The shear stress between a reinforcing bar and the concrete around it, which is what transfers force between them. It is carried by the ribs bearing on the concrete rather than by adhesion, so its limit is usually a splitting of the cover, and it acts over a length rather than at a point.

Named by 15 essays across 5 fields — each of them below, with the objects they name alongside it.

The beam is stiffer than its cracked section and softer than its gross one. Moment against mid-span deflection for a 300 × 550 mm beam spanning 8.0 m, with the two bounds it lies between. The uncracked line is what the gross transformed section gives; the cracked line is what the section at a crack gives; and the curve between them is the member, because between the cracks the concrete is still carrying tension and the average curvature is not either section's. At the service load the deflection is 23.2 mm — span over 345 — against 8.3 uncracked and 25.2 fully cracked, a factor of 3.03 between the bounds. The interpolation ζ = 1 − β(M_cr/M)² sits it 88 per cent of the way across, and β falls from one to a half under sustained or repeated load because the bond that does the dragging deteriorates.

Stiffer than its cracked section says

At a crack the concrete below the neutral axis has gone and the steel carries the tension alone. Between the cracks it has not gone — bond drags it back into tension, the steel strain drops, and the curvature averaged over a length of beam is neither section's.

deflection · Tension stiffening
The bond stress is crowded against the loaded end. A 20 mm bar embedded 806 mm, with the force in it and the bond stress on it plotted along the embedment. Uniform bond — the assumption behind every development length ever tabulated — is a flat stress and a straight line of force. An elastic bond of the same peak strength is neither: the slip is largest where the bar is pulled and dies away over 1/α = 471 mm, so the far end of the bar is doing almost nothing. At the design rule's length of 40 diameters the elastic bond is 55 per cent used. The uniform answer is what the bond looks like after it has yielded along the whole length, which is a statement about ductility rather than about strength.

The force that arrives along a length

A bolt takes its force at a hole and a weld along a line. A reinforcing bar has no such place — it is a smooth cylinder in a hole of its own shape, and the only thing stopping it sliding out is a stress smeared over its surface. So the force in it is not a number, it is a function of position.

internal-forces · Bond
The end bolts do the work and the middle ones very nearly nothing. A lap of 8 bolts at 70 mm pitch transferring 800 kN between two plates, with the force each bolt actually carries drawn above it and the flat line a division by the bolt count would have given drawn behind. The end bolts carry 1.09 of their nominal share and the middle ones 0.94. The reason is not in the bolts: at the leading end the first plate is carrying everything and the second nothing, so the two strain at different rates and the slip between them is largest there. In the middle they strain alike, there is almost no slip, and a bolt with no slip across it transfers almost no force. The mean over the worst is 0.918, and the end bolt has to slip 1.36 mm before the rest catch up.

The bolts that do not share

Every bolted connection in this collection has divided a force by a number of bolts. That is right for a short joint and wrong for a long one, and the reason has nothing to do with the bolts — it is that the plates they join are elastic, and stretch by different amounts at different points along the lap.

connections · Long joint
Cover enters twice, and the strength of the concrete enters once. How long a 20 mm bar has before the cover over it splits, against the cover, split into the two halves it is always split into. Initiation is the time for the chloride front to reach the bar, which goes as the square of the cover — Fick's law and nothing else — and it is 9.1 years at 35 mm and 36.2 at 70. Propagation is the time from there to a split cover, which is short: 0.9 years, because the cover cracks at a section loss of 0.21% and no strength check in this collection would notice a loss that small. The pressure the cover can take grows with the cover too, so cover appears in both terms and the concrete's own tensile strength appears in one of them, linearly. That asymmetry is why every durability clause in every code is about cover and crack width, and hardly at all about strength.

The load that comes from inside

Every action in this collection has been applied from outside — a weight, a pressure, a movement, a temperature. Corrosion is not applied at all, and the reason it belongs to statics rather than to durability is that what does the damage is a load: rust occupies three times the volume of the steel it came from, and the only place to make room is by pushing the cover apart.

materials · Corrosion
The neutral axis is wherever the first moment vanishes. A 300 by 600 section with 1800 mm² of steel at a depth of 540, carrying 250 kNm after the tension side has cracked. The neutral axis is no longer at mid-depth: it has risen to 234.5 mm from the top, which is where the first moment of the compression zone plus the transformed steel vanishes. The compression is 15.4 N/mm² at the top fibre and the steel carries 301 N/mm²; the resulting couple is 541 kN on a lever arm of 462 mm, which multiplies back to the 250 kNm applied. The uncracked section would have had 6673×10⁶ mm⁴ against the cracked 3809×10⁶ — a loss of 43% of the stiffness.

