Put a girder splice's bolts in ordinary clearance holes and every plate has two millimetres to cross before it carries anything. The plates do not cross it together. The ones furthest from the axis arrive first, so at the design moment the web plates are nearly idle, the bottom cover is a third over its stress, and the plate that yields first is chosen by where the erector's drift pin happened to leave the bolts.

Assumes The joint that has to be as good as the member, The joint that carries nothing until it slips and Plane sections stay plane, and what the assumption costs.

The splice that finds its own axis took a girder with a heavy top flange, spliced it the way splices are usually sized — each flange’s covers to that flange’s force, a pair of web plates for the web — and found that across the gap the plates bend as one section about their own centroid, 48 mm below the girder’s. The web’s net force, which the design had handed to no plate, went to the web plates and the lighter flange’s covers. The web plates’ foot worked at 212 N/mm² against the 163 the design gave it. Every number in that essay rested on one sentence near its end: the bolts were rigid, so the plates were one section from the first newton.

A great many girder splices are not like that. In buildings especially, a beam splice is bolted with ordinary bolts in ordinary holes, tightened snug rather than preloaded. An M20 bolt goes through a 22 mm hole. The plates carry nothing until they have moved far enough for a bolt to touch the side of its hole, and two millimetres is not small beside the strains a working splice plate runs at. A cover 400 mm long at 250 N/mm² stretches less than half a millimetre. So the slack is four times the elastic stretch, and the question that essay left — whether a splice that slips redistributes toward the plates the design meant to carry the load or away from them — turns out to have an answer that is mostly about geometry, and only a little about bolts.

Each plate has its own gap to cross

The girder is the same: a web 573 mm by 11.9, a bottom flange 229 by 19.6, a top flange 300 by 30, its neutral axis 374 mm above the underside. The splice is the flange-by-flange design from before, sized at 250 N/mm² for 700 kN·m: an outer cover and a pair of inner covers on each flange, and two web plates 480 mm deep and 8 mm thick. The top flange has ten bolts each side of the gap and the bottom flange eight, each passing through the outer cover, the flange and the inner covers. The web plates are fastened by six rows of two bolts at 80 mm, each bolt passing through both plates and the web.

Across the gap the two halves of the girder turn as rigid bodies, so at any height the halves have moved apart by an amount that grows linearly with distance from the line where they have not moved at all. Each plate is a short chain: the plate itself, 400 mm of steel; then the interface, where the plate either grips by friction or slides until a bolt reaches its hole; then the bolts, which deform in shear and bearing once they are touching, about 130 kN per millimetre for each bolt on each shear plane. Each plate’s holes are drilled as one pattern, so its bolts sit together in their holes; the play is a millimetre each way in each half, two millimetres in all before a plate pulled open bears.

Where a spliced girder turns, held by friction and in clearance holes. The moment across a girder splice against the rotation of its two halves at the gap. Preloaded bolts hold the plates by friction and the splice turns 1.6 mrad at 700 kN·m; snug bolts centred in 2 mm of clearance turn 11.7 mrad by the time the plates have taken it, and one drawn fit-up 12.5. All three reach the plates' plastic moment of 1,164 kN·m.
Fig. 1 The moment across the splice against the rotation of the two halves at the gap. Held by friction the splice turns 1.6 mrad at the design moment of 700 kN·m. With the bolts centred in 2 mm clearance holes it turns nothing until about 6 mrad and 11.7 by the design moment; one drawn fit-up turns 12.5. All three reach the plates’ plastic moment of 1,164 kN·m.

Three splices are drawn. In the first the bolts are preloaded, each M20 of grade 10.9 clamped to 171.5 kN on a blasted surface with a slip factor of 0.5, so every plate grips its flange or web by friction and never reaches its holes at working load. In the second the bolts are snug, carrying no friction worth counting, and every bolt sits centred in its hole. In the third the bolts are snug and each plate’s pattern sits wherever the fit-up left it, drawn at random within the play.

