Deflection

The second pier undoes the first

A truss continuous over one pier has its reaction set by one jack: lift until the load cell reads the design value, pack the bearing, done. Over three piers the jacks argue. Lifting one pier a millimetre hands 85 per cent of what it gains to the pier beside it, so jacking each pier to its own design reaction in turn leaves half the error after a full round and still a seventh after three. The error that will not go is the one the piers share, which lifting them all together barely moves. Read every pier once and solve for all the lifts together, and one round of the jacks does what ten rounds one at a time cannot.

Assumes Built to the wrong shape on purpose, One support too many, and what it costs to know and Built to the wrong length.

The pier’s share is cut into the members cambered a Pratt truss continuous over two 24 m spans and found that the list of member lengths decides how much of the dead load the middle pier carries. Cut to the continuous list, the truss lands level with 572 kN on its pier; cut as two simple spans, with 480. And a millimetre of shop tolerance on every member scatters the pier’s share by 36 kN, as much as a bearing set 14 mm out of level. The essay’s answer was to set the reaction by force rather than by geometry: land the truss on jacks at the pier, jack until the load cell reads the design reaction, and pack the bearing at whatever height that turns out to be. The members’ errors then go into the bearing’s height, where they do no harm, and not into the reaction.

With one pier there is one redundant and one jack, and the method is complete. The essay ended on the truss with more than one pier. A truss continuous over four spans has three redundants, and they are coupled: lifting one pier changes the reactions at the others. Whether the reactions of such a truss can be set one pier at a time, in some order that does not undo the earlier settings, or whether they must be jacked together to forces solved for at once, was the question.

The answer is that one pier at a time does not work, in any order, for a reason that has nothing to do with order and everything to do with how the piers share the truss.

The same truss over three piers

The truss is the earlier essay’s, continued: eight 3 m panels a span, 3 m deep, chords of 1,680 MN axial stiffness and a web of 630, the dead load at each bottom panel point. Four spans of 24 m stand on five bearings — a pin at the left end, rollers at the three piers and the right end — and it has three redundant reactions. Cut to its continuous list, every member shortened by its own dead-load elongation on level bearings, it lands level with 167 kN at each end, 526 at the first and third piers and 473 at the middle one. Each member is then given a seeded length error with a standard deviation of a millimetre, and the truss lands with other reactions.

Everything about the jacking follows from one matrix: what a millimetre’s lift of each pier does to every bearing’s reaction, with the others held where they are. The truss is linear, so any lifts change the reactions by that matrix times the lifts, and a fabrication’s errors simply add a fixed set of reaction errors to whatever the jacks do.

What one pier’s lift does

What one pier's lift does to every bearing. The change of reaction at every bearing of a Pratt truss of 24 m spans, 3 m deep, continuous over 4 spans, in kN, when one pier is lifted a millimetre with every other bearing held. The first pier gains 3.55 kN and its neighbour loses 3.03, 85% of it; the middle pier gains 4.49. Each column sums to nothing, the truss's own weight being unchanged.
Fig. 1 The change of reaction at every bearing of the four-span truss when one pier is lifted a millimetre with every other bearing held. The first pier gains 3.55 kN and its neighbour loses 3.03, 85% of it; the middle pier gains 4.49 and each of its neighbours loses 3.03. Every column sums to nothing.

Lift the first pier a millimetre and it takes 3.55 kN more of the truss’s weight. That weight has to come from somewhere, since the total does not change, and it comes almost entirely from the pier next to it, which loses 3.03 kN: 85 per cent of the gain. The left end loses 1.4, and the third pier, two spans away, actually gains 0.9, because the truss hinges over the second pier like a seesaw. Lift the middle pier and it gains 4.49 kN, taken almost equally from the two piers beside it.

That 85 per cent is the whole of the difficulty. A jack that lifts one pier to correct its reaction is not correcting that pier alone; it is moving most of the correction one pier along. The pier beside it, which may have been right a moment ago, is now wrong by nearly as much.

One pier at a time

One fabrication, jacked one pier at a time. A Pratt truss of 24 m spans, 3 m deep, continuous over 4 spans, one seeded fabrication with 1.0 mm of tolerance on every member, landed with pier errors of −29.9, 40.4, −6.9 kN; each jacking sets one pier to its design reaction, from the left, three rounds. After the first round the errors are 7.1, 9.4, 0.0; after the third, 7.7, 6.4, 0.0.
Fig. 2 One seeded fabrication of the four-span truss with a millimetre of tolerance, landed with pier reaction errors of −29.9, 40.4 and −6.9 kN, jacked one pier at a time from the left, each to its design reaction, three rounds. After the first round the errors are 7.1, 9.4 and 0.0 kN; after the third, 7.7, 6.4 and 0.0.