Where the steel is, not how much of it

A section in bending resists a moment with a couple, and a couple is a force times a distance. The force is bought — it is an area of steel at a stress. The distance is free, decided by where the bars were put, and it is the variable almost nobody optimises because it does not appear on an order.

sections · Lever arm
A strength with no mechanism in it, made of four. The shear a member carries with no links in it, split into the mechanisms that carry it, against the member's effective depth on a logarithmic axis. The three bands are calibrated to Taylor's measured shares at one 300 mm × 500 mm member and are then evaluated everywhere else, so the shape of the total is a prediction. Aggregate interlock is the band that dies: it depends on how tightly the crack faces are held together, crack width grows with member depth, and it falls from 62% of a shallow member's strength to 22% of a deep one's. That decay is the whole of the size effect, and the dashed line is the design code's fitted k = 1 + √(200/d), which knows nothing about interlock and falls by a factor of 1.52 where the model falls by 2.05 over the same twentyfold range. Dowel action is why the expression contains the flexural reinforcement ratio, which nothing in a truss analogy would predict.

The strength with no mechanism in it

A concrete member with no links in it carries shear, and the expression that says how much is three variables raised to fitted powers with a size term in front. There is no free body anywhere in it. What it is fitting is a competition between four things that carry shear across a crack, and only one of them explains why a deeper member is worse at it.

internal-forces · Concrete shear
The dimension the capacity rides on is not a drawn dimension. Moment capacity of a 225 mm slab against the cover to the reinforcement. The line is very nearly straight, because capacity is A_s·f_yd·z and z is about 0.9d — so the capacity is proportional to a dimension that is not on the drawing. What is on the drawing is the overall depth, and the effective depth is what the cover, the link and half a bar diameter leave of it: 225 − 30 − 0 − 8 = 187 mm here. Every one of those three is a site tolerance rather than a design decision. Ten millimetres of bar position is 5.7% of this slab's capacity and 1.8% of a 600 mm beam's — the same workmanship costs 3.0 times as much in the shallow member, and the shallow member is the one whose steel is walked on before the pour.

The dimension nobody can measure

Every flexural capacity in reinforced concrete is proportional to the effective depth, and the effective depth is not on the drawing. It is what is left of the thickness after a cover, a link and half a bar diameter have been taken off it — and each of those is a site tolerance. In a slab, ten millimetres of workmanship is six per cent of the strength.

sections · Effective depth
The same steel, and a crack three times as wide. Calculated crack width against bar diameter, with the area of steel held at 1340 mm² per metre throughout — so the spacing changes with the square of the diameter and the amount of reinforcement does not change at all. The width runs from 0.173 mm at 8 mm bars to 0.372 at 25, a factor of 2.15 for identical steel. The reason is in the crack spacing: after a crack forms the bar has to re-anchor the concrete's tensile force before the next one can, and the length that takes is proportional to the bar's diameter. Of the 337 mm spacing drawn, 35% is the cover term and 65% is the bar term — and the cover term is the one that puts crack control and durability in opposition, because cover protects the bar and widens the crack that reaches it.

The same steel, and a wider crack

A crack's width is the distance between cracks times the strain the steel carries over that distance. Neither of those is decided by how much reinforcement there is. The spacing is a bond length, so it goes as the bar diameter; the strain is set by the stress in the steel. Two arrangements of identical steel can differ by a factor of two in crack width, and the one that wins is the one with more, smaller bars.

sections · Crack width
The strength that does not keep pace. Concrete's mean tensile strength against its characteristic compressive strength, with the ratio of the two on the same axis, scaled. The tensile strength goes as f_ck^⅔, so it rises from 1.57 to 5.04 N/mm² over a sixfold rise in the compressive strength, and the ratio between them falls from 11.1% at C20 to 6.0% at C80 — a factor of 1.83. Nothing in a bending or a column calculation ever uses the lower curve, and everything that decides a transition does: when the section cracks, how much minimum steel it needs, how far a bar has to be lapped, what a member without links carries. So a stronger concrete needs more minimum reinforcement, longer laps and a bigger crack-control check, in a member whose ultimate capacity has barely moved. Its real scale is a length: E·G_F/f_ct² is 299 mm here, which is the size at which a member stops behaving plastically and starts behaving like a fracture problem.

The strength that is never used

Concrete's tensile strength appears in no bending calculation, no column calculation and no shear calculation with links in it. The whole design philosophy is that it cracks and the steel takes over. And it decides where nearly every transition in the subject sits — when a section cracks, how much minimum steel it needs, how far a bar has to be lapped, what a member without links can carry, and how wide a crack opens.

materials · Tensile strength
Restraint is a fraction, and the length decides how far up it reaches. A 20 m wall 3.0 m high cast against a base that has already hardened — a length-to-height ratio of 6.67. The base holds the bottom of the wall at R = 0.50 and the top of it at 0.304, decaying as 0.609 to the power of the height in wall heights. The free contraction is 380 microstrain, of which 84 per cent is the wall cooling from its own hydration peak and the rest is drying; the concrete's own strain capacity is 50. Everything to the right of the dashed line cracks, which here is the bottom 3.00 m of it. Nothing has been loaded.

