by span, as two simple trusses, the same members on the same bearings put 480 kN there and carry the dead load with no moment over the pier at all. The list chooses the moment diagram. And a millimetre of shop tolerance on every member moves the pier's share as much as a bearing set fourteen millimetres out of level, so a reaction the design depends on has to be set by a jack rather than by a drawing.
Two hinges let in and nothing lost
Continuity is usually sold as the reason to avoid hinges: a continuous beam shares its moment over the supports, and a chain of simple spans wastes it. Heinrich Gerber's 1866 bridge showed that the choice is not between those two. Put two hinges in the right places and the beam becomes statically determinate, a support can settle as far as it likes without moving a single moment, and under a pattern of moving load the largest moment comes out lower than the continuous beam's. What has been spent is something a moment diagram does not show: if one of those hinges fails, there is no other way for the load to reach the ground.
What the joints in a viaduct are for
A long viaduct is usually built as continuous groups of three or four spans with a movement joint between them, and the grouping is often explained as a compromise between continuity's economy and a chain of simple spans' indifference to settlement. Computed, settlement does not take part in the compromise: two spans continuous already feel a sinking pier as the whole viaduct would. Nor does robustness, much. What the joints are for is the movement of the deck, and what the group's size buys is the moment of the traffic.
The arch that pushes harder as it spreads
A masonry arch whose abutments move apart does not fall when they first move. It cracks at its crown and its haunches, turns into a mechanism of three hinges, and keeps standing while its crown drops — and the thrust it puts on the abutments that are already giving way rises. A semicircle of 10 m with a ring 0.15 of its radius survives 626 mm of spread, pushing a third harder at the end than at the start, and collapses only when the thrust reaches the outer edge of its springing.
The wheel on an arch that has spread
A masonry arch whose springings have moved apart still stands, and its thrust has risen. It has not grown stronger. A semicircle of 10 m span with a ring 0.15 of its radius carries 52.8 kN a metre on its quarter span before its springings move, and 29.8 kN at half the spread that would bring it down. A point load and a spread spend one reserve, the thrust the far springing can take, and the spread spends it first.
The doubtful pier belongs in the middle of a pair
A viaduct's designer who knows which piers stand on poor ground can put a movement joint over each of them, and the joint helps: with either of two piers settling 40 mm, twelve spans grouped to put joints over them carry 315 kN·m where groups of three carry 367. Putting each doubtful pier in the middle of a two-span pair does far better, 230, because a pair's hogging is the thing a settling middle pier relieves. Under the full load, until its pier has sunk 35 mm, a pair is no worse than two simple spans, and it pays for that with the traffic envelope that groups of three were chosen for.
The second pier undoes the first
A truss continuous over one pier has its reaction set by one jack: lift until the load cell reads the design value, pack the bearing, done. Over three piers the jacks argue. Lifting one pier a millimetre hands 85 per cent of what it gains to the pier beside it, so jacking each pier to its own design reaction in turn leaves half the error after a full round and still a seventh after three. The error that will not go is the one the piers share, which lifting them all together barely moves. Read every pier once and solve for all the lifts together, and one round of the jacks does what ten rounds one at a time cannot.
The pier that may rise belongs under a joint
A pier that may only settle is best put in the middle of a two-span pair, whose hogging a settlement relieves before it adds to anything. A pier on swelling clay, or over a culvert that may be relieved of its fill, may rise instead, and then the pair is the worst place for it: 40 mm of heave puts 459 kN·m into a pair that would have carried 230 for the same settlement. The place that is gentle both ways is the end of a group, under a movement joint. With the doubtful piers' movement known in size but not in sign, joints over them carry 335 kN·m where pairs carry 459 and groups of three 465 — and nothing with the same traffic envelope does better.