Internal forces

What the joints in a viaduct are for

A long viaduct is usually built as continuous groups of three or four spans with a movement joint between them, and the grouping is often explained as a compromise between continuity's economy and a chain of simple spans' indifference to settlement. Computed, settlement does not take part in the compromise: two spans continuous already feel a sinking pier as the whole viaduct would. Nor does robustness, much. What the joints are for is the movement of the deck, and what the group's size buys is the moment of the traffic.

Assumes The moment over the support, and what it buys, The hinge put in on purpose and The structure that survives losing a member.

Two hinges let in and nothing lost set a continuous beam of three 7 m spans beside the same beam with two Gerber hinges let into its centre span. The hinges made the beam statically determinate, so a support could settle as far as it liked without moving a single moment, and under a moving pattern of load the hinged beam’s largest moment was lower than the continuous beam’s, 171 kN·m against 184. What the hinges cost was invisible in the moment diagrams: cut the middle of the centre span, and the continuous beam stood as two cantilevers while the hinged beam dropped its suspended span.

Between a fully continuous beam and a determinate one there is a range, and long viaducts are built in it. A deck of twenty spans is rarely continuous from end to end. It is divided into continuous groups of three or four, with a movement joint over the pier between each group, and the usual explanation is that the grouping is a compromise: long enough to keep most of continuity’s economy and its reserve against a local failure, short enough to limit what a settling pier can do. That essay ended by asking how many spans a group should have to bring the settlement moments down to where they do not matter, and how much of the alternative path a group of a given size keeps. Both questions have answers, and neither is the one the explanation expects.

Twelve spans, five ways to divide them

The beam is the same: 7 m spans, a flexural stiffness EIEI of 10510^5 kN·m$^2$, 20 kN/m of dead load and 15 of imposed. There are twelve spans, and they are divided into continuous groups of one (simple spans), two, three, four and six, or left continuous throughout. Each group is its own continuous beam, solved by the stiffness method. A joint pier carries the ends of two groups on separate bearings, so it transmits no moment, and a pier inside a group carries one continuous beam over it. Four questions are put to each division: what moment a settling pier causes; what moment the traffic’s worst arrangement asks for; how much deck a lost section takes with it; and how far each joint has to move.

A settling pier, and how little the grouping helps

One pier settles, and the size of the group hardly matters. The largest moment anywhere under the full 35 kN/m with one pier settled, the worst pier chosen, for twelve 7 m spans as simple spans, in continuous groups of two and three, and continuous throughout, EI 100,000 kN·m². At 15 mm, 214, 260, 245 and 260 kN·m; at 40 mm, 214, 337, 367 and 392.
Fig. 1 The largest moment anywhere under the full 35 kN/m with one pier settled, the worst pier chosen, for twelve 7 m spans as simple spans, in continuous groups of two and three, and continuous throughout, with EI=105EI = 10^5 kN·m$^2$. At 15 mm, 214, 260, 245 and 260 kN·m; at 40 mm, 214, 337, 367 and 392.

The simple spans do not notice a settling pier, which is the whole of what the support that moved found a determinate structure is good for: their moments are fixed by statics, 214 kN·m under the full load, and they stay at 214 whatever the pier does. Every other division feels it, and the surprise is how little the size of the group matters once there is any continuity at all. At 15 mm of settlement groups of two reach 260 kN·m and the fully continuous viaduct reaches 260. Groups of three reach 245, a little less. At 40 mm the order spreads — 337 for groups of two, 367 for three, 392 for the continuous viaduct — but the difference between two spans and twelve is a sixth of the settlement moment, and the difference between simple spans and two continuous ones is all of it.

The reason is the way a settlement moment decays along a continuous beam. A pier that drops 15 mm drags the beam down with it, and the beam bends over the adjacent piers to follow; the moment is largest over the settled pier and its neighbours and falls off by a factor of about four at every pier further away, the same decay that makes a continuous beam’s load in one span barely felt three spans along. A group of two spans already contains the whole of the effect that matters: the settled pier and its two neighbours. Adding more spans adds piers so far away that they hardly take part.

