Erection — where it appears
Named by 6 essays across 3 fields — each of them below, with the objects they name alongside it.
The angle that doubles the force
A crane hook takes the weight and nothing else. What holds the load is a set of legs running down to it at an angle, and each leg is a two-force member — so at thirty degrees from the horizontal each of two legs carries the entire load, and the difference goes into the thing being lifted as compression.
Built to the wrong length
A redundant structure's members do not have independent lengths. Choose all but one and geometry decides the last, so a member made a different length has to be pulled or pushed into place — and the force required stays in the structure for as long as the structure does. Nothing has been applied to it, there is no load case and no factor, and the members are carrying real force.
The hole made bigger so the steel would fit
A preloaded joint carries load by friction, and the friction is reduced by the shape of the hole the bolt passes through — not by how much steel the hole removes, but by a coefficient in a table. An oversize hole costs fifteen per cent of the resistance; a long slot costs thirty-seven. Both are provided because the steel would not otherwise line up.
The tendon that pulls before the deck arrives
A stressed ribbon is hung one span at a time, and the obvious fear is the stage at which one span carries its deck and the next does not: the pier between them asked for a whole span's thrust. It is not asked for that, because tendons cut to the finished length are already stretched across the empty span and pulling. For two 100 m spans at a fiftieth, the rigid pier's stage force is 4,109 kN against a crowd's 9,440 — unless the tendons were sized generously, when the stage overtakes the crowd.
The strand in the sun beside the strand in the shade
Halfway through hanging a stressed ribbon, one span is a sagging cable full of segments and the next is bare tendon stretched nearly straight, and the pier between them carries the difference of their pulls. A warm day takes tension off both — and at the flat sag a ribbon is laid at, the hung span is so nearly all stretch that it loses three quarters of what the bare one does. What moves the pier is not the weather but the shade: strand in the sun beside strand under concrete, 35 kN on the pier for every degree between them. No sun slackens the bare tendon. The hour does change something else, which is the level the joints are cast at.
The span cast in the afternoon
A stressed ribbon's joints are cast on whatever day the programme reaches them, and a span cast on a warm afternoon sets around strand that has lengthened in the sun. It cools that night as a concrete band eleven times stiffer than the strand, and the band does not stretch back as the strand would have. On a ribbon with a sag of 2 per cent, a span cast 20 °C warmer than its neighbour ends 72 mm higher than it was set and leaves 713 kN on the pier between them — a seventh of what a crowd on one span puts there. On a flatter ribbon the same afternoon costs more than the crowd. The difference between the two spans is the strand's flexibility against the band's, and only the elastic part of it differs; the part that comes from the sag is the same for both.
Named alongside it
The objects these essays reach for when they reach for this one.
PrestressCable stiffnessStressed ribbonThermal movementToleranceConstruction sequenceImposed deformationIndeterminacySag ratioStiffnessBearingBolt hole