The doubtful pier belongs in the middle of a pair
Assumes The moment over the support, and what it buys, The hinge put in on purpose and Where the structure is allowed to move.
What the joints in a viaduct are for divided twelve 7 m spans into continuous groups of one, two, three, six and twelve, and asked each division four questions. A settling pier found two spans of continuity almost as exposed as twelve. A lost section took most of a span with it at any strength the traffic needed. The traffic’s own envelope was least for groups of three, by 4 per cent. And the joints between groups had to take movements that grew with the groups’ length. Three spans between joints came out as the right answer for reasons the conventional explanation did not give.
One observation in that essay pointed somewhere the essay did not go. When the settling pier happened to be a joint pier, carrying the free ends of two groups, its settlement cost less than two fifths of what an interior pier’s did, because an end support’s beam has only one side to bend over. A viaduct crossing a valley usually has one or two piers on worse ground than the rest, and its designer knows which. So the essay ended on the obvious move: put the joints over the doubtful piers, with groups of uneven length to put them there, and see whether the viaduct keeps the envelope of groups of three and the settlement tolerance of simple spans at once.
It keeps neither. But the search over every way of dividing the viaduct finds a better place for a doubtful pier than under a joint, and it is one the earlier essay’s figures had already drawn without remarking on it: the middle of a two-span pair.
The same viaduct, divided any way at all
The viaduct is the same twelve spans of 7 m, a beam of flexural rigidity on rigid piers, carrying 20 kN/m of dead load and 15 of traffic. A division is now a list of group lengths from the left abutment — 3, 3, 3, 3 for the conventional answer, 5, 3, 4 to put joints over the fifth and eighth piers, 1 repeated twelve times for simple spans — and each group is its own continuous beam, solved by the stiffness method with its own supports. There are 2,048 ways to divide twelve spans, and 562 of them use four joints or fewer.
Two piers are doubtful, the fifth and the eighth from the left abutment, and either may settle by an amount nobody can predict well; each figure takes whichever of the two does more harm. Every other pier is firm. Three questions carry over from the earlier essay: the largest moment under the full load when the doubtful piers have settled, the envelope under every arrangement of the traffic on whole spans with nothing settled, and what each division costs in joints and in robustness.
Two doubtful piers, five divisions
With nothing settled, the continuous divisions are the better ones. Groups of three carry 172 kN·m under the full load, the continuous viaduct 181, and the division with joints over the doubtful piers 184, against 214 for simple spans, whose mid-span moment no settlement can change. That is continuity’s dividend: a span with hogging at its ends carries less at its middle.
The dividend is spent quickly. Groups of three pass the simple spans’ 214 at about 9 mm of settlement and reach 367 at 40, because both doubtful piers are interior piers of their groups. Moving the joints onto the doubtful piers — groups of five, three and four — puts each doubtful pier at the end of two groups, where it has only one side to bend, and the moment at 40 mm falls to 315. That is the earlier essay’s suggestion working as it said it would: a seventh off the settlement moment, with one joint fewer than groups of three need.
But a third division does better than either. Groups of 4, 2, 1, 2 and 3 put each doubtful pier in the middle of a two-span pair, with a single simple span between the pairs. Its moment stays at 214 — the simple spans’ value, the most any division carries with nothing settled — until the piers have settled 35 mm, and at 40 mm it is 230, against 315 and 367. At 60 mm it is 297, still below what groups of three reached at 30.
Where in a group a pier can settle
Taking one group at a time shows where the difference comes from. For every group longer than two spans, an end pier is the gentlest to settle and an inner one the worst: for three spans, 302 kN·m at an end and 367 at either inner pier; for six, 313 at an end and up to 392 inside. That ordering is what made a joint pier attractive — and the earlier essay’s 49 kN·m against about 130 was its measure at 15 mm.
The pair breaks the ordering. Its ends give 337 at 40 mm, worse than the end of any longer group, because a two-span beam whose end pier drops has to bend its whole length to follow, with no third span to share the curvature. Its middle gives 230, the least of any pier in any group. A doubtful pier at the end of a pair is in the second-worst place there is; the same pier in the middle of the pair is in the best.
Why a pair can afford to lose its middle pier
The pair’s behaviour can be written down by hand, which is the best evidence there is that the search is not finding an artefact. Two equal spans under a uniform load carry over their middle pier — 214 kN·m here — and the largest sagging moment in each span is , 121. The hogging over the middle pier is the redundant: it is what the continuity puts there, and a settlement of the middle pier takes away of it, as the support that moved derived for an imposed support movement. Here that is , 6.1 kN·m for every millimetre.
So the hogging falls, from 214 towards nothing, and the sagging in the spans rises to meet it. At — 35 mm — the hogging has gone entirely and the pair is carrying its load exactly as two simple spans would: 214 at each mid-span, nothing over the pier. Only beyond that does the middle pier start to hang from the spans, the moment over it turning to sagging, and the span moment rising past 214.
