Crack width — where it appears
Named by 12 essays across 5 fields — each of them below, with the objects they name alongside it.
The load that comes from inside
Every action in this collection has been applied from outside — a weight, a pressure, a movement, a temperature. Corrosion is not applied at all, and the reason it belongs to statics rather than to durability is that what does the damage is a load: rust occupies three times the volume of the steel it came from, and the only place to make room is by pushing the cover apart.
The strength with no mechanism in it
A concrete member with no links in it carries shear, and the expression that says how much is three variables raised to fitted powers with a size term in front. There is no free body anywhere in it. What it is fitting is a competition between four things that carry shear across a crack, and only one of them explains why a deeper member is worse at it.
The steel the concrete asks for
Every other bar in a concrete member is there because of an action. This one is there because of the member itself — enough steel that the cracked section can carry more than the moment that cracked it, so that the first crack is not also the failure. The requirement contains no load, and both of its consequences run the wrong way round.
The same steel, and a wider crack
A crack's width is the distance between cracks times the strain the steel carries over that distance. Neither of those is decided by how much reinforcement there is. The spacing is a bond length, so it goes as the bar diameter; the strain is set by the stress in the steel. Two arrangements of identical steel can differ by a factor of two in crack width, and the one that wins is the one with more, smaller bars.
The strength that is never used
Concrete's tensile strength appears in no bending calculation, no column calculation and no shear calculation with links in it. The whole design philosophy is that it cracks and the steel takes over. And it decides where nearly every transition in the subject sits — when a section cracks, how much minimum steel it needs, how far a bar has to be lapped, what a member without links can carry, and how wide a crack opens.
The steel decides how many, not how much
A wall cast on a base that has already set cools, tries to contract, and is not allowed to. What follows is not a stress problem with a strength on the other side of it. The movement is going to happen; the only question the reinforcement gets to answer is how many pieces it is divided into.
Two models of one bracket
A corbel can be designed as a plane that has to be clamped or as a truss that has to be drawn, and the two are not approximations of each other. They describe different failures, they ask for steel in different places, and the honest answer is that both are checked because neither bounds the other.
The torque that should not be shed
A compatibility torque can be let go, because the load has somewhere else to go. What the rule does not say is what it costs the somewhere else — a twenty per cent rise in a floor beam's midspan moment, a crack width nobody limits, and a rotation the spandrel has to actually deliver. There is a size of torque past which shedding is the wrong answer, and no code states it.
The bay that is cast last
A wall cast on a base cracks in a way the steel controls: more movement gives wider cracks, and reinforcement decides how many. A bay cast between two walls that have already hardened cracks in a way that has nothing to do with how much movement there was — and the threshold that separates a controlled crack from a single wide one is a quantity of steel rather than a limit on anything.
The crack is a strain, not a slope
Angular distortion is what every table of settlement limits is written in, and it is a proxy. What cracks a building is a tensile strain in it, and reading the building as a deep beam says which of two mechanisms supplies it, why hogging is exactly twice as damaging as sagging, and why a horizontal stretch of a few millimetres takes half the capacity away before the settlement starts.
The basement that leaks before it floats
A water table that rises after a basement is finished is a load that grows through the building's life, and the building's flotation check is the last thing it troubles. A metre of rise adds a sixth to the uplift on the whole building but over a quarter to the net load on the slab, which carries the water less its own weight. The slab's cracks, which a watertight basement is designed to, are the first thing to run out of room — and the limit for the cracks that pass right through it tightens as the water rises.
The building held down by its pump
A basement whose water table has risen above its design level is often given back its design head by a pump under the slab, and from then on it is safe while the pump runs. When the pump stops the water comes back on the ground's own clock, and the checks the pump was protecting are lost in an order the building's weight decides. Under eight storeys only the slab's cracks were ever at risk; under five, the building's flotation check goes first, four and three-quarter hours after the pump stops, and the slab's strength is never in question at all. A structure that was safe by its weight has become one that is safe by a machine, and the machine's reliability is now one of its loads.
Named alongside it
The objects these essays reach for when they reach for this one.
BondServiceabilityTensile strengthMinimum reinforcementShrinkageAnchorageCharacteristic strengthCrack spacingReinforcementReinforcement ratioSize effectAggregate interlock