Creep — where it appears
Named by 27 essays across 5 fields — each of them below, with the objects they name alongside it.
The deflection that arrives three years late
A concrete beam that passes every check on the day it is built goes on deflecting for a decade, and ends up three times where it started. Nothing about the load changed, and nothing about the strength was ever in question.
The strain that was imposed, and the stress that leaked away
Multiply a restrained shrinkage strain by the modulus and the answer is three times the tensile strength — which predicts that every restrained concrete member ever cast has cracked. Most have not, and the reason is that the material creeps while it is being stressed.
The hour that is really a temperature
A fire rating is quoted in minutes and there is no time in the physics anywhere. What decides is a temperature, and the stiffness reaches its limit sixty degrees before the strength does — so the way a member fails can change while it is burning.
The structure that was never complete
Every analysis in this collection is of a finished structure loaded once. Real ones are built in pieces, and each piece carries whatever was present at the moment it became structural — so the stress in a member depends on when it arrived, which appears nowhere on any drawing.
The column that stops
A load path that runs straight to the ground costs almost nothing. Interrupting one costs depth in proportion to the square root of the load times the distance it is moved — and the interruption's own deflection becomes the settlement of everything standing on it.
Built to the wrong shape on purpose
A cambered beam is fabricated curved upward so that load bends it down to something like straight. Nothing in the analysis changes, no stress anywhere is altered, and almost every mistake made with it is a bookkeeping mistake about which loads count.
A section made of two materials, one of them pretended away
Multiplying a material's width by the ratio of the moduli produces a fictitious section of one material with the right neutral axis and the right forces. It is not a trick — it is compatibility and Hooke's law written down — and it says a stiff material takes what its modulus asks for.
The columns are shorter than the core
Every column in a tall building gets shorter as the building is built on top of it, and the core beside it gets shorter by a different amount. The floors between them tilt by the difference — and the difference is largest exactly half way up, because a floor near the top has almost nothing built above it and a floor near the bottom has almost nothing beneath it.
Four inequalities and a wedge
A prestressed section has to satisfy two stress limits when the force is largest and the load smallest, and two more when the force has relaxed and the load has arrived. Each is linear in one over the force — which turns a search for a prestress into a region on a page, and turns an impossible section into an empty one.
The column that fails years later
A concrete column under sustained load goes on straining at constant stress, so its deflection grows — and because the second-order moment is the load times that deflection, the demand grows with it. There is a load below which the two settle and one above which they never do.
Stiffer than its cracked section says
At a crack the concrete below the neutral axis has gone and the steel carries the tension alone. Between the cracks it has not gone — bond drags it back into tension, the steel strain drops, and the curvature averaged over a length of beam is neither section's.
The section that changed while it was being loaded
A stress is computed from a moment and a section modulus. When part of the moment arrived while the section was a different shape, there is no single section modulus to divide by — the stresses add and the properties do not, and two identical finished beams can differ by half again in stress with nothing on the drawing to say which is which.
The curvature nobody applied
Concrete shrinks as it dries, by about half a millimetre in every metre. In a symmetrically reinforced member that is a shortening and nothing else. In a member with more steel in one face than the other — which is every beam and every slab — the steel holds one side back and the section bends, with no load on it at all.
The gap nobody computed
A movement joint is sized by adding up everything the structure will do to it, and the deflection calculation — the only term anybody computes carefully — is usually the smallest one in the list. The largest is a construction tolerance, which is not a structural quantity at all, and the sum of the extremes is nearly twice what treating them as independent would ask for.
The load that was left on too long
A timber beam that carries a load for fifty years fails at about fifty-nine per cent of the stress the same beam carries for five minutes in a testing machine. Nothing about the load varies, the member need not have deflected, and the relation between the two is a straight line on a logarithmic time axis over ten decades.
The limit that depends on a date
Total deflection can nearly always be met, and on a long span it is met with camber. The limit that actually decides the member is the other one — the deflection occurring after the brittle finishes are built — and camber does nothing for it whatever, because it is subtracted from both terms of a difference. The same beam passes or fails on the day the partitions went up.
The arch that gets shorter
A parabolic arch under a uniform load is funicular, so the perfect solution gives it no bending at all. Then the rib shortens under its own thrust by a tenth of a per cent, and every kilonewton-metre of moment the arch will ever carry comes from that.
The strength it had on the day
Every concrete strength on this site is a twenty-eight-day cylinder value, and a structure is loaded long before that — formwork struck at three days, the next storey cast at seven, a prestressing force transferred at two. The number that existed at the moment the load arrived is a different one.
Counted, not checked
A column with pinned ends and no bracing cannot buckle on its own, so nothing about it fails a stability check. It still carries load, and load with no stiffness attached lowers the buckling load of everything around it — which is why a gravity-only column is put on the frame model and never designed by itself.
The stress that leaks away
Creep makes a load's deflection grow and an imposed strain's stress shrink, and the second is why restrained concrete does not crack as often as an elastic calculation says. The same material property runs both ways, and which way it runs depends on whether the structure was given a force or a movement.
The creep that belongs to the member
A creep coefficient is quoted for a concrete, and half of it is not a property of the concrete. It is the member drying out, and drying goes through the surface — so one mix creeps a quarter more in a thin slab than in a deep beam, gets there years sooner, and in saturated air forgets its size altogether.
The slab that dries from one face
A creep coefficient is one number for a member, and a member drying through one face does not have one. Give every depth its own humidity and the section a strain profile it cannot deliver, and two things follow that no single coefficient contains — a six-metre slab lifts eleven millimetres at its edges with nothing on it, and its top surface is past cracking before it has been loaded.
The support that had no moment when it was cast
Two beams are set on their bearings, carry their own weight for a month, and are then stitched together over the middle support. Nothing about the loading changes afterwards. Twenty years later the stitch is carrying 155 kilonewton-metres, because the concrete went on creeping and the joint would not let it — and how much arrives is decided by a crane schedule.
The prestress the member takes back
A tendon is stretched, locked off against the concrete, and then has to hold that extension while the concrete underneath it shortens by itself. Fifteen per cent of the force goes, most of it to creep, and how much goes is decided by the shape of the member and the air it stands in rather than by anything about the steel.
The slab that shrinks onto a finished beam
A precast beam with an in-situ slab cast on it is one member made of two concretes, and they do not age together. The slab's shrinkage is nearly the same whenever it is poured; what changes is how much shrinking the beam has left to share it with. Cast the slab at six weeks and it takes a ninth of the soffit's precompression away over thirty years. Cast it at a year and it takes a quarter, and goes into tension itself.
The angle made in the casting yard
A bridge bearing is designed for the rotation of the beam it carries, and the rotation is listed as a sum of load, temperature, creep and a tolerance. Followed through the life of a pretensioned beam, the largest term is none of those. It is the upward turn the prestress gives the beam's ends in the casting yard, before any bearing exists, and under every load the beam will ever carry its ends still point up.
The pier that bends the wrong way
Two precast beams are made continuous over a pier by a joint cast with the deck, and the joint is designed for the hogging moment a continuous beam has there. Thirty years later it is sagging, by more than the moment that cracks its underside, because the beams were still cambering upward when they were joined. Whether that happens is decided by two dates — when the beams were cast and when the joint was — and the deck's shrinkage, which pulls the other way, is not enough to stop it.
Named alongside it
The objects these essays reach for when they reach for this one.
ServiceabilityShrinkageImposed deformationComposite actionPrestressConstruction sequenceDeflectionEffective modulusSuperpositionAgeingCamberElastic modulus