The collection

Every essay — page 33

Essays 769 to 785 of 785, in the same order.
Where a round hole's tees hinge. A 300 mm hole in the 533 mm beam, centred 0.15 of the way along its 9.0 m span, drawn to scale with the flanges' inner faces. The first cut to yield is at −35° from the vertical, on the side towards the support, at 5.23 times the load; the mechanism's four hinges form at −42° and 35°, 187 mm apart, at 6.05 times. The design rule's rectangle, 135 by 270 mm, gives 6.14. Sections and stress

The round hole that hinges off its centreline

A circular hole in a beam's web is shallowest at its centreline and that is not where it fails. Cut the tees vertically all the way round and the first to yield is 35° round on the side towards the support; the mechanism's four hinges form 30° to 60° either side, wider for a small hole near a support than for a large one at mid-span. The design rule replaces the circle with a rectangle 0.45 of its diameter long and 0.9 deep — too short and too deep — and the two errors cancel to within two per cent along most of the span, but not beside a support, where the rule overstates a small hole by eleven.

6 figures · Web opening
Pushed inside a hole, a tube winds itself against the wall. A 60.3 × 4.83 mm coiled steel tube in a 152.4 mm hole, in water, vertical, pushed with 50 kN: the helix it takes against the wall, drawn over three turns with the hole's width exaggerated. In a vertical hole nothing holds the tube to one side, so any push buckles it, and the wall stops the buckle growing; what is left to find is the helix's pitch, 10.40 m, and how hard it presses on the wall, 420 N per metre — 7.4 times the tube's own weight. Stability

The push that cannot reach the end

A tube pushed inside a hole cannot buckle away — the wall stops it — so it winds into a helix whose pitch tightens as the push grows and which presses on the wall as the square of the push. Friction on that pressure has a startling consequence. Past a certain distance, no push at the near end, however large, delivers anything at the far one.

7 figures · Torque buckling
Two doubtful piers settle: groups of three, joints over them, or each in a pair. Twelve 7 m spans under the full 35 kN/m, the fifth or the eighth pier settling, whichever is worse, the largest moment anywhere. At 40 mm: groups of three 367 kN·m, joints over the doubtful piers (groups of 5, 3, 4) 315, each doubtful pier in the middle of a two-span pair (4, 2, 1, 2, 3) 230, continuous throughout 373, simple spans 214. With no settlement, 172, 184, 214, 181 and 214. Internal forces

The doubtful pier belongs in the middle of a pair

A viaduct's designer who knows which piers stand on poor ground can put a movement joint over each of them, and the joint helps: with either of two piers settling 40 mm, twelve spans grouped to put joints over them carry 315 kN·m where groups of three carry 367. Putting each doubtful pier in the middle of a two-span pair does far better, 230, because a pair's hogging is the thing a settling middle pier relieves. Under the full load, until its pier has sunk 35 mm, a pair is no worse than two simple spans, and it pays for that with the traffic envelope that groups of three were chosen for.

6 figures · Continuity
The head under the slab when the drains are cleaned. The head under the slab above its design head over 120 years, the drains silting with a time constant of 8 years: never cleaned, reaching flotation at 0.97 m in year 24.1; cleaned every 4 years with 20% of the silting beyond reach, year 104.2; and with half of it beyond reach, year 44.2. Equilibrium

The silt a jet cannot reach

A basement held down by drains that silt up floats in the spring of year 24 if nobody touches them. Clean them every four years and it floats in year 104 — if a fifth of the silting is in places no jet reaches; in year 44 if half is. The cleaning interval barely matters beside that share, and the share is not knowable when the drains are laid. But it is measurable as soon as they are first cleaned: the standpipe read just after a cleaning sees only the silt that stayed, and its trend is the drains' life.

6 figures · Uplift
One overload, two orders, and the loops that follow. The root of a notch of factor 3 in a cyclic mild steel, stress against strain, overloaded to ±200 N/mm² nominal and then cycled by ±40 in two orders, compression last and tension last. The small loops run about a root mean of 68 N/mm² after the first order and −68 after the second. Materials

The overload whose last half decides

A notch that has yielded once is left holding a residual stress, and the small cycles that follow run about it. Which sign it has is set by which half of the overload came last: tension last leaves the root in compression, compression last in tension. The same overload, the same small cycles, the same rainflow count — and at a notch of factor three the small cycles' life differs by a factor of 2.4 between the two orders, by 3.8 at a factor of five. Taken at random, the orders do not cancel: the count by range alone overstates the life by a fifth where the small cycles do most of their damage.

