A cracked concrete deck over a pier spreads a girder's tension into its width only as far as its bars let it, and the earlier calculation smeared those bars evenly across the deck. A drawing never does. With the bars where a drawing puts them, the width over the pier turns out to be decided almost entirely by the steel within a metre of the web — the transverse bars there set how far the tension reaches, and longitudinal bars moved there do more than the same bars spread out.

Assumes The flange that is not all there, The angle that uses half of itself and The strain that was imposed, and the stress that leaked away.

The deck that cracks over the pier asked how wide a concrete deck works over the interior support of a continuous composite girder, where the deck is in tension, cracked across its width, and carries its share of the girder’s moment in its reinforcement. Shear lag in a flange depends on one property, the ratio of its in-plane shear stiffness to its axial stiffness, and for a cracked deck both come from its bars: the longitudinal bars carry the tension, and the shear between them is carried by the transverse bars and by concrete struts between the cracks. Equal bars both ways at about 1.7 per cent gave the uncracked plate’s own ratio, so cracking and shear lag simply multiplied.

Every deck in that essay was a membrane with its bars smeared evenly through it. The essay ended with a reinforcement drawing in mind. A real deck over a steel girder has its transverse bars in two layers, heavier over the girder where the slab spanning between girders hogs; its longitudinal bars are often bunched over the girder, where the hogging is largest; and the strip next to the web, over the steel flange and the shear studs, is where the struts start and where the bars may be thinnest. The question was whether the width over the pier is governed by the average transverse steel or by the steel in the first metre from the web; whether concentrating the longitudinal bars narrows the width as much as reducing them would; and whether a deck reinforced for its slab span alone is the narrowest a continuous girder can have.

A deck cut into strips across its width

The girder is the earlier one: two continuous spans of 20 m, a bearing a metre long over the pier, and a deck 3 m wide either side of the web. The reference deck is cracked, with 1.5 per cent of bars each way, spread evenly.

The new step is to let the bars vary across the width. The deck is cut into 120 strips parallel to the girder, each with its own longitudinal and transverse ratios. Each strip has an axial stiffness from its longitudinal bars and passes shear to its neighbour through a stiffness from the compression field of both sets of bars, at the strut angle the earlier essay used. A moment wave along the girder stretches the deck at the web by some amount; across the width, the stretch falls away as the shear passing from strip to strip runs out, and the ordinary differential equation that describes it is solved strip by strip. The deck’s working stiffness for that wave is its strips’ axial stiffness times their stretch, summed. The girder’s moment near the pier is made of many such waves, and summing them gives the deck’s stiffness over the pier.

Every stiffness in this essay is given as a share of the reference deck’s whole stiffness — its 1.5 per cent of longitudinal bars across all 3 m, all of it working. A deck with fewer bars scores lower for that reason too, which is right, because what the girder gets from its deck is a stiffness, not a width.

One difference from the earlier essay needs saying at the start. The earlier calculation assumed the shape of the stretch across the width, a parabola, and found 0.33 of the deck working over the pier. The strip model solves for the shape and finds 0.39 for the same deck. It also leaves out the deck’s straining across its width, which a cracked deck’s transverse bars largely allow. So the two models disagree by about a fifth on the absolute number, and everything below is a comparison made inside the strip model, where the method is the same for every deck.

How far a short wave reaches

How far a short wave reaches across a cracked deck, by where the transverse bars are. A cracked deck 3 m wide beside the web, 1.5% of longitudinal bars, carrying a moment wave 3 m long: its stretch across the width as a share of the stretch at the web, for three layouts of transverse bars. At a metre from the web, 0.20 with 1.5% across everywhere, 0.22 with 1.5% only in the first 1.0 m and 0.5% beyond, and 0.11 with the light bars by the web and the heavy ones beyond.
Fig. 1 A cracked deck 3 m wide beside the web, with 1.5% of longitudinal bars, carrying a moment wave 3 m long: its stretch across the width as a share of the stretch at the web, for three layouts of transverse bars. At a metre from the web, 0.20 with 1.5% across everywhere, 0.22 with 1.5% only in the first metre and 0.5% beyond, and 0.11 with the light bars by the web and the heavy ones beyond.