Follow one fabrication. It lands with the first pier 29.9 kN light, the second 40.4 heavy and the third 6.9 light. Jack the first pier until it reads its design value: it is lifted, it gains 29.9 kN, and the second pier’s error falls to 15 kN because most of that came from it. Jack the second: it is lowered, losing 15 kN, and both its neighbours gain — the first is now 10 kN heavy, the third 11. Jack the third: right, and the second, which it hands its correction to, is wrong again. After the first round of three jackings the errors are 7.1, 9.4 and nothing — a quarter of where they started. After three rounds, nine jackings in all, they are 7.7, 6.4 and nothing. The jacks are going round in a circle, each undoing most of what the one before it did.

Each jacking of a bridge truss’s pier is a substantial operation: the jacks loaded, the load cells read, the packs adjusted, the jacks released, and the whole truss allowed to settle and be read again. Nine of them is days of work, and at the end of it the piers are 7 kN off their design reactions — a fifth of what an unjacked truss would be.

The order does not help

The largest pier error, jacking by jacking, in four orders. A Pratt truss of 24 m spans, 3 m deep, continuous over 4 spans with 1.0 mm of tolerance, the largest pier reaction error as a share of the landed one, the mean of 40 fabrications, after every jacking of one pier to its design reaction, four rounds. After the fourth round: left to right 0.13, right to left 0.13, middle first 0.23, outer first 0.16.
Fig. 3 The largest pier error as a share of the landed one, the mean of forty fabrications, after every jacking of one pier to its design reaction, four rounds: left to right, right to left, middle first and outer first. After the fourth round, 0.13, 0.13, 0.23 and 0.16. None reaches a twentieth.

The question as posed asked for an order that would not undo the earlier settings, and the forty fabrications say there is none. Left to right and right to left are mirror images and end alike, 0.13 of the landed error after four rounds. Taking the middle pier first, or both outer piers before the middle, changes the path but not the destination: 0.23 and 0.16 after four rounds. In every order the largest error falls quickly through the first round and then almost stops falling.

That shape — a quick start and a long tail — is the signature of an error with two parts that behave very differently, and the pier matrix says what they are. Its three natural shapes are the piers lifting alternately, the middle one up and the outer ones down, which changes the reactions by 8.8 kN per millimetre; the outer piers lifting one up and one down, 2.6 kN per millimetre; and all three lifting together, in proportions of 0.50, 0.71 and 0.50, which changes them by 0.2 kN per millimetre — forty times less than the alternating shape.

Lifting all three piers together barely changes their reactions because it barely changes anything: the truss is lifted bodily off its two end bearings, which are 96 m apart and resist only by the truss’s bending over that length. A fabrication error that puts too much load on all three piers together and too little on the ends is an error in exactly that soft shape, and a jack that lifts one pier cannot correct it without disturbing the stiff shapes by forty times as much. The stiff parts of the error are removed in the first round; the soft part is barely touched in ten.

All together, in one round

Rounds of the jacks: one pier at a time, or all together. The largest pier error as a share of the landed one, the mean of 40 fabrications, against rounds of the jacks — a round being every jack operated once: one pier at a time from the left, 0.49, 0.20, 0.15 after one, two and three rounds; all together from one set of readings, using the truss's own lift matrix, 0.00 after one; using the matrix of a truss whose web does not stretch, 0.30, 0.11, 0.04.
Fig. 4 The largest pier error as a share of the landed one, the mean of forty fabrications, against rounds of the jacks, a round being every jack operated once. One pier at a time: 0.49, 0.20 and 0.15 after one, two and three rounds. All together from one set of readings and the truss’s own lift matrix: nothing after one. All together with the matrix of a truss whose web does not stretch: 0.30, 0.11 and 0.04.

The alternative is the one the question offered second: read every pier’s error once with the jacks in place, solve for the three lifts that cancel all three errors at once, and make the three lifts together. The truss is linear, so with the truss’s own lift matrix the solution is exact, and one round of the jacks leaves no error at all. The lifts it asks for are large — about 32 mm on the worst pier, on average, for a millimetre of shop tolerance — because the soft shape needs a lot of lift for a little reaction. That is a requirement on the jacks’ stroke, and it is the same requirement whichever way the jacking is done: one pier at a time also ends, eventually, at those lifts.

