Concept

Minimum reinforcement — where it appears

The steel a concrete section needs so that its cracked capacity exceeds the moment that cracked it. It is sized by the concrete's own tensile strength and by no applied load. Below it the first crack is the failure, with no deflection beforehand to give warning.

Named by 5 essays across 3 fields — each of them below, with the objects they name alongside it.

The steel that is sized by the concrete. Ultimate moment of a 1000 × 400 mm section against the area of tension steel in it, with the moment that cracks the section drawn across. The cracking moment is 77.2 kNm and contains no steel at all — it is f_ctm times the gross section modulus, 2.90 N/mm² times bh²/6 — so it is a horizontal line, and every section to the left of where the two meet is one whose first crack is its failure. The crossing is at 507 mm², and rearranging the two expressions gives 0.245·(f_ctm/f_yk)·bd against the 0.26 the codes print — the constant is a section modulus divided by a lever arm and not a fitted number. The rule as printed asks for 538 mm² here, which is 6% more than the derivation needs, and that margin is the whole of the safety in a check whose failure mode is sudden.

The steel the concrete asks for

Every other bar in a concrete member is there because of an action. This one is there because of the member itself — enough steel that the cracked section can carry more than the moment that cracked it, so that the first crack is not also the failure. The requirement contains no load, and both of its consequences run the wrong way round.

sections · Minimum reinforcement
The same steel, and a crack three times as wide. Calculated crack width against bar diameter, with the area of steel held at 1340 mm² per metre throughout — so the spacing changes with the square of the diameter and the amount of reinforcement does not change at all. The width runs from 0.173 mm at 8 mm bars to 0.372 at 25, a factor of 2.15 for identical steel. The reason is in the crack spacing: after a crack forms the bar has to re-anchor the concrete's tensile force before the next one can, and the length that takes is proportional to the bar's diameter. Of the 337 mm spacing drawn, 35% is the cover term and 65% is the bar term — and the cover term is the one that puts crack control and durability in opposition, because cover protects the bar and widens the crack that reaches it.

The same steel, and a wider crack

A crack's width is the distance between cracks times the strain the steel carries over that distance. Neither of those is decided by how much reinforcement there is. The spacing is a bond length, so it goes as the bar diameter; the strain is set by the stress in the steel. Two arrangements of identical steel can differ by a factor of two in crack width, and the one that wins is the one with more, smaller bars.

sections · Crack width
The strength that does not keep pace. Concrete's mean tensile strength against its characteristic compressive strength, with the ratio of the two on the same axis, scaled. The tensile strength goes as f_ck^⅔, so it rises from 1.57 to 5.04 N/mm² over a sixfold rise in the compressive strength, and the ratio between them falls from 11.1% at C20 to 6.0% at C80 — a factor of 1.83. Nothing in a bending or a column calculation ever uses the lower curve, and everything that decides a transition does: when the section cracks, how much minimum steel it needs, how far a bar has to be lapped, what a member without links carries. So a stronger concrete needs more minimum reinforcement, longer laps and a bigger crack-control check, in a member whose ultimate capacity has barely moved. Its real scale is a length: E·G_F/f_ct² is 299 mm here, which is the size at which a member stops behaving plastically and starts behaving like a fracture problem.

The strength that is never used

Concrete's tensile strength appears in no bending calculation, no column calculation and no shear calculation with links in it. The whole design philosophy is that it cracks and the steel takes over. And it decides where nearly every transition in the subject sits — when a section cracks, how much minimum steel it needs, how far a bar has to be lapped, what a member without links can carry, and how wide a crack opens.

materials · Tensile strength
Restraint is a fraction, and the length decides how far up it reaches. A 20 m wall 3.0 m high cast against a base that has already hardened — a length-to-height ratio of 6.67. The base holds the bottom of the wall at R = 0.50 and the top of it at 0.304, decaying as 0.609 to the power of the height in wall heights. The free contraction is 380 microstrain, of which 84 per cent is the wall cooling from its own hydration peak and the rest is drying; the concrete's own strain capacity is 50. Everything to the right of the dashed line cracks, which here is the bottom 3.00 m of it. Nothing has been loaded.

The steel decides how many, not how much

A wall cast on a base that has already set cools, tries to contract, and is not allowed to. What follows is not a stress problem with a strength on the other side of it. The movement is going to happen; the only question the reinforcement gets to answer is how many pieces it is divided into.

internal-forces · Restraint cracking
Two restraints, and only one of them cares how much was imposed. Crack width against the restrained strain, for the same 20 m wall restrained two ways. Edge restraint — a wall cast on a base — gives a width proportional to the strain, because the concrete has to accommodate the movement and the cracks are where it does. End restraint — a bay cast between two that have hardened — gives 0.32 mm at every strain on the axis, because the crack opens only until the steel can push the cracking force back into the concrete, and that force is a property of the section. At the 304 microstrain this wall is asked for, the two are 0.17 and 0.32 mm, and the movement is divided into 35 cracks and 19.

The bay that is cast last

A wall cast on a base cracks in a way the steel controls: more movement gives wider cracks, and reinforcement decides how many. A bay cast between two walls that have already hardened cracks in a way that has nothing to do with how much movement there was — and the threshold that separates a controlled crack from a single wide one is a quantity of steel rather than a limit on anything.

internal-forces · Restraint cracking

Named alongside it

The objects these essays reach for when they reach for this one.

Crack widthBondServiceabilityShrinkageTensile strengthCharacteristic strengthCrack spacingBrittle failureCracking momentReinforcement ratioSize effectAnchorage

All concepts