Concept

Lack of fit — where it appears

A member made longer or shorter than the geometry it has to fit, forced into place during erection. A determinate structure simply changes shape to accept it; a redundant one resists it and carries forces before any load arrives, in proportion to its stiffness.

Named by 6 essays across 3 fields — each of them below, with the objects they name alongside it.

Five millimetres short, and a hundred kilonewtons in every member. An X-braced bay 6 m by 4 m in which one diagonal was fabricated 5 mm short, with the force that leaves in every member. Nothing is applied to this frame. The forces are the self-stress state the frame's one redundancy supports, scaled so that the diagonal is pulled back to the length it should have been: tension in both diagonals at 100 kN, compression in the four members round the outside, and the whole set in equilibrium with nothing. That is 25% of the force the diagonal was sized to carry, and it is there for the life of the structure. Take one diagonal out and the frame becomes determinate: the short member then simply puts the joint somewhere else, and the structure is in the wrong place instead of under stress. Redundancy is bought, and this is the price.

Built to the wrong length

A redundant structure's members do not have independent lengths. Choose all but one and geometry decides the last, so a member made a different length has to be pulled or pushed into place — and the force required stays in the structure for as long as the structure does. Nothing has been applied to it, there is no load case and no factor, and the members are carrying real force.

connections · Fit-up
What a millimetre on each member does at mid-span. A Pratt truss of eight panels, 24.0 m long and 2.4 m deep, carrying 60 kN of dead load at each top node, drawn with its depth exaggerated. Each member is drawn as thick as, and labelled with, the distance mid-span moves for a millimetre's change in that member's length: its force under a unit load at mid-span. The middle top-chord members move it 2.50 mm per mm — the span over four depths — and the chord members fall off towards the supports: 1.25, 1.88, 2.50, 2.50, 1.88, 1.25 along the top chord. The diagonals move it 0.80 per mm and most verticals 0.50; three verticals — the one at mid-span and the two beside the supports — carry nothing under a load at mid-span and move it not at all (dashed). A truss's shape is its members' lengths, weighted like this.

The camber that lives in the member lengths

A beam is cambered by bending it; a truss cannot be, because it has no curvature to bend — its shape is nothing but the lengths of its members. So a truss's camber is a cutting list, and each millimetre on that list arrives at mid-span multiplied by the member's force under a unit load there: two and a half for the middle chords of a truss ten times as long as it is deep, nothing at all for some verticals. Build only the chords to their dead-load strain and a quarter of the sag stays, the webs' share. Cut every member to a millimetre of scatter and the mid-span misses by six, an eighth of the camber.

deflection · Camber
Fit the counters last, and the tolerance locks in nothing. The largest force random length errors lock into an eight-panel Pratt truss with a counter-diagonal in each of its six interior panels, 24.0 m long and 3.0 m deep, carrying 60 kN of dead load at each interior bottom joint, against the errors' standard deviation: the median draw (solid) and the 95th percentile (dashed) with every member fitted in the shop, and the same with the counters left loose until the truss carries its dead load and then cut to the gap (on the axis). With everything fitted, 174 and 288 kN at 1 mm, 348 and 577 at 2 — straight lines, because the force is proportional to the misfit. With the counters fitted last, nothing at any tolerance: the Pratt truss without its counters is determinate, and a determinate truss takes any length error by moving.

The counter fitted after the load

A truss with a counter-diagonal in every panel cannot take a change of length for free, so a camber cut into its members might seem to lock force into it. One cutting list locks in nothing — every member shortened by its own dead-load stretch — and the simpler lists lock in little. What locks in force is the shop: a millimetre of error per member puts 174 kN into some member of a truss whose largest dead-load force is 471. Leave the counters loose until the dead load is on and cut them to the gap, and the same errors lock in nothing at all.

deflection · Camber
The mechanism outcarries the frame that is nearly one. The load on the joint of two bars of 200 MN axial stiffness across 8.0 m against how far it moves down, followed to large displacement: the flat pair with its bars tensioned to 0, 50 and 200 kN with nothing applied, and the same bars raised 3 degrees with no tension, a rise of 210 mm. The raised frame is stiffer at first and snaps through at 11.1 kN, 89 mm down. The flat pair at 200 kN starts at 100 N/mm, carries 11.1 kN at 89 mm and 50 kN at 210 mm, and goes on stiffening; at 50 kN of tension, 50 kN at 242 mm; with none, at 252 mm.

The mechanism that stands up anyway

Two bars in a straight line between two pins are a mechanism by the count, by the rank and by every measure of how nearly a frame folds. Tension them and they carry load: 200 kN of tension gives the joint the stiffness of the same bars raised 1.8 degrees, and where the bars raised 3 degrees snap through at 11 kN, the tensioned flat pair carries 50 kN and goes on stiffening. The stiffness is a lack of fit of four millimetres, which 83 degrees of warmth takes away; compressed, the same pair buckles to rest crooked on one side or the other; and no tension can reach a mechanism that swings rather than shivers.

equilibrium · Determinacy
The middle reaction is a dimension, read off in millimetres. The middle reaction under dead load of a Pratt truss continuous over two 24.0 m spans, 3.0 m deep, carrying 60 kN of dead load at each interior bottom joint, against the height of its middle bearing above the level drawn, cut to the continuous list (solid) and as two simple spans (dashed). At the drawn level the continuous list lands with 572 kN, the analysis's value, and the simple-span list with 480 kN, the two spans' own share. Every millimetre the bearing stands high adds 2.6 kN: 10 mm high, 598 kN; 10 mm low, 545; the simple-span list's 92 kN shortfall is the bearing 35 mm low.

The pier's share is cut into the members

A truss continuous over a middle support has one reaction that statics cannot find, and the lengths its members are cut to decide it. Cambered to land level under its dead load on three bearings, a two-span truss puts 572 kN on its pier; cambered span by span, as two simple trusses, the same members on the same bearings put 480 kN there and carry the dead load with no moment over the pier at all. The list chooses the moment diagram. And a millimetre of shop tolerance on every member moves the pier's share as much as a bearing set fourteen millimetres out of level, so a reaction the design depends on has to be set by a jack rather than by a drawing.

deflection · Camber
Rounds of the jacks: one pier at a time, or all together. The largest pier error as a share of the landed one, the mean of 40 fabrications, against rounds of the jacks — a round being every jack operated once: one pier at a time from the left, 0.49, 0.20, 0.15 after one, two and three rounds; all together from one set of readings, using the truss's own lift matrix, 0.00 after one; using the matrix of a truss whose web does not stretch, 0.30, 0.11, 0.04.

The second pier undoes the first

A truss continuous over one pier has its reaction set by one jack: lift until the load cell reads the design value, pack the bearing, done. Over three piers the jacks argue. Lifting one pier a millimetre hands 85 per cent of what it gains to the pier beside it, so jacking each pier to its own design reaction in turn leaves half the error after a full round and still a seventh after three. The error that will not go is the one the piers share, which lifting them all together barely moves. Read every pier once and solve for all the lifts together, and one round of the jacks does what ten rounds one at a time cannot.

deflection · Camber

Named alongside it

The objects these essays reach for when they reach for this one.

CamberFabrication toleranceIndeterminacySelf-stressCompatibilityPrestressRedundantSupport settlementThermal gradientTrussBolt holeCounter-diagonal

All concepts