The objection is that the matrix comes from a model, and a model is wrong. Suppose it is badly wrong: a designer who treats the truss as a beam with a rigid web gets a lift matrix whose diagonal is 50 per cent too stiff. Solving with that matrix leaves 0.30 of the error after one round, 0.11 after two and 0.04 after three — every round of the jacks better than a round one at a time, because even a wrong matrix knows that the piers are coupled and roughly how. Each further round solves again from the new readings, and the error falls by about a factor of three each time.

And the matrix need not come from a model at all. The jacks can measure it: lift each pier a millimetre in turn, with the others held, and read every load cell. Three test lifts give the three columns of the truss’s own matrix, the one in the first figure, with the real joints, the real bearings and the real member stiffnesses in it. After that, one round solved from the readings sets every reaction, to the accuracy of the load cells.

More spans, more rounds

How many rounds a truss of more spans needs. Jacked one pier at a time, left to right, with 1.0 mm of tolerance: the mean number of rounds before the largest pier error falls below a twentieth of the landed one, and the share left after the first round, against the number of spans. Two spans, one pier: 1.0 round. Three to six spans: 6.3, 9.7, 9.5, 9.3 rounds, 0.41, 0.49, 0.51, 0.53 left after the first.
Fig. 5 Jacked one pier at a time, left to right, with a millimetre of tolerance: the mean number of rounds before the largest pier error falls below a twentieth of the landed one, and ten times the share left after the first round, against the number of spans. Two spans: one round. Three to six spans: 6.3, 9.7, 9.5 and 9.3 rounds, with 0.41, 0.49, 0.51 and 0.53 left after the first.

The two-span truss is the special case the earlier essay could afford to treat as general. With one pier there is no neighbour to hand the correction to, and one jacking sets the reaction exactly. With two piers, three spans, the pair’s lift matrix already has the soft shape in it, and one pier at a time takes six rounds on average to bring the largest error under a twentieth. With three to five piers it takes nine or ten. The number stops growing because the soft shape’s stiffness, relative to the stiff ones’, stops falling once the truss is a few spans long — every interior pier’s neighbours take about 85 per cent of its gain whatever the length.

Where a truss of several spans lands

Where a truss of several spans lands farthest from its design. The standard deviation of each bearing's dead-load reaction from its design value, in kN, over a hundred fabrications with 1.0 mm of tolerance on every member, landed on level bearings, against the bearing's place along the truss, for two to six spans of 24 m. The ends scatter by 18, 18, 17, 18, 18 kN; the worst pier by 37, 40, 39, 45, 46.
Fig. 6 The standard deviation of each bearing’s dead-load reaction from its design value over a hundred fabrications with a millimetre of tolerance, landed on level bearings, against the bearing’s place along the truss, for two to six spans of 24 m. The ends scatter by 17 or 18 kN; the worst pier by 37 kN for two spans, 40, 39, 45 and 46 for three to six.

The other half of the question was which piers a tolerance-scattered truss lands farther from: the inner or the outer. Landed on level bearings with a millimetre of tolerance, every pier scatters about twice as far as an end bearing — 37 to 46 kN against 17 or 18 — and the inner piers of a long truss a little more than the outer, 46 kN at the middle of six spans against 41 at the first pier. The ends are the bearings that can least feel the members’ errors, because the truss’s bending over its whole length is soft at its ends; the piers sit where the truss is stiffest and where a member’s error is most fully turned into a force.

That is the case for jacking at every pier rather than only some, and it has a corollary. Because the soft shape is soft, a set of pier reactions can be quite wrong while every pier’s height looks right: 0.2 kN per millimetre means a 10 kN shared error in the three piers corresponds to their heights being 50 mm off together, which a survey would see, but an alternating error of 10 kN corresponds to barely a millimetre. The heights reveal the shared error and hide the alternating one; the load cells do the opposite. A truss set by survey alone has its stiff errors left in; one set by jacks one at a time has its soft error left in.

The soft shape is also the forgiving one

The shape the jacks find hardest to set is the shape the truss minds least when it happens by accident. The support that moved found that a continuous structure turns a settlement into moments in proportion to its stiffness against that settlement. A foundation that sinks under all three piers together — a common enough event when the piers stand on the same soft stratum and the abutments on rock — moves the truss in its soft shape, and at 0.2 kN per millimetre it takes 50 mm of shared settlement to move 10 kN between the piers and the ends. A single pier sinking alone moves the truss in the stiff shapes and costs forty times as much.

