Creep — where it appears
Named by 52 essays across 7 fields — each of them below, with the objects they name alongside it.
The deflection that arrives three years late
A concrete beam that passes every check on the day it is built goes on deflecting for a decade, and ends up three times where it started. Nothing about the load changed, and nothing about the strength was ever in question.
The strain that was imposed, and the stress that leaked away
Multiply a restrained shrinkage strain by the modulus and the answer is three times the tensile strength — which predicts that every restrained concrete member ever cast has cracked. Most have not, and the reason is that the material creeps while it is being stressed.
The hour that is really a temperature
A fire rating is quoted in minutes and there is no time in the physics anywhere. What decides is a temperature, and the stiffness reaches its limit sixty degrees before the strength does — so the way a member fails can change while it is burning.
The structure that was never complete
Every analysis in this collection is of a finished structure loaded once. Real ones are built in pieces, and each piece carries whatever was present at the moment it became structural — so the stress in a member depends on when it arrived, which appears nowhere on any drawing.
The column that stops
A load path that runs straight to the ground costs almost nothing. Interrupting one costs depth in proportion to the square root of the load times the distance it is moved — and the interruption's own deflection becomes the settlement of everything standing on it.
Built to the wrong shape on purpose
A cambered beam is fabricated curved upward so that load bends it down to something like straight. Nothing in the analysis changes, no stress anywhere is altered, and almost every mistake made with it is a bookkeeping mistake about which loads count.
A section made of two materials, one of them pretended away
Multiplying a material's width by the ratio of the moduli produces a fictitious section of one material with the right neutral axis and the right forces. It is not a trick — it is compatibility and Hooke's law written down — and it says a stiff material takes what its modulus asks for.
The columns are shorter than the core
Every column in a tall building gets shorter as the building is built on top of it, and the core beside it gets shorter by a different amount. The floors between them tilt by the difference — and the difference is largest exactly half way up, because a floor near the top has almost nothing built above it and a floor near the bottom has almost nothing beneath it.
Four inequalities and a wedge
A prestressed section has to satisfy two stress limits when the force is largest and the load smallest, and two more when the force has relaxed and the load has arrived. Each is linear in one over the force — which turns a search for a prestress into a region on a page, and turns an impossible section into an empty one.
The column that fails years later
A concrete column under sustained load goes on straining at constant stress, so its deflection grows — and because the second-order moment is the load times that deflection, the demand grows with it. There is a load below which the two settle and one above which they never do.
Stiffer than its cracked section says
At a crack the concrete below the neutral axis has gone and the steel carries the tension alone. Between the cracks it has not gone — bond drags it back into tension, the steel strain drops, and the curvature averaged over a length of beam is neither section's.
The section that changed while it was being loaded
A stress is computed from a moment and a section modulus. When part of the moment arrived while the section was a different shape, there is no single section modulus to divide by — the stresses add and the properties do not, and two identical finished beams can differ by half again in stress with nothing on the drawing to say which is which.
The curvature nobody applied
Concrete shrinks as it dries, by about half a millimetre in every metre. In a symmetrically reinforced member that is a shortening and nothing else. In a member with more steel in one face than the other — which is every beam and every slab — the steel holds one side back and the section bends, with no load on it at all.
The gap nobody computed
A movement joint is sized by adding up everything the structure will do to it, and the deflection calculation — the only term anybody computes carefully — is usually the smallest one in the list. The largest is a construction tolerance, which is not a structural quantity at all, and the sum of the extremes is nearly twice what treating them as independent would ask for.
The load that was left on too long
A timber beam that carries a load for fifty years fails at about fifty-nine per cent of the stress the same beam carries for five minutes in a testing machine. Nothing about the load varies, the member need not have deflected, and the relation between the two is a straight line on a logarithmic time axis over ten decades.
The limit that depends on a date
Total deflection can nearly always be met, and on a long span it is met with camber. The limit that actually decides the member is the other one — the deflection occurring after the brittle finishes are built — and camber does nothing for it whatever, because it is subtracted from both terms of a difference. The same beam passes or fails on the day the partitions went up.