The waves that matter over a pier are short — the reaction is made of short waves, and the bearing spreads them over a metre or so. A wave 3 m long reaches only about a metre into the deck before its stretch has fallen to a fifth. Everything beyond that metre is barely asked to work, whatever its bars.

So the transverse bars beyond the first metre hardly matter — the same conclusion the flange works least where the shear is largest reached for a steel flange, that over a support the width is set by the shear and not by the flange. With 1.5 per cent of transverse bars in the first metre and only 0.5 beyond, the wave reaches across the first metre exactly as it does with 1.5 per cent everywhere, and a little further — the light strip beyond takes less shear, so the strip within holds its stretch slightly longer. With the light bars in the first metre and the heavy ones beyond, the wave is choked off where it starts: it falls to 0.11 of the web’s stretch by the end of the first metre, and the heavy bars beyond have nothing left to pass on.

The width is in the first metre

Which transverse bars decide the width over the pier. The deck's working stiffness over the pier as a share of the reference deck's whole, against the width of a strip beside the web: with 1.5% of transverse bars in the strip and 0.5% beyond it, and the reverse. All light, 0.32; all heavy, 0.39. Heavy in the first metre only, 0.38; light in the first metre only, 0.32.
Fig. 2 The deck’s working stiffness over the pier as a share of the reference deck’s whole, against the width of a strip beside the web: with 1.5% of transverse bars in the strip and 0.5% beyond it, and the reverse. All light, 0.32; all heavy, 0.39. Heavy in the first metre only, 0.38; light in the first metre only, 0.32.

The stiffness over the pier follows the strip by the web. A heavy strip half a metre wide recovers most of the difference between all-light and all-heavy; one a metre wide recovers 0.38 of the 0.39 available. The reverse layout, light by the web and heavy beyond, is nearly as poor as light bars everywhere, 0.32, unless the light strip is narrower than half a metre.

The answer to the first question is therefore definite. The width over the pier is not governed by the deck’s average transverse steel. Two decks with the same average — heavy by the web and light beyond, or the other way — give working stiffnesses a fifth apart. What matters is the shear stiffness in the first metre, because that is where the short waves at the pier pass their shear outward, and a deck that is stiff there and soft beyond loses almost nothing.

That suits a real drawing well. A deck slab spanning between girders carries its largest hogging moment over the girder, and its transverse top bars are heaviest there for the slab’s own sake. The bars a slab needs for its own span are already where the girder needs them for its shear lag.

Moving the longitudinal bars toward the web

The longitudinal bars are the deck’s axial stiffness, and the earlier essay found, through the modulus ratio, that fewer of them widen the deck’s effective width while carrying less. Moving them is a different change from removing them.

The same longitudinal bars, moved toward the web. The deck's working stiffness over the pier, with the same total of longitudinal bars — 1.5% of the whole width — and a growing share of them placed within a metre of the web. Spread evenly, a third in that metre: 0.39. Two thirds there: 0.55. Nine tenths: 0.63. The transverse bars stay at 1.5%.
Fig. 3 The deck’s working stiffness over the pier, with the same total of longitudinal bars, 1.5% of the whole width, and a growing share of them placed within a metre of the web. Spread evenly, a third in that metre: 0.39. Two thirds there: 0.55. Nine tenths: 0.63. The transverse bars stay at 1.5%.

The same bars moved toward the web make the deck stiffer over the pier: from 0.39 spread evenly to 0.55 with two thirds within a metre of the web, and 0.63 with nine tenths there. The reason is plain once the shape of the stretch is in view. The first metre is where the deck stretches nearly as much as the web; bars placed there work at nearly their full strain, while bars two metres out work at a fifth of it. Concentrating the bars puts them where the girder’s tension can reach them.

That is the opposite of what the lead feared. A deck whose longitudinal bars are bunched over the girder is not narrower for it in any sense that costs the girder: its working stiffness over the pier is larger. It is the stiffness that decides how much of the girder’s hogging moment the deck carries and how much is left for the steel section, and the reaction moves one per cent and the moment five found that the moment a continuous girder carries over its pier follows its stiffness there. A stiffer deck over the pier draws more of the hogging moment to the support, which one support too many would recognise as the price of any stiffness added where an indeterminate beam is already working hardest.