6 figures · Stress concentration
The loop a proof load traces, with the stuck part taken away. One cycle of shear between ±17 kN on the bolt's patch, the slide less what a patch stuck everywhere would give, in micrometres: at the full 172 kN preload the loop is 0.169 µm wide at zero load; at half, 0.401. The slides the two share, 4.46 µm at the peak, are left out. Connections

The joint that hides its clamp in its loop

A friction joint loaded well below slip looks like a piece of solid steel, and the stiffness it shows a passing lorry has no clamp in it at all: a bolt at half its preload starts out exactly as stiff as one at full. The clamp is not in the stiffness but in the loop. Cycle the joint through a fifth of its slip load and the edge of each clamped patch slips a little, both ways, and the loop it traces is 0.17 µm wide at full preload and 0.40 at half. A proof load can read a joint's clamp, but only by its hysteresis, and only with a gauge good to a tenth of a micrometre.

6 figures · Slip-critical
Rounds of the jacks: one pier at a time, or all together. The largest pier error as a share of the landed one, the mean of 40 fabrications, against rounds of the jacks — a round being every jack operated once: one pier at a time from the left, 0.49, 0.20, 0.15 after one, two and three rounds; all together from one set of readings, using the truss's own lift matrix, 0.00 after one; using the matrix of a truss whose web does not stretch, 0.30, 0.11, 0.04. Deflection

The second pier undoes the first

A truss continuous over one pier has its reaction set by one jack: lift until the load cell reads the design value, pack the bearing, done. Over three piers the jacks argue. Lifting one pier a millimetre hands 85 per cent of what it gains to the pier beside it, so jacking each pier to its own design reaction in turn leaves half the error after a full round and still a seventh after three. The error that will not go is the one the piers share, which lifting them all together barely moves. Read every pier once and solve for all the lifts together, and one round of the jacks does what ten rounds one at a time cannot.

6 figures · Camber
Visits when the force says, against visits on dates. The creep force in one arm of the late-connected outrigger over fifty years: re-shimmed at 1, 3, 10 years, never above 1.40 MN; re-shimmed whenever a load cell reads 1.40 MN, 3 visits, at 12 months, 4.1 years, 22.7 years; and whenever it reads 0.58 MN, a tenth of the design wind, 8 visits, the first three at 5 months, 7 months, 1.1 years. Structural form

The arm that calls for its own visit

An outrigger connected to a concrete building collects the core's and the columns' differential creep, and re-shimming its joint every few years lets that force go. Dates on a drawing are a guess at how fast the building will creep. A load cell in the joint replaces the guess: re-shim whenever it reads 1.40 MN and three visits, at one, four and twenty-three years, hold the arm there whatever the building does. A building that creeps 60 per cent more than predicted needs a fourth visit; the dated schedule lets it reach 2.30 MN. Holding a tenth of the wind takes eight visits, three in the first thirteen months, and a contractor who can come within weeks.

6 figures · Outrigger
Doubtful piers that may rise or settle, by how much. Twelve 7 m spans under the full 35 kN/m, the fifth and eighth piers each moving anywhere between rising and settling by the amount on the axis, the largest moment over every combination. At ±40 mm: continuous 518 kN·m, groups of three 465, joints over the doubtful piers 335, each in a pair 459, simple spans 214. Internal forces

The pier that may rise belongs under a joint

A pier that may only settle is best put in the middle of a two-span pair, whose hogging a settlement relieves before it adds to anything. A pier on swelling clay, or over a culvert that may be relieved of its fill, may rise instead, and then the pair is the worst place for it: 40 mm of heave puts 459 kN·m into a pair that would have carried 230 for the same settlement. The place that is gentle both ways is the end of a group, under a movement joint. With the doubtful piers' movement known in size but not in sign, joints over them carry 335 kN·m where pairs carry 459 and groups of three 465 — and nothing with the same traffic envelope does better.