The preloaded splice is stiff from the start and stays nearly straight until a plate yields at 936 kN·m; beyond about 1,000 its plates begin to slide, one by one, and the curve flattens in steps. The snug splices do nothing at all for the first 6 mrad. That is the rotation at which the two outer covers, the plates furthest from the axis, have each opened or closed by two millimetres. Then they take load, and the rest follow.

The plates that arrive last carry least

At any rotation, the opening a plate sees is its distance from the axis times the rotation. A plate only carries what it sees beyond its clearance. With the same clearance everywhere, the plate twice as far from the axis has been carrying load for the whole of the time the nearer one has been crossing its gap. So the order in which plates come into play is simply their order of distance, outermost first, and a plate near the axis may never arrive at all.

Which plates carry the moment, held and in clearance holes. Each plate's stress against its height across the gap at 700 kN·m: the four covers and six rows of web bolts. Held by friction the plates bend as one section, the bottom outer cover at 270 N/mm² and the web plates' lowest row at 180. In centred clearance holes four of the web rows carry nothing, and the bottom outer cover works at 341.
Fig. 2 Each plate’s stress against its height across the gap at 700 kN·m. Held by friction the plates fall on one straight line through 326 mm, the bottom outer cover at 270 N/mm². With the bolts centred in clearance holes the four middle web rows carry nothing and the covers carry it all, the bottom outer at 341. The drawn fit-up scatters them: its bottom inner cover has reached yield while the outer beside it is at 154.

The friction-held splice reproduces the earlier essay’s plane sections almost to the newton — 245, 214, 270 and 247 N/mm² in the four covers against the 244, 213, 269 and 246 found with rigid bolts, because a plate held by friction does not ask its bolts to deform. Its web plates’ lowest row of bolts sits at 180 N/mm². The centred snug splice is a different structure. Its four covers work at 297, 214, 341 and 279 N/mm². Its top web row carries 27 and its bottom row 75 in compression. The four rows between carry nothing, because at 11.7 mrad a row has to be more than 170 mm from the axis to have crossed its two millimetres, and those four are within that.

The bottom outer cover at 341 N/mm² is 36 per cent over the 250 it was designed to, against 8 per cent with the plates held. It is the furthest plate from the axis, so it was first to bear, and it has been gathering stress the whole time the plates nearer the axis have been crossing their gaps. Nothing about its own bolts or its own area decided that; its position did.

The web goes idle

The earlier essay’s warning was about the web plates. Plane sections gave them a share of the section’s moment about an axis well below the web’s centre, and their foot worked 30 per cent harder than the hand design said. Slack reverses that completely.

The web plates' share of the moment. The part of the splice's moment carried by the web plates, against the moment. Held by friction they carry 17% of it at 700 kN·m. In centred clearance holes they carry 4%, and take a share only as the covers yield; the drawn fit-up gives them 12%.
Fig. 3 The share of the splice’s moment carried by the web plates, against the moment. Held by friction they carry 17% of it at 700 kN·m. In centred clearance holes they carry 4%, rising only once the covers begin to yield, past 750 kN·m, to 16% at 1,000. The drawn fit-up, whose web rows happen to sit close to their holes, gives them 12%.

At the design moment the web plates of the centred snug splice carry 4 per cent of the moment, and the four middle rows carry no force at all. The web’s share climbs only when the covers yield, because a cover at its yield force cannot take any more and the rotation that follows is free to push the web rows across their gaps. Beyond 1,000 kN·m the web plates are working, and by the plastic moment they carry what their area and lever arm allow, as they would have with any bolts.

There is an irony in this that is worth stating plainly. The flange-by-flange design gave each flange’s force to its covers and gave the web plates only the web’s own moment about its centre. For a splice with fitted or preloaded bolts that was wrong, because the plates bend as one section and the web plates carry much more. For a splice in clearance holes it is very nearly right about the web plates. They do carry almost nothing beyond a small moment, because the slack keeps them out of the way. What it gets wrong is the covers. A design that hands the covers everything because the web plates are idle has also to give them the whole of the moment that the web plates would have carried, and it did not: it gave each flange’s covers that flange’s force and no more. The 249 kN of web force that the earlier essay found unassigned has now gone, with the web plates’ share of the moment, into the covers.