The steel decides how many, not how much

A wall cast on a base that has already set cools, tries to contract, and is not allowed to. What follows is not a stress problem with a strength on the other side of it. The movement is going to happen; the only question the reinforcement gets to answer is how many pieces it is divided into.

internal-forces · Restraint cracking
Steel and concrete happen to match, and nothing else on the list does. The mismatch strain a 40 degree change produces in seven pairs of materials that engineering bonds together, which is the difference of their coefficients of expansion times the temperature. Steel against concrete is 80 microstrain — 17 per cent of the larger coefficient, and by far the smallest on the list. It puts 0.223 N/mm² of tension into the concrete, 7.7 per cent of its tensile strength and 1.9 per cent of the 12 N/mm² a fully restrained member would have carried. Reinforced concrete works because of a coincidence in the third significant figure of two numbers nobody chose, and the same bar in aluminium would put in two and a third times as much.

The coincidence reinforced concrete stands on

Steel expands at twelve microstrain per degree and concrete at ten. Nobody chose either number, they are not equal, and the seventeen per cent between them is the smallest mismatch of any pair of materials engineering bonds together — which is the reason the most-used structural material on earth does not tear itself apart every summer.

materials · Thermal compatibility
A truss drawn inside a solid, and solved as one. A deep member 5000 mm between bearings and 2500 mm deep, carrying 2400 kN at mid-span. The model is two struts and one tie, on a lever arm of 2000 mm, and it is solved by the truss solver rather than by a formula: the tie comes back at 1500 kN and each strut at 1921 kN, at 38.7° to the horizontal. Spread over a strut width of 1031 mm the compression is 3.7 N/mm² against a limit of 18.1 for concrete cracked across its own strut, and the tie needs 3448 mm² of steel. A beam calculation on the same member would have asked the tie for 1404 kN, which is 7% less than the model does.

The node is the part that is checked

A strut-and-tie model is safe if every part of it can carry what the model asks. The struts are wide and lightly stressed, the ties are steel and easy, and the whole of the difficulty collects at the points where they meet — in a volume of concrete a few hundred millimetres across that no drawing shows.

internal-forces · Strut-and-tie
More steel across the crack, until the roughness runs out. Shear resistance of the interface against the reinforcement crossing it. The steel clamps rather than carries, so the resistance is the clamping stress times the interlock coefficient and rises in a straight line — until the asperities crush at 5.50 N/mm², which happens at a reinforcement ratio of 0.79%. Past that the line is flat and every further bar is decoration. The dashed line is what the clamping alone would give if the concrete were unbreakable.

Two models of one bracket

A corbel can be designed as a plane that has to be clamped or as a truss that has to be drawn, and the two are not approximations of each other. They describe different failures, they ask for steel in different places, and the honest answer is that both are checked because neither bounds the other.

internal-forces · Shear friction
Two restraints, and only one of them cares how much was imposed. Crack width against the restrained strain, for the same 20 m wall restrained two ways. Edge restraint — a wall cast on a base — gives a width proportional to the strain, because the concrete has to accommodate the movement and the cracks are where it does. End restraint — a bay cast between two that have hardened — gives 0.32 mm at every strain on the axis, because the crack opens only until the steel can push the cracking force back into the concrete, and that force is a property of the section. At the 304 microstrain this wall is asked for, the two are 0.17 and 0.32 mm, and the movement is divided into 35 cracks and 19.

The bay that is cast last

A wall cast on a base cracks in a way the steel controls: more movement gives wider cracks, and reinforcement decides how many. A bay cast between two walls that have already hardened cracks in a way that has nothing to do with how much movement there was — and the threshold that separates a controlled crack from a single wide one is a quantity of steel rather than a limit on anything.

internal-forces · Restraint cracking
The force each section may carry rises from the end, and the strands must climb under it. The prestress each section of a pretensioned beam 300 × 700 mm spanning 12 m, with eight strands of 125 kN at 220 mm below its centroid may carry at transfer without its top fibre passing −2.50 N/mm² or its bottom 18 (thick), against the distance from the end: 739 kN at 0.5 m, 1,101 at 2 m, 1,507 at mid-span, where the self-weight moment is largest. All eight strands bonded from the end give 1,000 kN once their transmission length is past (dashed), which the beam can carry only near mid-span. Debonded — six bonded from the end, one debonded for 0.50 m, one debonded for 1.00 m — their force (solid) climbs in steps that stay under the line everywhere.

The strands that are sleeved at the ends

A post-tensioned tendon can be draped up towards the centroid near the supports, where the self-weight moment that made its eccentricity safe has gone. A pretensioned strand cannot: it runs straight between the abutments of the casting bed. Choose eight strands at 220 mm below the centroid of a 12 m beam and mid-span passes every limit at transfer, while a metre in from each end the top fibre cracks. The cure is to stop some strands gripping the concrete near the ends, and how many is a trade: every strand saved at mid-span by lowering the strands is a strand to sleeve at the ends.

sections · Prestress limits

Named alongside it

The objects these essays reach for when they reach for this one.

Crack widthReinforcementTensile strengthAnchorageEquilibriumCoverCracked sectionMinimum reinforcementServiceabilityStrut-and-tieCharacteristic strengthCrack spacing

All concepts