6 figures · Continuity
Where the plates feel the cross-frame, and where they never did. The range of the corner angle over one crossing of a 60 m box 4 m wide and 2.5 m deep with ring frames at 4 m and a cross-frame every 20 m, under a four-axle lorry of 440 kN at 1.5 m off its centre line, along the span. With no clearance it is 0.21 mrad at the cross-frames, 0.48 midway between them and at most 0.52; with 0.5 mm of clearance 0.36 at the frames and at most 0.53; with 1.0 mm of clearance 0.50 at the frames and at most 0.53; with no cross-frames at all, 0.51 and at most 0.53. Sections and stress

The plate the loose frame stops protecting

A cross-frame bolted through clearance holes does nothing until a lorry has distorted the box far enough to take up the hole, and among ring frames a millimetre is nearly the whole distortion a lorry produces. What that costs is not the frame's own life but the plates' around it. A tight frame holds the corner angle's range to 0.21 mrad over a few metres either side of itself; a millimetre of clearance lets it rise to 0.50, and a detail there loses a factor of thirteen in fatigue life. The box's worst place does not move, because it was never at the frame. The critical detail moves only if the frame's own detail is a worse category than the plain plate's, which it usually is.

6 figures · Box distortion
The later the fill, the less of the slab's shrinkage is still to come. The slab end's movement away from the stem over thirty years after the fill is finished, its shrinkage and its seasons together, for a 3 m stem fixed at its base, its fill rolled in 250 mm lifts at 60 kN/m, its top held by a 30 m ground slab in 60 per cent humidity swinging 3.0 K either way each year, the fill finished 4 weeks, 6 months, a year, 2.0 years after the slab was cast; the stem lets go of the slab at 2.08 mm. At thirty years the shrinkage has taken the end 4.42, 3.14, 2.36, 1.57 mm away; the slab last touches the stem 1.3 years on, 5.3 years on, still in the thirtieth year, still in the thirtieth year. Equilibrium

The slab left to dry before the fill

A basement stem propped by its ground slab keeps the pressure the roller locked into its fill only while the slab still bears on it, and a slab cast four weeks before the fill shrinks away within sixteen months. Casting the slab first and letting it dry before the fill goes up sounds like the cure. Six months of drying buys four more years; a year keeps the slab touching the stem every summer for thirty. But a slab that touches only in summer gives back the propped moment only in summer, and in the tenth year a stem filled two years late still reaches 63 kN·m of its unpropped 70. The delay keeps the contact. It does not keep the design.

6 figures · Lateral pressure
The mass's path in plan, the wind's swing and then the earthquake across it. The tuned mass's stroke in plan over the last twenty seconds of a wind that swings it ±0.40 m along its line and the first twenty seconds of an earthquake of 1.0 m/s² arriving 90° from that line, inside a ring of stops 0.50 m in radius. In the earthquake the mass strikes the ring 25 times, at up to 0.72 times its weight; its largest stroke across the wind is 0.51 m. Dynamics

The ring the mass swings inside

A tall building's tuned mass is usually swung by the wind across one line, and an earthquake can arrive from any direction. If the mass runs on two tracks with stops on each, an earthquake at right angles to the wind's swing finds its whole stroke free: the wind costs nothing. If it hangs inside a ring of stops, the two strokes add as a vector and the ring is nearer than it looks. In a moderate earthquake across a wind that already swings the mass ±0.40 m of its ±0.50, the ring is struck 2.6 times a record against 0.5 between pairs and 8.0 along the wind's line. In a strong one the ring is struck more often across the wind than along it.