The largest moment a pair carries is therefore at no settlement and at 35 mm, and never more in between. It is the same number a simple span carries, so a pair has exactly the simple spans’ tolerance of a settling middle pier up to 35 mm, and for that range it costs nothing over them. A pair is the one continuous beam whose largest moment is set by its redundant at one end of the range and by statics at the other, and its doubtful pier lives in the gap.
Every division at once
What the pairs give up is the traffic’s envelope. Under every arrangement of the 15 kN/m on whole spans, a group of three has its largest moment at 184 kN·m, the least of any group length, and that 4 per cent over the continuous viaduct’s 192 was the reason the earlier essay settled on three. A group of two cannot do better than a simple span’s 214: its largest moment is the hogging over its middle pier under the full load, , the same number a simple span carries at mid-span, and no arrangement of the traffic lowers it. Any division with a pair or a simple span in it has an envelope of 214.
Plotting all 562 divisions against the two numbers shows how few choices there really are. The envelopes come in four values — 184 for groups of three only, 192 for groups of five or more, 194 for fours, 214 as soon as any group is shorter than three — and at each value one division is best on settlement. Groups of three are the only division at 184, and they carry 367 at 40 mm. Among the divisions at 194, the joints over the doubtful piers are best, at 315. Among those at 214, the pairs are best, at 230. Nothing is better on both counts than any of the three.
So the choice is between paying 5 per cent of envelope to take 52 kN·m off the settlement moment, or paying 16 per cent of envelope to take 137 kN·m off it. Neither keeps groups of three’s envelope; the earlier essay’s hope that uneven groups might keep both is not met by any division.
What it means for the slow settlement that actually happens
A settlement of 40 mm is a large number if it happens in a night and an ordinary one if it happens over twenty years. A concrete deck creeps under an imposed movement that arrives slowly, and the earlier essay took the relaxation as roughly a factor of two and a half, so 40 mm over the deck’s first years acts on its moments like about 16 mm applied at once.
At 16 mm the comparison narrows but does not reverse. Groups of three carry about 250 kN·m, the joints over the doubtful piers about 235, and the pairs 214 — the pairs are still the best, and they are now best by a margin smaller than their envelope penalty. Which is to say that the right division depends on how much the doubtful piers might settle, how fast, and how well that is known. If a geotechnical report says 10 mm, groups of three are right and the doubtful piers can be left inside them. If it says somewhere between 20 and 60 mm and cannot narrow it, the pairs are the division whose worst case is known: 214 kN·m up to 35 mm whatever the creep does, and a slow rise after.
What the pairs cost elsewhere
The joints are the earlier essay’s fourth question. Each group lengthens and shortens about its middle, so a joint between two groups takes half of each one’s movement, times half their combined length. Groups of three put 10.1 mm into each of three joints over a 40 K range. Joints over the doubtful piers need only two, but the group of five beside the first makes it a 13.4 mm joint — a third larger, and a larger, costlier and more troublesome piece of hardware. The pairs need four joints, one more than groups of three, but none of them is larger than 10.1 mm and two are only 5. In joints the pairs cost a joint and the uneven groups cost a size.
The robustness count goes the other way. A lost section is held as a cantilever only from a pier with continuity behind it, so a long group holds more of its spans’ pieces than a short one, and the division with groups of five, three and four loses the least, 3.67 m at twice the envelope against 4.12 for groups of three. The pairs, with their simple span and their four group ends, lose 4.33. The difference is a fifth of a span, at strengths that the slab that catches what the joints let go warns are themselves an upper bound on what a falling piece leaves standing; it is real, and it is the third cost of the pairs.
A third answer that was already on the shelf
The pair is not the only way to make a beam indifferent to a settling support while keeping some of continuity’s benefit, and the comparison with the older one is instructive. Two hinges let in, and nothing lost followed Heinrich Gerber’s idea: put hinges into the spans of a continuous beam at the right places and it becomes statically determinate, settles without a moment, and still carries a hogging over its piers that relieves its spans. Gerber’s beam is determinate everywhere and pays for it with hinges that must be detailed, sealed and maintained in the middle of spans.
The pair is the opposite trade. It stays indeterminate, keeps a redundant moment over its middle pier, and lets the settlement spend that redundant rather than fighting it. Its grace is finite — 35 mm, after which it hangs its pier — where Gerber’s is unlimited, but it needs nothing more unusual than a joint over a pier, the commonest detail on a viaduct. What the two share is the observation that a beam’s sensitivity to a support’s movement depends on whether the movement relieves or adds to the moment that governs the beam, and the moment over the support is the one that a settling pier always relieves.