The arch that gets shorter
A parabolic arch under a uniform load is funicular, so the perfect solution gives it no bending at all. Then the rib shortens under its own thrust by a tenth of a per cent, and every kilonewton-metre of moment the arch will ever carry comes from that.
The strength it had on the day
Every concrete strength a design quotes is a twenty-eight-day cylinder value, and a structure is loaded long before that — formwork struck at three days, the next storey cast at seven, a prestressing force transferred at two. The number that existed at the moment the load arrived is a different one.
Counted, not checked
A column with pinned ends and no bracing cannot buckle on its own, so nothing about it fails a stability check. It still carries load, and load with no stiffness attached lowers the buckling load of everything around it — which is why a gravity-only column is put on the frame model and never designed by itself.
The stress that leaks away
Creep makes a load's deflection grow and an imposed strain's stress shrink, and the second is why restrained concrete does not crack as often as an elastic calculation says. The same material property runs both ways, and which way it runs depends on whether the structure was given a force or a movement.
The creep that belongs to the member
A creep coefficient is quoted for a concrete, and half of it is not a property of the concrete. It is the member drying out, and drying goes through the surface — so one mix creeps a quarter more in a thin slab than in a deep beam, gets there years sooner, and in saturated air forgets its size altogether.
The slab that dries from one face
A creep coefficient is one number for a member, and a member drying through one face does not have one. Give every depth its own humidity and the section a strain profile it cannot deliver, and two things follow that no single coefficient contains — a six-metre slab lifts eleven millimetres at its edges with nothing on it, and its top surface is past cracking before it has been loaded.
The support that had no moment when it was cast
Two beams are set on their bearings, carry their own weight for a month, and are then stitched together over the middle support. Nothing about the loading changes afterwards. Twenty years later the stitch is carrying 155 kilonewton-metres, because the concrete went on creeping and the joint would not let it — and how much arrives is decided by a crane schedule.
The prestress the member takes back
A tendon is stretched, locked off against the concrete, and then has to hold that extension while the concrete underneath it shortens by itself. Fifteen per cent of the force goes, most of it to creep, and how much goes is decided by the shape of the member and the air it stands in rather than by anything about the steel.
The slab that shrinks onto a finished beam
A precast beam with an in-situ slab cast on it is one member made of two concretes, and they do not age together. The slab's shrinkage is nearly the same whenever it is poured; what changes is how much shrinking the beam has left to share it with. Cast the slab at six weeks and it takes a ninth of the soffit's precompression away over thirty years. Cast it at a year and it takes a quarter, and goes into tension itself.
The angle made in the casting yard
A bridge bearing is designed for the rotation of the beam it carries, and the rotation is listed as a sum of load, temperature, creep and a tolerance. Followed through the life of a pretensioned beam, the largest term is none of those. It is the upward turn the prestress gives the beam's ends in the casting yard, before any bearing exists, and under every load the beam will ever carry its ends still point up.
The pier that bends the wrong way
Two precast beams are made continuous over a pier by a joint cast with the deck, and the joint is designed for the hogging moment a continuous beam has there. Thirty years later it is sagging, by more than the moment that cracks its underside, because the beams were still cambering upward when they were joined. Whether that happens is decided by two dates — when the beams were cast and when the joint was — and the deck's shrinkage, which pulls the other way, is not enough to stop it.
The base that is rigid until the bed lets go
A column base drawn as fixed is a spring about a tenth as stiff as the rule for "rigid" requires, and most of its softness is the holding-down bolts stretching. Shortening the bolts helps less than it seems: even 60 mm of free length leaves the base below two thirds of the rigid boundary. Preloading them works completely — the base becomes half as stiff again as the boundary asks — but only while the grout under the plate stays in compression. The preload is spent at a definite moment, the same moment the column's own weight would buy for free, and the shorter the bolt the faster creep of the grout takes the preload away.