There is one exception and it is worth knowing. When the pier that settles is a joint pier, it lowers the free ends of two groups at once. An end support’s settlement is much milder than an interior one’s, because the beam has only one side to bend over — on this beam it adds 49 kN·m to the adjacent span’s moment, where an interior pier’s settlement adds up to about 130. So in a divided viaduct the joint piers are the least sensitive piers there are, and an engineer who knows which pier is on doubtful ground can put a joint over it. That is a choice of where the joints go, not of how far apart they are.

The traffic’s pattern, and why three

The moment the pattern of traffic asks for, group by group. Against the number of spans in each continuous group: the largest moment over every arrangement of 15 kN/m on whole spans with 20 kN/m on all, and the largest under the full load. Simple spans, 214 kN·m; groups of three, 184, the least; continuous throughout, 192.
Fig. 2 Against the number of spans in each continuous group: the largest moment over every arrangement of 15 kN/m on whole spans with 20 kN/m on all, and the largest under the full load. Simple spans, 214 kN·m; groups of three, 184, the least; continuous throughout, 192.

The second question is the one that continuity is usually sold on. A continuous beam shares its moment between its supports and its spans, so its largest moment under a full load is lower than a simple span’s, and the moment over the support found that continuity takes a third off the span moment. Traffic does not load every span at once, though, and the moment a beam must be designed for is the envelope over every arrangement of the imposed load, the one the envelope is not a structure warned is never present all at once.

The envelope has a minimum, and it is at groups of three. Simple spans need 214 kN·m. Groups of two need the same 214, since the hogging over a two-span beam’s middle pier under full load is as large as a simple span’s sagging. Groups of three need 184, the least of any division, and groups of four, six and twelve need 192 to 194. The third span is the one that gives the end spans a continuous neighbour on one side and the middle span continuous neighbours on both; beyond three, every interior pier hogs under the alternate-span pattern that a three-span group’s arrangement already contained, and a little more. On this beam groups of three are the economical choice for moment, and by 4 per cent.

So the conventional grouping is right, and for a reason that has nothing to do with settlement. Three spans is the shortest continuous group whose envelope is as low as a continuous beam’s.

A lost section, and what falls

The third question is about robustness, the property the structure that survives losing a member defined as whether a structure that has lost a part can still carry its load by another route. The earlier essay cut the middle of the centre span and found that continuity let the two halves stand as cantilevers. But a span does not choose where it loses a section. An impact from below, a fire, a bearing that fails or a tendon that corrodes can take out a section anywhere along the span.

Where a span loses its section decides how much of it falls. Under the accidental 24.5 kN/m, with each section good for 1.0 times the group's envelope, 184 kN·m: the length of a 7 m span that falls against where it is cut, for a span inside a group of three, a span at a group's end with the joint on its left, and a simple span. A cantilever holds up to 3.87 m, so the span inside a group stands whole only for cuts between 3.13 and 3.87 m.
Fig. 3 Under the accidental 24.5 kN/m, with each section good for its group’s envelope, 184 kN·m: the length of a 7 m span that falls against where it is cut, for a span inside a group of three, a span at a group’s end with the joint on its left, and a simple span. A cantilever holds up to 3.87 m, so the span inside a group stands whole only for cuts between 3.13 and 3.87 m.

When a section is lost, the span becomes two pieces. Each piece is a cantilever from its pier, and it stands if the pier on that side has continuity behind it to hold the cantilever’s moment and the cantilever is short enough for its section. Under the accidental combination, 24.5 kN/m, a section good for the group’s envelope of 184 kN·m can hold a cantilever of 3.87 m. A 7 m span cut anywhere other than between 3.13 and 3.87 m leaves one piece longer than that, and that piece falls. The span inside a continuous group stands whole for a cut in the middle 11 per cent of its length. Cut it at a third of the span and the longer two thirds fall, leaving a 2.3 m stub on the other pier.