So the matrix that makes jacking hard is also a statement about what the truss is sensitive to. It is sensitive to differences between neighbouring piers, which the jacks remove in the first round, and insensitive to what all the piers do together, which the jacks remove slowly and which matters little. The residual a one-at-a-time campaign leaves is mostly in the soft shape: an error in how the dead load is shared between the piers as a group and the two ends. That is still an error in the moment diagram — the support moments over all three piers are too large or too small together — but it is the kind of error that a design checked against the movement nobody applied, and against a modest differential settlement, has already allowed for.

Why the web is in the matrix

The rigid-web matrix that a designer might reach for is half as stiff again on its diagonal as the truss’s own, and the difference is the web. The deflection that is not bending showed how much of a truss’s deflection comes from its diagonals and verticals stretching rather than from its chords, and a pier lift is a deflection like any other: the shear it puts through the spans either side stretches their webs. A truss whose web did not stretch would hand a lifted pier’s gain to its neighbours more completely, 5.05 kN of a 5.30 kN gain, 95 per cent. Its soft shape is no stiffer, 0.21 kN per millimetre, while its alternating shape stiffens to 14.5, so the spread between them is seventy-fold rather than forty; and one round of jacking one pier at a time still leaves about half the error, 0.48 against the real truss’s 0.49. The web changes the matrix’s numbers, which is why a solve from the wrong matrix needs extra rounds, and leaves the difficulty of jacking one pier at a time exactly where it was.

The same web is what makes the earlier essay’s cutting list a statement about forces as well as about shape. The camber that lives in the member lengths found every member’s length carrying part of the dead-load shape; over several piers every member’s length also carries part of three reactions at once, and a millimetre’s error in any member moves all three.

Which body was cut, and what was solved

The free body is the whole truss, cut from its five bearings. Its members are pin-ended bars, each of its axial stiffness, with an initial strain equal to its cut length’s departure from its drawn length; its bearings are vertical restraints at prescribed heights, the left end also restrained horizontally. The stiffness method gives the bearing reactions for any lengths and any heights, and because the truss is linear every reaction is its design value plus the fabrication’s error plus the lift matrix times the lifts. The lift matrix’s columns are reactions from unit lifts with no load and no error, and each column sums to nothing, which is the check that the truss’s weight has not moved.

Jacking one pier to its design reaction with the others held is one step of the Gauss–Seidel iteration on that matrix; jacking all together from one set of readings is a direct solve. The convergence of the first is set by the matrix’s coupling, and for a symmetric positive-definite matrix whose smallest eigenvalue is forty times smaller than its largest, the iteration’s long tail is the textbook result, here worked in kilonewtons and packs.

What the jacking model leaves out

The bearings are rigid once packed. A real pier and its bearing compress, and a soft support takes some of the coupling out of the lift matrix — a jack under a pier that is itself a spring hands less of its correction to the next pier. The pier’s share is cut into the members found that a softer support makes the reaction less sensitive to tolerance; here it would also make one-pier-at-a-time jacking converge faster, though nothing short of a support as soft as the truss changes the conclusion.

The load cells are exact. A jack’s load cell reads to a per cent or two of its capacity, and a direct solve inherits those errors; with a lift matrix this badly conditioned, a load-cell error in the soft shape is magnified forty times in the lift it asks for. In practice the readings and the lifts would be checked against the survey, which reads the soft shape best.

Nothing moves between readings. Temperature changes the truss’s shape through the day, as the earlier essay found a degree of sun on the top chord taking 3 kN off the pier, and a jacking campaign that takes days one pier at a time spends some of its effort chasing the weather. A campaign of one round does not.

The live load is absent. The reactions set are the dead-load reactions, which is what the camber and the moment diagram depend on, as the beam built towards its own middle found for a continuous beam’s support moments; the traffic is carried by whatever continuity the jacking leaves.

Still open: the truss jacked while it is still being built

Every truss here is complete before it is jacked. A truss launched or erected span by span is jacked as it grows, and each pier’s reaction is set when the spans beyond it are not yet there, so the coupling that made one pier at a time fail does not yet exist when each pier is set — and then arrives as each new span is joined on. Whether a sequence of settings made as the truss grows can be chosen so that the completed truss lands on its design reactions without a final campaign, as the jack that creep carries past the mark asked of a concrete beam made continuous in stages, or whether each new span’s closure rewrites the soft shape and leaves a final round of the jacks unavoidable, needs the lift matrix of every partial truss along the way.

Named alongside this one

Essays reaching for the same objects. Nobody chose these; they are what the concept index makes visible.

The objects this essay names

Each one links to every other essay that touches it.

CamberFabrication toleranceIndeterminacyLack of fitRedundantSupport settlementTruss