Fewer bars, or the same bars nearer

Fewer bars, or the same bars nearer the web. The deck's working stiffness over the pier against its longitudinal steel, spread evenly and with two thirds of it within a metre of the web. Spread, 1.5% gives 0.39 and 1% gives 0.29. Concentrated, 1% gives 0.40, as much as 1.5% spread, and 1.5% gives 0.55.
Fig. 4 The deck’s working stiffness over the pier against its longitudinal steel, spread evenly and with two thirds of it within a metre of the web. Spread, 1.5% gives 0.39 and 1% gives 0.29. Concentrated, 1% gives 0.40, as much as 1.5% spread, and 1.5% gives 0.55.

Reducing the longitudinal bars evenly from 1.5 per cent to 1 lowers the stiffness over the pier from 0.39 to 0.29. Concentrating the 1 per cent, two thirds of it in the first metre, brings it back to 0.40, as much as the 1.5 per cent spread evenly. A third of the longitudinal steel in the deck over the pier is, for the girder’s stiffness there, worth nothing if it is spread to the deck’s edges.

This is a statement about stiffness. The bars at the edge of the deck still carry the deck’s own cracking and crack widths — and the same steel can leave a wider crack when it is spread thinner; crack width is a property of each strip’s own bars, wherever the girder’s stiffness is decided — and a code’s minimum reinforcement for crack control applies across the whole width. But the steel above that minimum, placed for the girder’s hogging resistance, does most for the girder within a metre of its web.

The deck’s own width

The usual effective width is a different number: the share of a deck’s own stiffness that works, not the share of a reference deck’s.

The deck's own effective width over the pier. The working stiffness over the pier as a share of each deck's own whole, its effective width in the usual sense, against the longitudinal steel. Spread evenly, 39% at 1.5% and 50% at 0.5%: fewer bars work over a wider share. Two thirds of them by the web, 55% at 1.5%.
Fig. 5 The working stiffness over the pier as a share of each deck’s own whole stiffness, its effective width in the usual sense, against the longitudinal steel. Spread evenly, 39% at 1.5% and 50% at 0.5%: fewer bars work over a wider share. Two thirds of them by the web, 55% at 1.5%.

On that measure fewer bars spread evenly give a wider deck, 50 per cent at 0.5 against 39 at 1.5, because a deck with less axial stiffness has a larger ratio of shear to axial stiffness and the tension spreads further into it, as the earlier essay found. Concentrating the bars gives a wider deck too, 55 per cent of its own at 1.5, but for a different reason: most of its stiffness is in the strip that works.

So the question whether concentrating narrows the width as much as reducing has an answer that depends on which width is meant, and on either it is “no”. Reducing the bars widens the deck’s own effective width and lowers what the girder gets. Concentrating them widens the deck’s own effective width and raises what the girder gets. The two words “effective width” describe a share of a deck, and the girder needs a stiffness; the flange that is not all there made the same distinction for a steel flange, where the material that does not work is still paid for.

How wide the first metre is

A metre is not a constant of nature, and two things might move it: the length over which the pier’s reaction is spread, which sets how short the shortest waves are, and how tightly the bars are bunched.

The bearing first. With the reaction spread over half a metre, the reference deck gives 0.34 over the pier; over a metre, 0.39; over two, 0.47; over four, as a long diaphragm might spread it, 0.56. A longer bearing removes the shortest waves and the deck works wider. But the share that the first metre’s transverse bars recover hardly changes. Heavy bars in the first metre and light beyond give 0.33 of the 0.34 at the shortest bearing and 0.54 of the 0.56 at the longest, 98 and 96 per cent; light bars in the first metre give within a few hundredths of light bars everywhere at every bearing. Even at four metres, where the waves reach furthest, the first metre carries the deck’s shear stiffness.