A span at the end of a group has a joint on one side, and the piece on that side has no continuity behind it: it is a cantilever from a pier that carries nothing on its far side, and it falls wherever the cut is. A simple span loses the whole of itself. Averaged over every position, the span inside a group loses 4.85 m, the span at the end of a group 5.93 m, and the simple span 7 m.

What a lost section takes with it, by the size of the group. The length that falls when a section is lost, averaged over every position in every span, against the spans in each group, with sections good for their group's envelope and for one and a half times it. Simple spans lose the whole 7.0 m; groups of three, 5.55 and 4.90; continuous throughout, 4.90 and 3.98.
Fig. 4 The length that falls when a section is lost, averaged over every position in every span, against the spans in each group, with sections good for their group’s envelope and for one and a half times it. Simple spans lose the whole 7.0 m; groups of three, 5.55 and 4.90; continuous throughout, 4.90 and 3.98.

So the group’s size enters only through the share of its spans that are end spans, and the curve is shallow. Simple spans lose the whole 7 m. Groups of two, both of whose spans are end spans, lose 5.74 m. Groups of three lose 5.55, groups of six 5.10 and the continuous viaduct 4.90, which still has its two end spans at the abutments. The whole difference between a continuous viaduct and simple spans is 30 per cent of a span, and the difference between groups of three and continuity is less than a tenth of one. Robustness, measured as what a lost section takes with it, is not a strong argument for long groups, because it was never a strong property of continuity at the strength the traffic asks for.

Strength is what makes the alternative path

Strength bought against what a lost section takes. The mean length that falls when a section is lost, against each section's capacity as a multiple of its group's envelope, for simple spans, groups of three and the continuous viaduct. At twice the envelope, 7.0, 4.12 and 2.89 m; at three times, 7.0, 2.72 and 0.77.
Fig. 5 The mean length that falls when a section is lost, against each section’s capacity as a multiple of its group’s envelope, for simple spans, groups of three and the continuous viaduct. At twice the envelope, 7.0, 4.12 and 2.89 m; at three times, 7.0, 2.72 and 0.77.

What changes the picture is strength. A real section has more capacity than its unfactored envelope — the design load factors, the material factor and the plastic reserve over the elastic moment together put the collapse moment at something like one and a half to two times the service envelope — and the length a cantilever can hold goes as the square root of its capacity. At one and a half times the envelope the continuous viaduct loses 3.98 m; at twice, 2.89; at three times, 0.77, which means almost every cut leaves two cantilevers short enough to stand. Groups of three lose 4.12 m at twice the envelope and 2.72 at three times, because their end spans still lose their joint-side piece.

Simple spans lose 7 m at every strength. That is the real difference, and it is not a matter of degree. A determinate span has no alternative path at any strength, since the piece on either side of a cut has nothing behind it; a continuous span has one that is bought with strength, a little at first and then all at once as the strength approaches three times the envelope. The grouping decides how many spans can buy it — every span inside a group, none of the spans at its ends.

The cantilever is not the whole of an alternative path. A deck that loses a section and hangs as two cantilevers drops its load onto the piers in a way they were not designed for; a cantilever that is long enough to stand may still deflect far enough to fall onto whatever is below, and its sudden formation is dynamic, which the slab that catches what the joints let go found can double the static demand. The lengths here are what statics allows, and the real reserve is smaller.

The joint, which is what the grouping is for

The movement each joint has to take. Against the spans in each group, each group fixed at its middle: the movement each joint between groups takes over a 40 K range of temperature, and with 400 microstrain of the deck's own shrinkage and creep added. Simple spans, 3.4 and 6.2 mm; groups of three, 10.1 and 18.5; groups of six, 20 and 37. The continuous viaduct has joints only at its abutments, each taking half its length's movement, 20 and 37.
Fig. 6 Against the spans in each group, each fixed at its middle: the movement each joint between groups takes over a 40 K range of temperature, and with 400 microstrain of the deck’s own shrinkage and creep added. Simple spans, 3.4 and 6.2 mm; groups of three, 10.1 and 18.5; groups of six, 20 and 37. The continuous viaduct has joints only at its abutments, each taking half its length’s movement, 20 and 37.