The backprop that takes load nobody gave it
The arithmetic of propped construction says a backprop put in snug carries nothing until the next floor is cast, and then only a share of it. Count the props as the springs they are and that barely changes, because a steel prop is about seven times stiffer than the slab per square metre. Two other things change it. The young slab just struck creeps onto its backprops within a day and hands a quarter of a slab's weight down to the one below, which then carries 1.71 times its weight rather than 1.5. And a millimetre of slack at installation — about half the slab's own deflection — gives the struck slab back everything a backprop was meant to save.
The backprop jacked tight lands on the floor below
A backprop put in snug shares only the load that arrives after it, and creep then pushes the young slab above onto it anyway. Jack it to a preload instead and the young slab is lifted at once — but the preload survives the week, so the lift lands on the slab below the moment the next level is struck, and about half of it is load creep would have moved within the week regardless. The best preload balances the week-old slab against the fortnight-old one, and with creep it is small: a fourteenth of a slab's weight, about six hundred newtons a prop. Anything over a fifth leaves the frame worse than snug. What a small preload does buy completely is immunity to slack.
The camber that lowers the hook
A camber is built into a girder so that it ends up level in the finished structure, and nothing about it matters until then — except on the day it is lifted. A cambered girder hanging from its ends is a shallow arch, its centre of gravity two-thirds of the camber above the line through its lifting points, and it rolls about that line as though its hook were that much lower. On a long precast girder already close to its lifting limit, a hundred millimetres of camber takes the factor of safety against roll from 2.3 to 1.4. The camber grows while the girder waits in the yard, so the same girder becomes harder to lift every week it is stored. Pick it a fifth of its length in from each end and the camber drops out of the problem altogether.
The jacks the arch forgets
Jack a fixed concrete arch's abutments apart before the crown is closed, by exactly the gap its thrust and its footings open on the day, and the springings start with no moment at all. A century later they carry 173 kN·m — half as much again as the 112 the jacks were set to remove. The thrust's own moment never relaxes; the jacks' correction does, as the rib creeps; and shrinkage and the ground's consolidation arrive after the jacks have gone. No single setting cancels movements that run on different clocks.
The arm connected late
An outrigger is often left unconnected until a concrete building is finished, so that the columns and the core can shorten by their different amounts without it. Most of their difference has not happened yet. Three-quarters of fifty years' differential shortening arrives after the frame tops out, and an arm connected then ends up carrying 3.5 MN of it — 60 per cent of what the design wind puts into the same arm, permanently, and in the same direction on both sides of the core. The connection date is the largest load the arm has, and a stiffer arm collects it faster than it collects the wind.
The preload that cannot be taken back
A backprop jacked tight under a young slab relieves it and loads the slab below by the same amount at the same instant. The obvious repair is to slacken the backprop once the young slab is past its worst, so that the preload never reaches the slab below. It cannot work. Slackened to snug, a backprop lets go of everything it carries, not only its preload, and the young slab's load jumps from 1.19 to 2.00 times its weight. Let down by the preload alone, it gives back a load the slab below has already carried at its worst.
The day taken off the floor cycle
A frame cast a floor a week loads its slabs with the same multiples of their weight whether the cycle is seven days or four. What a shorter cycle changes is how strong each slab is when its load arrives, and it changes that unequally, costing the youngest slab more than the one below it. That is why a faster cycle makes a jacked backprop more useful rather than less, and why a frame that wants four days needs both a second level of backprops and a preload to be as safe as a week on one.
The joint cast over the pier
Two pretensioned beams made continuous over a pier by a joint cast with the slab have ends that are still turning when the joint goes in, and the joint stops them. What it is then asked to carry depends on the day it is cast. At four weeks the beams' creep is still lifting their ends and the joint is sagged to half as much again as its cracking moment. At a year the beams have nearly stopped and the slab's shrinkage hogs the joint by as much the other way. Cast at about sixteen weeks, it is asked for almost nothing.
