The mechanism that stands up anyway
Two bars in a straight line between two pins are a mechanism by the count, by the rank and by every measure of how nearly a frame folds. Tension them and they carry load: 200 kN of tension gives the joint the stiffness of the same bars raised 1.8 degrees, and where the bars raised 3 degrees snap through at 11 kN, the tensioned flat pair carries 50 kN and goes on stiffening. The stiffness is a lack of fit of four millimetres, which 83 degrees of warmth takes away; compressed, the same pair buckles to rest crooked on one side or the other; and no tension can reach a mechanism that swings rather than shivers.
The joint that softens under its own load
A bolted end plate is stiff until its moment passes two thirds of its resistance and then softens until, at its resistance, it is a third as stiff. Put such joints at every beam end of a frame under a pattern load and a push, and the most loaded joint softens first and hands its share across the column to the joint on the other side, which carries six times as much for three times the load. The redistribution grows as the frame approaches its strength. Every joint ends at its own stiffness, so the single secant stiffness an elastic analysis is allowed asks the loaded joint for half as much again as it can carry, and gives the exterior panel three quarters of what it gets.
The braces that have to hold each other
One brace at mid-height must have a stiffness of twice the column's load over the length it halves. Spread the same column over four braces and each one must be stiffer, not softer: 3.62 times the load over its segment, rising towards four with every brace added, because the shape the braces have to stop is a zigzag in which every brace point is pushed by both its neighbours. Braces that tie the column to itself instead of to the ground need one, however many there are. A row with surplus stiffness can carry one brace at two thirds of the ideal, but not one that is missing, and the force each brace has to resist grows with the count.
The section that yielding cannot reach
A truss that loses a member in an accident is allowed to yield while it finds another way to stand, so a counter-braced truss sized by the lower-bound theorem ought to need far less steel than one sized elastically. It needs 1,296.7 units against 1,304 — seven of the 104 that robustness costs. One diagonal gone, the damaged panel is determinate at its own section, and no redistribution can change a force a cut decides; yielding can reach only the verticals. What does move the price is a counter that buckles: good for half its tension in compression, it adds 120 units, more than robustness did.
The beam built towards its own middle
A continuous prestressed beam built one bay at a time from one end keeps about half the secondary moment a beam stressed at once would carry, and most of it at the end where it was finished. Built from both ends towards a closure bay, it is symmetric, and the closure's supports keep only a little more than the rest: 172 kN·m against 161. Built from the middle outwards, the first interior supports — the ones the load hogs hardest — keep 215, 63 per cent of the at-once value, for any length of beam. The order of construction is a design variable. Creep then takes back most of the choice.
The braces that pull only one way
A brace made of a single tie, or a cross-frame whose diagonals can only pull, resists a girder twisting one way and not the other. A buckling girder has no preference between the two directions, so it takes the one its braces leave free. Three such braces all facing the same way leave a 24 m girder exactly as weak as if they were not there. Facing alternately, they reach 3,087 kN·m at the stiffness that takes two-way braces to 5,627, and no stiffness takes them past 4,063. Opposing the outer pair does not help; one one-way brace anywhere in the row is enough to cap it. Every brace has to resist both ways, and made of ties that costs twice the steel.
The arch that waits with its hinges open
A concrete arch fixed on the day it is struck has to restrain every millimetre its rib creeps and shrinks and its ground settles for the rest of its life, and jacking it again a year later cannot make it forget the year before. Struck as a three-hinged arch and left that way, it takes the fastest part of every movement for nothing, because a determinate arch has no moment to spend on a change of length. Closed at a year it ends the century with half the springing moment of the arch fixed at striking, and a third less than the arch jacked again on the same date. The price is a crown that has dropped 78 mm while it waited, and a rib that is no longer the shape of its own thrust.
The jack that creep carries past the mark
A continuous beam built from both ends towards a closure bay keeps less secondary moment at its supports than the same beam stressed all at once, and creep gives back three-quarters of the difference over the years. Bridge builders do not always wait: before the closure is cast, the supports can be lowered on jacks so that the beam starts with the moments it would have had. Jacked by the whole difference, it does start there — and creep, which goes on returning the staged deficit while it relaxes the jacked correction, carries it past them, by a seventh of what was jacked. Jacked by 0.89 of the difference, it starts a ninth short and ends a ninth over. And it takes a jack at every interior support: with fewer, the moment goes to the wrong places.
The span cast in the afternoon
A stressed ribbon's joints are cast on whatever day the programme reaches them, and a span cast on a warm afternoon sets around strand that has lengthened in the sun. It cools that night as a concrete band eleven times stiffer than the strand, and the band does not stretch back as the strand would have. On a ribbon with a sag of 2 per cent, a span cast 20 °C warmer than its neighbour ends 72 mm higher than it was set and leaves 713 kN on the pier between them — a seventh of what a crowd on one span puts there. On a flatter ribbon the same afternoon costs more than the crowd. The difference between the two spans is the strand's flexibility against the band's, and only the elastic part of it differs; the part that comes from the sag is the same for both.
