Fabrication tolerance — where it appears
Named by 7 essays across 2 fields — each of them below, with the objects they name alongside it.
The shape that came out of the shop
A weld cools by seven hundred degrees while the plate holds it, so it yields in tension and stays that way. What is left is a locked-in force of three hundred kilonewtons applied where the weld is, and if that is not on the centroid the member leaves the shop bent.
The camber that lives in the member lengths
A beam is cambered by bending it; a truss cannot be, because it has no curvature to bend — its shape is nothing but the lengths of its members. So a truss's camber is a cutting list, and each millimetre on that list arrives at mid-span multiplied by the member's force under a unit load there: two and a half for the middle chords of a truss ten times as long as it is deep, nothing at all for some verticals. Build only the chords to their dead-load strain and a quarter of the sag stays, the webs' share. Cut every member to a millimetre of scatter and the mid-span misses by six, an eighth of the camber.
The counter fitted after the load
A truss with a counter-diagonal in every panel cannot take a change of length for free, so a camber cut into its members might seem to lock force into it. One cutting list locks in nothing — every member shortened by its own dead-load stretch — and the simpler lists lock in little. What locks in force is the shop: a millimetre of error per member puts 174 kN into some member of a truss whose largest dead-load force is 471. Leave the counters loose until the dead load is on and cut them to the gap, and the same errors lock in nothing at all.
The pier's share is cut into the members
A truss continuous over a middle support has one reaction that statics cannot find, and the lengths its members are cut to decide it. Cambered to land level under its dead load on three bearings, a two-span truss puts 572 kN on its pier; cambered span by span, as two simple trusses, the same members on the same bearings put 480 kN there and carry the dead load with no moment over the pier at all. The list chooses the moment diagram. And a millimetre of shop tolerance on every member moves the pier's share as much as a bearing set fourteen millimetres out of level, so a reaction the design depends on has to be set by a jack rather than by a drawing.
The splice that waits for its covers
Put a girder splice's bolts in ordinary clearance holes and every plate has two millimetres to cross before it carries anything. The plates do not cross it together. The ones furthest from the axis arrive first, so at the design moment the web plates are nearly idle, the bottom cover is a third over its stress, and the plate that yields first is chosen by where the erector's drift pin happened to leave the bolts.
The splice that forgets how it was bolted
A girder splice bolted through clearance holes picks up its plates in an order set by how the bolts happened to sit, and under a moment one way a bad fit-up can yield a cover at half the moment a centred one reaches. Reverse the moment and the order is lost: the first excursion pushes every plate across its hole, the fit-up is forgotten, and from then on every splice of 2 mm holes behaves alike. It does not ratchet. It crosses 13.6 milliradians of slack at every reversal, and above about 726 kN·m its covers yield both ways every cycle — 150 below the same splice with fitted bolts.
The second pier undoes the first
A truss continuous over one pier has its reaction set by one jack: lift until the load cell reads the design value, pack the bearing, done. Over three piers the jacks argue. Lifting one pier a millimetre hands 85 per cent of what it gains to the pier beside it, so jacking each pier to its own design reaction in turn leaves half the error after a full round and still a seventh after three. The error that will not go is the one the piers share, which lifting them all together barely moves. Read every pier once and solve for all the lifts together, and one round of the jacks does what ten rounds one at a time cannot.
Named alongside it
The objects these essays reach for when they reach for this one.
CamberLack of fitClearance holeIndeterminacyPreloadRedundantSpliceSupport settlementThermal gradientTrussCompatibilityCounter-diagonal