Thermal movement — where it appears
Named by 14 essays across 7 fields — each of them below, with the objects they name alongside it.
The movement nobody applied
A temperature change is the only load in this collection that a structure can decline. Let it move and it produces a movement with no stress; hold it and it produces a stress with no movement — and that stress contains no length, no area and no second moment, so a bracket and a bridge girder carry exactly the same one.
The stress nobody restrained
A bridge deck lying loose on its bearings, with nothing holding it anywhere, develops four newtons per square millimetre when the sun comes out. The stress is not caused by restraint. It is caused by plane sections, and it is invisible to every equilibrium check that could be made on the member.
Where the structure is allowed to move
One drawing decides how big every movement joint on a bridge is and where every horizontal force goes, it takes an afternoon, and it appears on no calculation sheet. Move the fixed point from an abutment to the middle pier and the largest joint halves and the horizontal force on that support drops from the whole of the friction to none of it.
The gap nobody computed
A movement joint is sized by adding up everything the structure will do to it, and the deflection calculation — the only term anybody computes carefully — is usually the smallest one in the list. The largest is a construction tolerance, which is not a structural quantity at all, and the sum of the extremes is nearly twice what treating them as independent would ask for.
The roller that is not a roller
A sliding bearing is drawn as a roller and detailed as a sheet of PTFE, and it delivers a horizontal force of a few per cent of whatever it is carrying. The coefficient everybody quotes is the one at full design pressure, and PTFE's coefficient rises as the pressure falls — so the bearing is at its freest exactly where nobody checks it.
Built to the wrong length
A redundant structure's members do not have independent lengths. Choose all but one and geometry decides the last, so a member made a different length has to be pulled or pushed into place — and the force required stays in the structure for as long as the structure does. Nothing has been applied to it, there is no load case and no factor, and the members are carrying real force.
The steel decides how many, not how much
A wall cast on a base that has already set cools, tries to contract, and is not allowed to. What follows is not a stress problem with a strength on the other side of it. The movement is going to happen; the only question the reinforcement gets to answer is how many pieces it is divided into.
The coincidence reinforced concrete stands on
Steel expands at twelve microstrain per degree and concrete at ten. Nobody chose either number, they are not equal, and the seventeen per cent between them is the smallest mismatch of any pair of materials engineering bonds together — which is the reason the most-used structural material on earth does not tear itself apart every summer.
The summer that is worse than the last
An expansion joint is a hole in a deck that leaks salt water onto the bearings underneath it. Remove it and the thermal movement does not go away — it goes into the soil behind the abutment, twice a day for a hundred and twenty years, and granular soil under cyclic strain gets denser.
The pier that moves in jumps
A sliding bearing whose static friction is larger than its kinetic friction does not release a slow thermal movement as a drift. It grips, gives and grips again, and each time the force in the pier swings by twice the difference between the two coefficients — whatever the pier is made of.
The order the loads arrived in
Statics allows a contact with friction a whole range of forces and has no way to choose between them. A real structure does choose, and what it chooses by is the order in which things happened to it — so the force in a pier under a sliding bearing is a record of its history, not a function of its loads.
The pier that carries only the difference
A stressed ribbon continued over a pier pulls on it from both sides, and under its own weight the two pulls cancel. Load one span and they do not: the pier is asked for the difference, nearly ten meganewtons for a crowd on one of two hundred-metre spans. Whether it gives it depends on its stiffness against a number the ribbon supplies itself, and whatever the pier does not carry, the ribbon turns into movement — a third of a metre of extra sag in the loaded span and a fifth of a metre of rise in the empty one.
The springings that make shortening worse
Fixing an arch at its springings is the stiffer, cheaper and usual way to build one in concrete, and it makes the arch six times as sensitive to its own shortening. The thrust it loses acts at the elastic centre, two thirds of the way up, so the moment lands at the springings as well as the crown, twice as large and the other way round — at the section the fixed arch is designed at, not away from it.
The strand in the sun beside the strand in the shade
Halfway through hanging a stressed ribbon, one span is a sagging cable full of segments and the next is bare tendon stretched nearly straight, and the pier between them carries the difference of their pulls. A warm day takes tension off both — and at the flat sag a ribbon is laid at, the hung span is so nearly all stretch that it loses three quarters of what the bare one does. What moves the pier is not the weather but the shade: strand in the sun beside strand under concrete, 35 kN on the pier for every degree between them. No sun slackens the bare tendon. The hour does change something else, which is the level the joints are cast at.
Named alongside it
The objects these essays reach for when they reach for this one.
RestraintServiceabilityArticulationFrictionImposed deformationSelf-stressBearingIndeterminacyMovement jointSelf-equilibratingSliding bearingBond