The braces with slack in their bolts
A cross-frame bolted into clearance holes resists nothing until the girder it braces has twisted far enough to take up the clearance, and then resists fully. It is a two-way brace that starts late. The girder, erected a little crooked, twists freely into its braces while the load is still small, and from then on the braces hold a girder that is more crooked than the one they were fitted to. The slack acts as an imperfection, and a costly one: each milliradian of it adds more to the middle brace's force than a milliradian of extra crookedness would, and no stiffness takes it back out. On a 24 m plate girder braced at twice the stiffness it needs, three milliradians of slack — a pair of ordinary clearances over its depth — raise the middle brace's force by 70 per cent.
The roof that makes the wind worse every storm
A portal frame's shakedown check is made on its elastic moments, and the elastic moments a heavy roof sways are larger than first-order analysis says: each storm's wind is amplified by 1/(1 − N/Ncr), on its way out and on its way back. On pinned bases under a 1,000 kN roof that takes the wind at which the knees start to alternate from 110 kN down to 90, and the shakedown load down by 4.8 per cent where gravity leads and 8.4 where the wind does. Fixed bases are worth more under a heavy roof than without one, but by half again, not twice.
The pier's share is cut into the members
A truss continuous over a middle support has one reaction that statics cannot find, and the lengths its members are cut to decide it. Cambered to land level under its dead load on three bearings, a two-span truss puts 572 kN on its pier; cambered span by span, as two simple trusses, the same members on the same bearings put 480 kN there and carry the dead load with no moment over the pier at all. The list chooses the moment diagram. And a millimetre of shop tolerance on every member moves the pier's share as much as a bearing set fourteen millimetres out of level, so a reaction the design depends on has to be set by a jack rather than by a drawing.
The slip that peaks where the moment turns
A simply supported composite beam slips most at its supports, and its studs are crowded there. Make the same beam continuous over a middle support and the slip peaks twice: at the end support, and again, just as hard and the other way, at the point of contraflexure — not over the middle support, where the shear is largest but the slip falls to nothing. Studs graded toward the supports, as a simple span's would be, miss the second peak and buy a tenth; graded to the slip they buy more than a third. And the hogging region cannot give its studs away to the span, because its edge is where the second peak is.
The check that cannot see the beams
The unit load that finds a frame's sway may be carried on any structure that can carry it, and in a frame of four bays and ten storeys it can be carried down one line of columns alone. Then the roof sway is that line's real moments against the unit load's, a few dozen products by hand — exact for the frame as drawn, for its beams cracked to a third of their stiffness, for its joints made springs and for its bases made springs, the last only once the bases' rotation is given its own term. It is exact because the unit load never enters a beam. Which makes it a check on the analysis's arithmetic that cannot say anything about the analysis's beams.
The joint stronger than its beam
A full-strength joint never reaches its own resistance: the beam beside it hinges first. But an end plate softens from two thirds of its resistance, and a joint only a little stronger than its beam is already on the soft part of its curve before the beam yields. The softening sheds moment from the beam's end into its span, so it delays the first hinge — by 8 per cent for a joint at 1.2 times the beam's strength, 18 for one at exactly the beam's, and not at all from 1.5 on. It never moves the collapse. And too much shedding hands the first hinge to the span, so the first hinge comes latest at the stiffness where the end and the span yield together.
The root that belongs to the column
A cantilever's root must hold its flanges against warping at about fifty times the cantilever's own warping stiffness to count as built in, and doubles its buckling moment if it does. A flush end plate is the usual root, so it ought to be the plate's thickness that decides. It is not. The flanges warp by turning in plan in opposite directions, the plate passes that to the column as two opposite torques, and an open column twists between them more easily than the plate bends: three quarters of the root's flexibility is the column. An ordinary root is worth about six times the cantilever's stiffness, halfway up the curve, and a thicker plate barely moves it. Boxing the column does.
The shelter that stops at the interface
Piles in a group shelter one another, and practice counts the shelter as a factor on each row's soil, calibrated on groups in uniform ground. Put the same group in soft ground over stiff and the calibration has to be read one of two ways — the shelter at every depth, or only where the ground is soft — and the two readings disagree about which row works hardest. The first gives the leading pile 17 per cent more moment at the cap; the second gives the last pile 24 per cent more in the ground.
The floor the columns lean on
A storey of pin-ended columns, every one a little out of plumb, leans on its floor, and the floor leans on a core. Count the floor as rigid and the core needs the sum of the columns' demands. A floor that shears in its own plane is a brace in series with the core, and the far columns lean on it before their push arrives. With a floor a hundred times stiffer per bay than a column's own sway softening, the storey's buckling factor falls from 4.0 to 1.5 and the core is asked for twice as much.