The lighter flange’s covers are where it lands, because they are the furthest from the axis. Clearance turns the earlier essay’s worry upside down: the web plates are safe and idle, the bottom covers overloaded, and a check made by plane sections at the gap would have found the opposite.

The axis the plates choose

A splice whose plates arrive in turn has to bend about some line, and the line is wherever the forces of the plates that have arrived balance. With every bolt held by friction, it is the plates’ own centroid. With slack it is something else.

The line the splice bends about, as the moment grows. The height across the gap at which the two halves do not move apart, against the moment. Held by friction it is the plates' own centroid, 326 mm up, 48 below the girder's 374. In centred clearance holes it sits at 320 at 700 kN·m; the drawn fit-up puts it at 261.
Fig. 4 The height at which the two halves of the girder do not move apart, against the moment. Held by friction it is the plates’ centroid, 326 mm up, 48 below the girder’s 374. With the bolts centred in clearance holes it sits at 320 by the design moment and rises toward the girder’s as the covers yield. The drawn fit-up holds it at 261 and climbs only slowly.

With every bolt centred the axis is close to the plates’ centroid, at 320 mm: symmetry of the slack keeps it near where the plates’ areas put it, and the covers that bear first are on both sides. As the bottom cover yields, the axis climbs, because the compression side has to find its force somewhere else and the web rows below the axis begin to bear. By 900 kN·m it is at 341, and it approaches the girder’s own axis only as the section approaches its plastic state.

The fit-up drawn is the more realistic picture, and its axis is at 261 mm — 113 below the girder’s and 65 below the plates’ centroid. Across forty fit-ups with the bolts anywhere in their holes, the axis at the design moment falls anywhere from 262 to 394 mm. That is the third axis the earlier essay asked about. It is neither the girder’s line nor the plates’, and it is not a property of the section: it is set by where each plate’s bolts happened to sit when the erection crew drove the drift pins and tightened the nuts. The bolt group has no neutral axis found that a group of discrete fasteners rotates about a point that moves with the load. A splice in clearance holes is the same finding at the scale of a whole section.

Where the drift pin left the bolts

A drift pin is driven through a pair of holes to line them up, and the bolts are put in beside it. Holes in plates drilled in one shop and in a girder drilled in another are never exactly opposite, so after the pins come out each plate’s pattern sits somewhere in its play, nearer one side than the other. A plate pulled toward the side its bolts already touch carries load from the first millimetre of movement. A plate pulled the other way has the whole four millimetres of play in its two halves to cross.

When the first plate yields, against the fit-up. The moment at which the first splice plate yields, over seeded fit-ups in which each plate's bolts sit anywhere within the given fraction of their holes' play: the mean and the 5% fractile. Centred, 752 kN·m; anywhere in the holes, a mean of 571 and a 5% fractile of 392. Preloaded, 936.
Fig. 5 The moment at which the first splice plate yields, over forty seeded fit-ups in which each plate’s bolts may sit off centre by up to the given fraction of their play: the mean and the 5% fractile. Centred, 752 kN·m. Anywhere in their holes, a mean of 571 and a 5% fractile of 392. Preloaded, 936; the design moment is 700.

With every bolt centred, the first plate to yield is the bottom outer cover, at 752 kN·m — 7 per cent above the design moment, against 34 per cent with the plates held. Let the bolts sit anywhere in their holes and the mean falls to 571, under the design moment, and one fit-up in twenty puts the first yield at 392 kN·m or below. The worst of forty is 373.

Which plate yields first changes from draw to draw. In the fit-up drawn throughout, it is the bottom inner cover, whose bolts happened to sit hard against the compression side of their holes; it carried load from the start and reached 355 N/mm² at 481 kN·m, while the outer cover beside it, whose bolts sat the other way, was still at 154. In other draws it is a top cover, or the outer, or the inner. The plate that yields is the plate that arrived early, and arriving early is a matter of a millimetre in a hole.