The arm that slips on purpose
An outrigger connected to a concrete building at topping out goes on collecting the columns' and the core's differential shortening for fifty years. The obvious cure is a joint that lets the arm move under the slow force and holds under the fast one. A friction joint cannot do it — once creep has brought it to its slip load it has nothing left on one side of the core, and a joint strong enough to hold the wind is never reached by the creep at all. A viscous damper can, because its force depends on how fast it is pushed rather than how far.
The beam stressed one bay at a time
A long continuous beam is rarely stressed in one pull. It is cast and stressed a bay at a time, each new length of tendon coupled to the last, and at every stage the structure is a different beam. The secondary moments the finished beam carries are the sum of what each stage did to the beam that existed then — about half of what the one-stage analysis gives — and creep spends the following years taking most of the other half back.
The floor that is level on one date
Each floor of a tall concrete building is set high by the amount its columns are predicted to drop against the core, so that it arrives level. Counted in time, the drop does not peak at mid-height and stop at the roof: the worst floor of a forty-storey building is level 31, the roof moves 24 mm, and half the movement is still to come when the floors are fitted out. Set high by all of the prediction, a floor is level on one date thirty years away and 16 mm high at handover. With the creep known to ±30 per cent, setting it high by about four fifths of the prediction makes the worst floor's error 11 mm instead of 16. And none of it changes what the partitions see.
The beam built towards its own middle
A continuous prestressed beam built one bay at a time from one end keeps about half the secondary moment a beam stressed at once would carry, and most of it at the end where it was finished. Built from both ends towards a closure bay, it is symmetric, and the closure's supports keep only a little more than the rest: 172 kN·m against 161. Built from the middle outwards, the first interior supports — the ones the load hogs hardest — keep 215, 63 per cent of the at-once value, for any length of beam. The order of construction is a design variable. Creep then takes back most of the choice.
The arm that is reset by hand
An outrigger connected to a concrete building at topping out collects the core's and the columns' differential creep for fifty years, 3.48 MN in each arm against a design wind of 5.80. A damper lets the creep through and stops the wind, but it is a machine. The older answer is a joint closed with shims and opened every few years to take the creep out. Three visits, at one, three and ten years, hold the arm below 1.40 MN, and spaced like the creep they do it with roughly equal thicknesses of shim each time. Evenly spaced, the same three visits hold 2.48. And a visit that is missed costs exactly the creep it was there to remove.
The joint poured twice over the pier
A continuity joint over a pier can be cast in two stages — the diaphragm and the beams' bottom connection first, the slab weeks later — in the hope that the early pour catches the beams' creep and the late one leaves the slab's shrinkage little to do. It does neither. From the slab's day on the composite section holds exactly what a single pour on that day would have held, and the first stage adds only its own small account, of either sign. It trims a year-old slab's hog by a fifth, and it asks a joint with half the cracking moment to carry the beams through the months between.
The arch that waits with its hinges open
A concrete arch fixed on the day it is struck has to restrain every millimetre its rib creeps and shrinks and its ground settles for the rest of its life, and jacking it again a year later cannot make it forget the year before. Struck as a three-hinged arch and left that way, it takes the fastest part of every movement for nothing, because a determinate arch has no moment to spend on a change of length. Closed at a year it ends the century with half the springing moment of the arch fixed at striking, and a third less than the arch jacked again on the same date. The price is a crown that has dropped 78 mm while it waited, and a rib that is no longer the shape of its own thrust.
The jack that creep carries past the mark
A continuous beam built from both ends towards a closure bay keeps less secondary moment at its supports than the same beam stressed all at once, and creep gives back three-quarters of the difference over the years. Bridge builders do not always wait: before the closure is cast, the supports can be lowered on jacks so that the beam starts with the moments it would have had. Jacked by the whole difference, it does start there — and creep, which goes on returning the staged deficit while it relaxes the jacked correction, carries it past them, by a seventh of what was jacked. Jacked by 0.89 of the difference, it starts a ninth short and ends a ninth over. And it takes a jack at every interior support: with fewer, the moment goes to the wrong places.
