The first hinge, with the loaded beam's two joints chosen separately. The load factor at which the two-bay frame's first plastic hinge forms, against the stiffness of the joint at the loaded beam's inner end, for three joints at its outer end, both exactly as strong as the beam. The highest, 4.77, is at an inner joint of 13 EI/L with the outer end rigid: 94% of the collapse at 5.06. The frame's own full-strength joints, 25 EI/L at 1.2 times the beam, give 3.78. Internal forces

The joint chosen for one wind

A frame's beam carries more moment at one end than the other when the wind pushes, so it seems that each end's joint could be chosen for its own end, softer where the moment is larger, and the beam brought to its plastic moment everywhere at once. Chosen that way the first hinge rises to 94 per cent of the collapse load and no further, because the wind takes off one end what it adds to the other. And the wind turns round.

How far a short wave reaches across a cracked deck, by where the transverse bars are. A cracked deck 3 m wide beside the web, 1.5% of longitudinal bars, carrying a moment wave 3 m long: its stretch across the width as a share of the stretch at the web, for three layouts of transverse bars. At a metre from the web, 0.20 with 1.5% across everywhere, 0.22 with 1.5% only in the first 1.0 m and 0.5% beyond, and 0.11 with the light bars by the web and the heavy ones beyond. Sections and stress

The bars in the first metre from the web

A cracked concrete deck over a pier spreads a girder's tension into its width only as far as its bars let it, and the earlier calculation smeared those bars evenly across the deck. A drawing never does. With the bars where a drawing puts them, the width over the pier turns out to be decided almost entirely by the steel within a metre of the web — the transverse bars there set how far the tension reaches, and longitudinal bars moved there do more than the same bars spread out.

The critical moment as the far end's moment turns round. The critical moment at the more heavily loaded end against the ratio ψ of the two end moments, on a span of 8.0 m, for a top flange of 300 mm out of 450 compressed at that end and for the same diagram turned over, with equal flanges for comparison. Uniform moment, 1,018 and 283 kN·m. The larger flange's sense peaks at 2,151 near ψ = −0.35 and falls to 863 at ψ = −1, where both senses meet and equal flanges reach 1,455. Stability

The weaker half sets the beam

A girder with a wide top flange and a narrow bottom one is nearly twice as hard to buckle sideways as the equal-flanged girder made from the same steel, provided the moment keeps its wide flange in compression. Put the beam in double curvature and the half whose narrow flange is compressed takes over: the critical moment falls from 2,151 kN·m to 863, below the 1,455 of equal flanges, and the strong half lends the weak one only twelve per cent.

One pier settles, and the size of the group hardly matters. The largest moment anywhere under the full 35 kN/m with one pier settled, the worst pier chosen, for twelve 7 m spans as simple spans, in continuous groups of two and three, and continuous throughout, EI 100,000 kN·m². At 15 mm, 214, 260, 245 and 260 kN·m; at 40 mm, 214, 337, 367 and 392. Internal forces

What the joints in a viaduct are for

A long viaduct is usually built as continuous groups of three or four spans with a movement joint between them, and the grouping is often explained as a compromise between continuity's economy and a chain of simple spans' indifference to settlement. Computed, settlement does not take part in the compromise: two spans continuous already feel a sinking pier as the whole viaduct would. Nor does robustness, much. What the joints are for is the movement of the deck, and what the group's size buys is the moment of the traffic.

A lip at each edge, and the strip's stiffness. The bending stiffness of a strip over the beam's against Searle's number, at Poisson's ratio 0.30, with free edges and with a lip at each edge of 0.05, 0.2 and 1 times the strip's own area, and with a lip of unbounded area. At Searle's number 1 they give 1.003, 1.004, 1.007, 1.012, 1.015; at 100, 1.087, 1.091, 1.092, 1.093, 1.093. The plate's value is 1.099. Materials

The lip that holds the wrong thing

A thin strip bent along its length curls sideways into a saddle and stays a beam; held at its edges, it becomes a plate and is a tenth stiffer. A lip rolled along each edge looks like the way to hold them. It is not. A lip pushes back on an edge that moves out of line, with a stiffness made of the very curvature it resists, and it holds the edge's position but not its slope — so at the small curvatures of service even a lip of unbounded size leaves the strip within 1.5 per cent of a beam. What makes a plate of a gently bent strip is a neighbour that stops its edges turning.