This is the bolts that arrive one at a time one level up. There, a group of identical bolts in one lap reached bearing in turn and the group’s strength was barely touched, because a bolt can travel eight millimetres before it fails and the arrivals were spread over four. Here the elements arriving in turn are whole plates, and the property that decides whether the spread matters is how far a plate can stretch before it yields: under seven tenths of a millimetre in a 400 mm cover, against the two millimetres of slack. The plates cannot absorb the scatter elastically, so they absorb it plastically.

How much clearance it takes

The clearance itself can be varied: none, for fitted bolts that still deform in their holes; the normal 2 mm for an M20; an oversize 4 mm, which steelwork specifications allow where fit-up needs it and which the hole made bigger so the steel would fit priced for a slip-resistant joint.

When the first plate yields, against the clearance. The moment at which the first splice plate yields, against the clearance of the holes: with every bolt centred, and at the 5% fractile of fit-ups with the bolts anywhere in their holes. With no clearance 902 kN·m. At the normal 2 mm, 752 centred and 392 at the fractile; at an oversize 4 mm, 663 and 335.
Fig. 6 The moment at which the first splice plate yields, against the clearance of the holes, with every bolt centred and at the 5% fractile of fit-ups with the bolts anywhere in their play. Fitted, 902 kN·m. At 2 mm, 752 centred and 392 at the fractile; at 4 mm, 663 and 335. Preloaded, 936.

The centred line falls steadily, from 902 kN·m with no clearance to 752 at 2 mm and 663 at 4. The fitted case already sits below the preloaded one, because fitted bolts still deform in shear and bearing and the web plates, held by two bolts a row, are softer for it than the covers held by eight or ten. That is the earlier essay’s plane sections with a little give in every fastener, and it already moves stress from web to covers.

The fractile line falls much faster, and most of its fall comes in the first millimetre. With half a millimetre of clearance the random fit-up already has a spread of slack larger than any plate can stretch elastically. After that the shape of the line is set: more clearance means a longer journey for the late plates, but the early ones were already at their yield before the late ones arrived.

What does not change is the end. Every one of these splices reaches 1,164 kN·m, the plates’ plastic moment, because every plate yields before its bolts shear. The bottom outer cover yields at 623 kN, which is 78 kN on each of its eight bolts on one plane, and a grade 10.9 M20 shears at about 122. Each web row yields at 454 kN, 114 kN a plane. A designer checking strength at the ultimate limit state would find nothing wrong. The joint that carries nothing until it slips set out why a joint is designed twice, once for slip and once for strength, and the splice in clearance holes is the case where the second check passes and says nothing about the first.

The sag the splice adds

A splice that turns 11.7 mrad at the design moment puts a kink in its girder. The girder spliced at mid-span of a 12 m simple span drops by a quarter of the span times the rotation there, as a hinge would.

What the splice adds to the girder's sag. The deflection the splice's rotation adds at the middle of a 12 m girder spliced there and carrying 700 kN·m, against the clearance: centred, and the 95% fractile of fit-ups. The girder's own deflection under a uniform load giving that moment is 38 mm; preloaded, the splice adds 4.7. At the normal 2 mm it adds 35 centred and 45 at the fractile.
Fig. 7 The deflection added at the middle of a 12 m girder by a splice there carrying 700 kN·m, against the clearance, with the bolts centred and at the 95% fractile of fit-ups. Preloaded, the splice adds 4.7 mm. At 2 mm clearance it adds 35 mm centred and 45 at the fractile — against the girder’s own 38 mm under a uniform load that gives the same moment.

The girder’s own deflection, under a uniform load that produces 700 kN·m at mid-span, is 38 mm, a span over 313. A splice in centred 2 mm holes adds 35 mm to that, very nearly doubling it, and a fit-up at the 95th percentile adds 45. Most of that is the slack being taken up before any plate carries anything: the 6 mrad of free rotation alone gives 18 mm. The preloaded splice adds 4.7.