Then the bunching. With two thirds of the longitudinal bars placed within a quarter of a metre of the web — as close as the studs on a narrow flange allow — the stiffness over the pier is 0.76 of the reference’s whole; within half a metre, 0.68; within a metre, 0.55; within a metre and a half, 0.46; within two metres, two thirds of the bars in two thirds of the width, 0.39, which is the evenly spread deck again. The tighter the bunching, the more the bars over the pier are worth to the girder, and the curve has not flattened even at a quarter of a metre, because the shortest waves near the pier are still being resolved there.

There is a practical limit the model does not see. Bars bunched into a quarter of a metre over a steel flange crowd the studs, and the concrete between them must still be placed and compacted round both. A drawing that keeps two thirds of its longitudinal steel within a metre of the web, which is what the earlier figures assumed, is a modest arrangement and already worth 40 per cent over the even spread.

The deck the slab would choose

Three decks along the girder. The working stiffness of the cracked deck along two 20 m spans, as a share of the reference deck's whole: the reference, 1.5% both ways; a deck reinforced for its slab span alone, 1.5% across within 0.8 m of the web, 0.6% beyond and 0.5% along; and the same with longitudinal bars added to 1.25% within a metre of the web. Over the pier, 0.39, 0.16 and 0.28.
Fig. 6 The working stiffness of the cracked deck along two 20 m spans, as a share of the reference deck’s whole: the reference, 1.5% both ways; a deck reinforced for its slab span alone, 1.5% across within 0.8 m of the web, 0.6% beyond and 0.5% along; and the same with longitudinal bars added to 1.25% within a metre of the web. Over the pier, 0.39, 0.16 and 0.28.

The last question was about a deck reinforced only for its own slab span: heavy transverse bars over the girder, where the slab hogs, light ones between, and longitudinal bars only at the distribution minimum, here half a per cent. It gives the girder 0.16 of the reference deck’s stiffness over the pier, and 0.29 at mid-span, cracked everywhere by assumption. Its transverse bars are well placed — heavy by the web, exactly where the first metre needs them — and its weakness is the longitudinal steel, of which there is a third of the reference’s.

Add longitudinal bars over the girder only, raising the first metre to 1.25 per cent, and the stiffness over the pier rises to 0.28 with half the reference deck’s longitudinal steel. That is the efficient deck, and the slab’s own design has already placed half of it. So the deck reinforced for its slab span alone is the narrowest in the sense that matters, the lowest stiffness over the pier; but the remedy is cheap and specific, and it is in the first metre.

What the strips leave out

The strip model takes each strip as a cracked membrane with its bars smeared through its own width, and the strut angle in each strip as the one that makes its shear stiffness least. A bar is a discrete thing at a spacing of perhaps 150 mm, and a strip a quarter of a metre wide holds one or two; the model reads a concentration of bars as a smoothly heavier strip. The deck’s straining across its width is not modelled, and the shear connection between the deck and the steel flange is taken as rigid, so the web’s stretch is the deck’s at its edge. A flexible stud connection lets the deck slip along the flange, and partial interaction would reduce what the deck carries before the question of its width arises.

Tension stiffening, the concrete between the cracks carrying some tension, is left out here; the earlier essay found it narrows the deck further, by stiffening its axial modulus more than its shear. And the deck is cracked everywhere along the girder for simplicity, so the sagging regions read as cracked decks too. Over the pier, which is where all the conclusions are drawn, the deck is cracked.

Still open: the deck that is cast in stages

Every deck here is one deck, cracked or not, acting with the girder from the start. Long continuous girders are usually cast in stages, the deck over the spans first and the deck over the piers last, or the reverse, so that the concrete over the pier is younger, has shrunk less and crept less when the girder’s load arrives, and cracks in a pattern set by the casting sequence rather than by the moment. The deck over the pier then carries a restraint force from the stages beside it before the girder’s hogging moment reaches it. Whether a deck cast last over the pier cracks earlier or later, whether the transverse cracks of shrinkage restraint line up with the girder’s hogging cracks or cross them, and whether the strip by the web, which is where the studs restrain the deck most, is where the staged deck cracks first, is what the sequence of casting asks of the strip.

Named alongside this one

Essays reaching for the same objects. Nobody chose these; they are what the concept index makes visible.

The objects this essay names

Each one links to every other essay that touches it.