The column that creeps under the arch
A shallow arch propped at its crown by a stiff enough column stops snapping — the sideways branch it would have fallen down turns upwards. If the column is concrete, it creeps under the force it holds, and after a decade it holds that force as a spring a third as stiff, well on the side where the arch snaps. But a load that arrives in seconds does not meet the crept column; it meets the column's instantaneous stiffness, from a rest length that creep has merely moved down, and the arch's branch still rises. Creep reaches only the load that stays on, and there it can take back only the column's own share — 13 per cent of it. A concrete rib is another matter: it creeps itself, and a lasting load at half its critical load snaps it before its creep coefficient reaches one.
The survey that arrives after the floors
A tall building's lower storeys start shortening months before its upper floors are cast, so a survey every ten floors should tell the creep the building really has and let the floors still to come be set for it. It does tell it, to a millimetre's precision, after the twenty-fifth floor. By then most of the floors whose height it was meant to correct are already set, and the floor that ends furthest from level is the one no survey can help.
The younger span catches up
Close one span of a stressed ribbon a month before its neighbour and the older band has already shortened when the younger arrives, by a difference that ought to keep working on the pier between them. It does not. The younger span shortens faster and closes most of the gap within a year, and what looked like a grievance that never stops growing is at its largest on the day it begins. What it leaves is small, and it stays, because the part of a ribbon that holds it is a sag, and a sag does not creep.
The bars that take the column over
Steel does not creep and concrete does, so a reinforced column's concrete slowly hands its load to the bars, with nothing on the outside having changed. Bars carrying a seventh of the load on the first day carry more than a third after fifty years, the column shortens a quarter less than plain concrete would, and the column-to-core difference that a tower has to be built around can be closed or even reversed by the steel alone. And if the load is ever taken away, the bars that took it over pull the concrete into tension and crack it, with nothing on the column at all.
The hanger that loses force and keeps its stiffness
A concrete column propping a shallow arch's crown creeps, and the stiffness it offers a lasting load falls with it, until the arch can snap under a load it carried on the day. A steel strand hanging the crown from above does not creep. It relaxes, losing force at constant length, and its anchorage may slip. Both turn out to cost the arch almost nothing — and the slip, which is a gap rather than a spring, costs nothing at all until it is as large as the crown's whole deflection at buckling, when it costs everything.
The column that cannot be unloaded slowly enough
A heavily reinforced concrete column that has carried its load for ten years has handed much of it to its bars, and when the load is taken away the bars, still squeezed, pull the concrete into tension. Taking the load off slowly lets the concrete creep under that tension as it arises, so it seems a slow enough programme could keep any column uncracked. It cannot. Slowness takes a fifth off the peak, and decades later every column arrives at the same tension however it was unloaded — past the concrete's strength above 3.3 per cent of steel.
The arm that calls for its own visit
An outrigger connected to a concrete building collects the core's and the columns' differential creep, and re-shimming its joint every few years lets that force go. Dates on a drawing are a guess at how fast the building will creep. A load cell in the joint replaces the guess: re-shim whenever it reads 1.40 MN and three visits, at one, four and twenty-three years, hold the arm there whatever the building does. A building that creeps 60 per cent more than predicted needs a fourth visit; the dated schedule lets it reach 2.30 MN. Holding a tenth of the wind takes eight visits, three in the first thirteen months, and a contractor who can come within weeks.
The joint born holding a moment
A continuity joint over a pier ends its first thirty years sagged or hogged by the beams' creep and the slab's shrinkage, by an amount the date of the pour decides. Jacking the beams' pier ends before the joint is cast lets it be born holding the opposite moment, so that the two cancel at thirty years. The arithmetic works for any slab date. The jack does not, for two reasons: the beams' creep relaxes a jacked moment like every other restraint, so the jack must be two to three times the moment it cancels and is larger than the joint's cracking moment on either side; and a jack sized for one humidity is wrong by as much as the moment it removed at another. Held to what the joint can take uncracked, it cancels about half.