That observation also says where the pair’s grace is shorter than it looks. The 35 mm is for the full load, and the envelope is not a structure showed that the arrangement of traffic that governs one section is not the one that governs another. With the traffic on one span of the pair and only the dead load on the other, the moment over the middle pier is , 168 kN·m, and the loaded span’s sagging is already 138 rather than 121. The settlement takes the hogging away at the same 6.1 kN·m a millimetre, and the loaded span reaches a simple span’s 214 when the hogging has gone — at 27.5 mm rather than 35. A settled pair under that pattern is a simple span with a slightly heavier load beside it, and its grace is the hogging its pattern happened to give it.
The joints, finally, have their own costs, which the summer that is worse than the last priced for an integral bridge that has none: every joint added to make a pair is a joint that leaks, wears and must be replaced, and the pairs need one more than groups of three.
The pair by hand, and the groups by stiffness
Each group is a continuous beam of equal 7 m spans on rigid supports, cut free at the joints at its two ends, where the next group’s end sits on the same pier but shares no moment with it. The largest moment under the full load is found by the stiffness method with the settled pier’s displacement imposed, and the envelope by superposing each span loaded alone on the dead-load case — the beam is linear, so every pattern is a sum of single spans. The pair is the one group solved by hand as well: the redundant moment over its middle pier is , the end reaction is , and the span’s largest sagging moment is the reaction squared over ; the two routes agree to the kilonewton-metre at every settlement drawn.
The joint movement takes each group as fixed at its middle, by fixed bearings or by its own piers’ stiffness, and the robustness count takes a lost section’s two pieces as standing or falling by their cantilever moment alone, as the earlier essay did.
What the comparison leaves out
The piers are rigid and the settlement is a single number. A real doubtful pier settles on a foundation that is itself a spring, and the deflection that belongs to the support showed how a flexible support shares a beam’s deflection and so its moments. A pier whose settlement grows with the load on it settles more when its pair hogs over it and less once the hogging has gone, which is a soil-structure interaction that would favour the pair further.
The doubtful piers settle one at a time. Each figure takes the worse of the two settling alone. Settled together, they belong to different groups in groups of three and in the pairs, so nothing changes; in the division with joints over them both ends of the group of three drop at once, which lowers that group bodily and takes some of the moment away, so the joints would look a little better than 315.
Every span is 7 m. A real viaduct would make its simple span shorter, or its pair’s spans unequal, and could do so to bring the pair’s envelope back towards the groups’. Equal spans are what make the comparison a comparison of division alone, and they are also what keep the pair’s 35 mm a clean ratio.
Temperature acts on the joints and nowhere else. A group whose middle is fixed and whose ends slide carries no thermal moment; a group with a temperature gradient through its depth does, and the movement nobody applied set out how a restrained curvature is the same kind of imposed deformation as a settlement. A pair whose deck is hotter on top than below is pulled, at its restrained middle pier, into the same sagging moment a settlement causes, and on a summer afternoon some of its 35 mm is already spent before any settlement arrives.
Where the doubtful pier goes
A designer who knows that a pier may settle has three places to put it. Inside a group of three or more, where groups of three’s 184 kN·m envelope is kept and the settlement is felt most, 367 kN·m at 40 mm. Under a joint, where the settlement is felt at a group’s end, 315, for an envelope of 194 and a joint a third larger. Or in the middle of a pair, where the settlement first takes away moment and only later adds it, 214 kN·m up to 35 mm and 230 at 40, for an envelope of 214 and one extra joint. The joint is the answer the earlier essay suggested and it is a real improvement. The pair is better by more than the joint is better than doing nothing, and it is better for a reason that holds for any pair: the redundant a settling middle pier removes is exactly the moment that made the pair’s peak.
Still open: the pier that is doubtful in both directions
Every doubtful pier here settles. Some piers on swelling clay, or over a culvert that may be relieved of its fill, may rise instead, and a pier that might move either way puts the pair’s advantage on one side of the ledger only. A pair whose middle pier rises adds to its hogging at the same 6.1 kN·m a millimetre, from 214 upwards at once, with no 35 mm of grace — worse than a joint pier rising under a group’s end, which lifts one side only. Whether there is a division that is good for a pier whose movement is known in size but not in sign, or whether such a pier is the one case where a pair of simple spans meeting over it is right, needs the search run against a settlement band that straddles zero.
Named alongside this one
Essays reaching for the same objects. Nobody chose these; they are what the concept index makes visible.
- The factor of two belongs to one mode alternative load path · robustness
- The force nobody put in the model alternative load path · robustness
- The section that yielding cannot reach alternative load path · robustness
- The shear whole spans cannot find continuous beam · pattern loading
- The structure that survives losing a member alternative load path · robustness
- The truss sized to lose a diagonal alternative load path · robustness
What links here
Every essay whose body links to this one.
The objects this essay names
Each one links to every other essay that touches it.
Alternative load pathContinuous beamMovement jointPattern loadingRobustnessSupport settlement