The deflection is not lost on unloading. A plate that slid across its clearance stays where it went, because nothing pushes it back, and when the load comes off the plates relax only by their elastic stretch. The girder keeps a permanent kink at its splice, and a permanent sag of most of what the slack added. The second time the same moment is applied, the plates are already bearing and the splice is stiff; it has bedded in. A splice that sees moments of one sign only pays the slack once, as a sag that a camber can be set to absorb. A splice that sees both signs pays it every time the moment reverses, across four millimetres of play instead of two.

What the model of the plates leaves out

Every plate is lumped as one element: its bolts move together in their holes and come into bearing at one instant. Within a plate they need not, if its holes were not drilled true to one another, and then each plate is itself the group that the bolts that arrive one at a time followed — which spreads one plate’s arrival over a part of its play rather than moving it. Two fasteners that never arrive together found the same of a weld and a bolt sharing a joint: crossing a clearance is quick beside the range a ductile fastener has. The bolt stiffness of 130 kN per millimetre is a mid-range figure. Changing it changes how steeply each plate takes load once it bears, and does not change the order in which the plates arrive at all, since a plate arrives when its movement crosses its clearance whatever its stiffness.

Snug bolts are given no friction at all. A real snug-tight bolt clamps with some tens of kilonewtons, and a cover with ten bolts can hold a few tens of kilonewtons before it slides. That would delay the start of the curve; at the design moment a cover carries several hundred kilonewtons, so a snug bolt’s friction moves the order of arrival little.

The two halves of the girder are rigid, and only the cut is modelled. Shear across the gap is carried by the web plates in a real splice, and it would push their bolts against one side of their holes before any moment arrived — a fit-up of its own, imposed by gravity, which would bring the web rows into play earlier on one side and later on the other. The plates are stocky, so a cover in compression yields rather than buckles between its bolts. And the girder is held at no point but its ends, so the splice’s kink costs only sag; in a continuous girder it would move moment out of the span and onto the supports.

A structure set at the erection

The splice with fitted bolts and the splice in clearance holes have the same plates, the same bolts and the same plastic moment. At working load they are different structures. In the first the plates share the moment by their stiffness about their own centroid, and the web plates work harder than the hand design gave them. In the second the plates share the moment in order of their distance from the axis, the web plates are idle, the outermost covers carry what the web plates would have, and the axis the whole splice bends about is fixed, in the end, by where each bolt sat in its hole when the nuts went on.

None of that is visible from the drawing, and almost none of it is visible to a strength check, which looks at the end of the curve where all the splices agree. It shows up as a cover that yields at half the design moment in one splice in twenty, and as a girder that sags at its splice twice as far as its own stiffness allows. Preloading the bolts, which a designer chooses for reasons of fatigue or of slip, is what removes it, and the preloaded splice is the only one of the three whose plates do what plane sections say they do.

Still open: the splice the moment crosses both ways

Everything here is loaded once, in one direction. A splice placed near the point of contraflexure of a continuous girder, where splices are often put because the moment is small there, carries sagging moment under one pattern of load and hogging under another, and every reversal asks each plate to cross its whole play again, four millimetres instead of two. The plates that bedded in on the way up are the ones furthest from their holes on the way back. Whether a splice that reverses settles into a cycle whose rotation is the clearance and nothing more, or whether the plates that yielded early on one side keep a permanent stretch that ratchets with every reversal — and whether a structure that settles down has anything to teach a joint whose slack is not plastic but geometric — is what a girder whose live load moves along it would ask of this one.

Named alongside this one

Essays reaching for the same objects. Nobody chose these; they are what the concept index makes visible.

What links here

Every essay whose body links to this one.

The objects this essay names

Each one links to every other essay that touches it.

Clearance holeFabrication toleranceFirst yieldNeutral axisPlane sectionsPreloadSlip resistanceSplice