The fourth question is the one the first three leave. A deck lengthens and shortens with temperature, by α ΔT\alpha\,\Delta T times its length, and a concrete deck shortens further, once and for good, as it shrinks and creeps; the movement nobody applied set out that a movement allowed costs nothing and a movement restrained costs a stress. A viaduct allows its movement at its joints, and each joint must take the movement of the deck between it and the next fixed point.

With each group fixed at its middle — on a pier with fixed bearings, or by the stiffness of its own piers — every joint between groups takes the movement of one group’s length: half from each side. Over 40 K, a joint between groups of three moves 10.1 mm, and with 400 microstrain of shrinkage and creep added on the closing side, 18.5. Groups of six move 20 and 37 mm. The continuous viaduct has no joints between groups at all; its two abutment joints each take the movement of half its length, 20 and 37 mm, the same as a joint between groups of six. A twelve-span viaduct continuous throughout has two large joints. Divided into groups of three it has three more joints, each half the size.

A joint is a maintenance item and a ride-quality item — it leaks, it wears, it bangs under every axle — and a large joint is more expensive and more troublesome than a small one. A bearing that slides further is larger and its friction loads its pier more. And restrained movement is the source of the thermal force that the summer that is worse than the last found ratcheting an integral abutment’s soil. Every one of those grows with the length between joints. The size of a viaduct’s groups is set by the joints: how many the owner will maintain, and how large a movement each can take.

What the comparison leaves out

The beam is prismatic and its spans are equal, and every group is the same size. Real viaducts have longer interior spans and shorter end spans, often in the ratio of about 0.8, precisely to bring the end spans’ moments down to the interior ones’, and that also changes the end span’s share of what falls. The piers are rigid supports; a tall pier is a spring, and the deflection that belongs to the support set out how a flexible support shares a beam’s deflection and so its moment. A flexible pier also softens a settlement, so tall piers make continuity cheaper still.

The settlement here is an imposed movement on a beam of constant stiffness. A concrete deck creeps under a settlement that happens slowly, and creep relaxes the settlement moment by roughly a factor of 1+χφ1+\chi\varphi — about two and a half for a deck that settles over its first years. That reduces every settlement moment in the first figure by the same factor and leaves the comparison between divisions as it is: continuity of two spans is still as exposed as continuity of twelve.

The robustness count treats a lost section as a clean cut and a falling piece as gone, and it judges a cantilever only by its moment. The piece that stands has to be held at its pier by the beam continuing over it, and that beam’s next span has to hold the back moment; for a group’s interior spans that is ordinary hogging, but it should be checked, and it has been taken as available here.

Three spans, for the traffic and the joints

A viaduct’s grouping is not a dial between continuity and determinacy, with settlement on one side and robustness on the other. A settling pier finds two spans of continuity as exposed as twelve, so the only defence against settlement in the grouping is to put a joint over the pier at risk. A lost section takes most of a span with it in any division at the strength the traffic asks for, and continuity becomes an alternative path only when the sections are much stronger than that, and then only for spans that have continuity on both sides. What the size of the group actually controls is two things: the traffic’s envelope, least at groups of three, and the movement and number of the joints. Three spans between joints is the conventional answer, and it is the right answer for reasons the conventional explanation does not give.

Still open: the joint over the pier that is expected to settle

The settlement figure found the joint piers to be the least sensitive in the viaduct, at less than two fifths of an interior pier’s settlement moment. A viaduct crossing a valley usually has one or two piers on ground that is worse than the rest, and its designer knows which. Whether a viaduct whose joints are placed over its doubtful piers, with groups of uneven length to put them there, keeps the envelope of groups of three and the settlement tolerance of simple spans at once — and how uneven the groups can be before the envelope’s 4 per cent advantage is spent — needs the grouping searched over joint positions rather than over a single group length.

Named alongside this one

Essays reaching for the same objects. Nobody chose these; they are what the concept index makes visible.

What links here

Every essay whose body links to this one.

The objects this essay names

Each one links to every other essay that touches it.

Alternative load pathCantileverContinuous beamMovement jointPattern loadingRobustnessSupport settlement