The thrust as the springings spread. The horizontal thrust of a semicircular arch of 10 m span over its least thrust at rest, against the springings' spread as a share of the span, up to collapse, for rings of 0.11, 0.15 and 0.2 of the radius. The thrust rises to 1.02, 1.34, 1.89 times its value at rest at spreads of 0.4%, 6.2%, 13.7% of the span. Structural form

The arch that pushes harder as it spreads

A masonry arch whose abutments move apart does not fall when they first move. It cracks at its crown and its haunches, turns into a mechanism of three hinges, and keeps standing while its crown drops — and the thrust it puts on the abutments that are already giving way rises. A semicircle of 10 m with a ring 0.15 of its radius survives 626 mm of spread, pushing a third harder at the end than at the start, and collapses only when the thrust reaches the outer edge of its springing.

The spread ring at its point-load capacity. A semicircular arch of 10 m span with a ring 0.15 of its radius, its springings 313 mm apart, 0.50 of the 626 mm at which it collapses under its own weight, drawn to scale with a point load at 0.25 of the span. The line of thrust is drawn at the largest load the ring carries, 29.8 kN a metre width, 0.126 of its weight: it passes through hinges 30.0°, 85.0°, 142.5° from the left springing and reaches the extrados at 180.0°, where the fourth hinge would open. Structural form

The wheel on an arch that has spread

A masonry arch whose springings have moved apart still stands, and its thrust has risen. It has not grown stronger. A semicircle of 10 m span with a ring 0.15 of its radius carries 52.8 kN a metre on its quarter span before its springings move, and 29.8 kN at half the spread that would bring it down. A point load and a spread spend one reserve, the thrust the far springing can take, and the spread spends it first.

Where a girder held along its top flange twists as it buckles. The twist along a 8.0 m span whose ends are hogged 2.0 times its sagging moment, a slab holding its top face, each mode scaled to its largest: a 300 mm top flange over a 150 (1,066 kN·m at the supports), equal flanges (7,083) and a 150 over a 300 (24,482), and the wide-topped girder with no slab (746). At mid-span the held modes twist 1.00, 0.86 and 0.51 of their largest. Stability

The slab holds what the shear centre lets it

A floor slab fixed along a girder's top flange holds a line, and the line is worth its distance from the shear centre. Over the supports of a fixed-ended 8 m span the slab raises the wide-topped girder's buckling moment by 43 per cent, the equal-flanged girder's fivefold and the wide-bottomed girder's fifteenfold — because the wide top flange drags the shear centre up to the slab, where holding it holds almost nothing. Under a uniform hogging moment the same slab is worth under a tenth to all three.

Where a round hole's tees hinge. A 300 mm hole in the 533 mm beam, centred 0.15 of the way along its 9.0 m span, drawn to scale with the flanges' inner faces. The first cut to yield is at −35° from the vertical, on the side towards the support, at 5.23 times the load; the mechanism's four hinges form at −42° and 35°, 187 mm apart, at 6.05 times. The design rule's rectangle, 135 by 270 mm, gives 6.14. Sections and stress

The round hole that hinges off its centreline

A circular hole in a beam's web is shallowest at its centreline and that is not where it fails. Cut the tees vertically all the way round and the first to yield is 35° round on the side towards the support; the mechanism's four hinges form 30° to 60° either side, wider for a small hole near a support than for a large one at mid-span. The design rule replaces the circle with a rectangle 0.45 of its diameter long and 0.9 deep — too short and too deep — and the two errors cancel to within two per cent along most of the span, but not beside a support, where the rule overstates a small hole by eleven.

Two doubtful piers settle: groups of three, joints over them, or each in a pair. Twelve 7 m spans under the full 35 kN/m, the fifth or the eighth pier settling, whichever is worse, the largest moment anywhere. At 40 mm: groups of three 367 kN·m, joints over the doubtful piers (groups of 5, 3, 4) 315, each doubtful pier in the middle of a two-span pair (4, 2, 1, 2, 3) 230, continuous throughout 373, simple spans 214. With no settlement, 172, 184, 214, 181 and 214. Internal forces

The doubtful pier belongs in the middle of a pair

A viaduct's designer who knows which piers stand on poor ground can put a movement joint over each of them, and the joint helps: with either of two piers settling 40 mm, twelve spans grouped to put joints over them carry 315 kN·m where groups of three carry 367. Putting each doubtful pier in the middle of a two-span pair does far better, 230, because a pair's hogging is the thing a settling middle pier relieves. Under the full load, until its pier has sunk 35 mm, a pair is no worse than two simple spans, and it pays for that with the traffic envelope that groups of three were chosen for.

Rounds of the jacks: one pier at a time, or all together. The largest pier error as a share of the landed one, the mean of 40 fabrications, against rounds of the jacks — a round being every jack operated once: one pier at a time from the left, 0.49, 0.20, 0.15 after one, two and three rounds; all together from one set of readings, using the truss's own lift matrix, 0.00 after one; using the matrix of a truss whose web does not stretch, 0.30, 0.11, 0.04. Deflection

The second pier undoes the first

A truss continuous over one pier has its reaction set by one jack: lift until the load cell reads the design value, pack the bearing, done. Over three piers the jacks argue. Lifting one pier a millimetre hands 85 per cent of what it gains to the pier beside it, so jacking each pier to its own design reaction in turn leaves half the error after a full round and still a seventh after three. The error that will not go is the one the piers share, which lifting them all together barely moves. Read every pier once and solve for all the lifts together, and one round of the jacks does what ten rounds one at a time cannot.

Doubtful piers that may rise or settle, by how much. Twelve 7 m spans under the full 35 kN/m, the fifth and eighth piers each moving anywhere between rising and settling by the amount on the axis, the largest moment over every combination. At ±40 mm: continuous 518 kN·m, groups of three 465, joints over the doubtful piers 335, each in a pair 459, simple spans 214. Internal forces

The pier that may rise belongs under a joint

A pier that may only settle is best put in the middle of a two-span pair, whose hogging a settlement relieves before it adds to anything. A pier on swelling clay, or over a culvert that may be relieved of its fill, may rise instead, and then the pair is the worst place for it: 40 mm of heave puts 459 kN·m into a pair that would have carried 230 for the same settlement. The place that is gentle both ways is the end of a group, under a movement joint. With the doubtful piers' movement known in size but not in sign, joints over them carry 335 kN·m where pairs carry 459 and groups of three 465 — and nothing with the same traffic envelope does better.

A splice's loop, and the one loose bolt it can show. The loop a gauge across a lap splice of six bolts at a 70 mm pitch in two 140 by 15 mm plates, each bolt clamped by 172 kN with a friction of 0.50 draws under a cycle of ±120 kN, drawn as the reading less the tight row's straight line, so that only what is not elastic shows: all six tight, the end bolt at half its clamp, and the third bolt at half. Its width at no load is 0.710 µm tight, 1.381 with the end bolt loose and 0.712 with the third. Connections

The loop that sees only the end bolts

A friction joint's hysteresis loop below slip carries its clamp in it, so a gauge across a splice reading a small loop could in principle tell a loose bolt from a tight one. In a row of six it can tell only some of them. The plates between the bolts share the load so that the two end bolts carry 38 kN of a 120 kN cycle and the middle two 7, and a loop's width goes as the square of a bolt's force: the end bolts draw the loop, the middle ones barely touch it. One end bolt at half its clamp nearly doubles the loop; the third bolt at half changes it by a third of a per cent. Forty rows of scattered clamps read their end bolts' mean with a correlation of 0.99 and their weakest bolt's with 0.51.

A jacked joint starts where creep will take it away from. For two 12 m pretensioned beams, 300 mm wide and 700 mm deep, with a 160 mm slab 1.2 m wide, in 60 per cent humidity, made continuous over their pier in one pour with the slab: the joint's moment, sagging positive, over thirty years, the slab at six weeks and at a year, jacked so that it ends with nothing (solid) and not jacked (dashed). With the slab at six weeks the jack puts −413 kN·m into the joint, against 160 the restraint would reach; with the slab at a year, 407 against −214. Deflection

The joint born holding a moment

A continuity joint over a pier ends its first thirty years sagged or hogged by the beams' creep and the slab's shrinkage, by an amount the date of the pour decides. Jacking the beams' pier ends before the joint is cast lets it be born holding the opposite moment, so that the two cancel at thirty years. The arithmetic works for any slab date. The jack does not, for two reasons: the beams' creep relaxes a jacked moment like every other restraint, so the jack must be two to three times the moment it cancels and is larger than the joint's cracking moment on either side; and a jack sized for one humidity is wrong by as much as the moment it removed at another. Held to what the joint can take uncracked, it cancels about half.

All themes