6 figures · Damping
Its own weight bends the line the force runs along. A 168.3 × 5.0 mm steel tube 8.0 m long between pins, horizontal, weighing 198 N/m, as a strut pushed with 100 kN and as a tie pulled with as much, drawn with the depth exaggerated 17 times. Statics alone puts the line of thrust on a parabola 15.8 mm off the straight line between the pins — above it for the strut, an arch; below it for the tie, a cable — and the two end forces meet on the weight's own line at twice that. The band is the kern, ±39.6 mm. The member sags 9.2 mm as a strut and 4.3 as a tie, and bends by the gap between its axis and its thrust line: 25.0 mm for the strut, 11.5 for the tie. Equilibrium

The load at which a strut's weight matters least

A pinned member that weighs something is no longer a two-force member — its own weight bends the line its force runs along into a parabola. A tie only straightens as it is pulled harder. A strut does not: its weight matters least at very nearly half its Euler load, for every section, length and material, and past a certain length it matters at every load the strut can carry.

6 figures · Two-force member
A splice's loop, and the one loose bolt it can show. The loop a gauge across a lap splice of six bolts at a 70 mm pitch in two 140 by 15 mm plates, each bolt clamped by 172 kN with a friction of 0.50 draws under a cycle of ±120 kN, drawn as the reading less the tight row's straight line, so that only what is not elastic shows: all six tight, the end bolt at half its clamp, and the third bolt at half. Its width at no load is 0.710 µm tight, 1.381 with the end bolt loose and 0.712 with the third. Connections

The loop that sees only the end bolts

A friction joint's hysteresis loop below slip carries its clamp in it, so a gauge across a splice reading a small loop could in principle tell a loose bolt from a tight one. In a row of six it can tell only some of them. The plates between the bolts share the load so that the two end bolts carry 38 kN of a 120 kN cycle and the middle two 7, and a loop's width goes as the square of a bolt's force: the end bolts draw the loop, the middle ones barely touch it. One end bolt at half its clamp nearly doubles the loop; the third bolt at half changes it by a third of a per cent. Forty rows of scattered clamps read their end bolts' mean with a correlation of 0.99 and their weakest bolt's with 0.51.

6 figures · Slip-critical
A jacked joint starts where creep will take it away from. For two 12 m pretensioned beams, 300 mm wide and 700 mm deep, with a 160 mm slab 1.2 m wide, in 60 per cent humidity, made continuous over their pier in one pour with the slab: the joint's moment, sagging positive, over thirty years, the slab at six weeks and at a year, jacked so that it ends with nothing (solid) and not jacked (dashed). With the slab at six weeks the jack puts −413 kN·m into the joint, against 160 the restraint would reach; with the slab at a year, 407 against −214. Deflection

The joint born holding a moment

A continuity joint over a pier ends its first thirty years sagged or hogged by the beams' creep and the slab's shrinkage, by an amount the date of the pour decides. Jacking the beams' pier ends before the joint is cast lets it be born holding the opposite moment, so that the two cancel at thirty years. The arithmetic works for any slab date. The jack does not, for two reasons: the beams' creep relaxes a jacked moment like every other restraint, so the jack must be two to three times the moment it cancels and is larger than the joint's cracking moment on either side; and a jack sized for one humidity is wrong by as much as the moment it removed at another. Held to what the joint can take uncracked, it cancels about half.

6 figures · End rotation
The small cycles take their mean from the overload just before them. The root's mean stress in the 100,000 cycles of ±40 N/mm² that follow each overload of a block — one of ±300 N/mm² nominal, then three of ±200 — at a notch of factor 3, for four ways the overloads can end. All in compression: 97, 72, 72, 72 N/mm²; all in tension: −97, −72, −72, −72; the ±300 in compression and the ±200s in tension: 97, −64, −64, −64; the reverse: −97, 64, 64, 64. Materials

The overload that is outvoted

A notch's small cycles run about whatever residual mean the last overload left at its root, so a single overload's direction can halve or double their life. A real history has overloads of several sizes, and it is tempting to think the largest one decides. It does not. The small cycles take their mean from the overload just before them, whatever its size, so in a block of one ±300 N/mm² overload and three of ±200, the three medium ones set three quarters of the small cycles' means. Over all sixteen ways the four can end, the life runs from 0.63 to 1.56 of a count by range, and the largest overload's direction leaves the ranges of the two halves overlapping. Every overload ending in compression and every one in tension are the bounds; no subset of the largest is.

6 figures · Stress concentration
Every member's stress range as the load crosses the uniform girder. The stress range in each post (at its worse corner) and in each panel's chords (at the worst of their four ends, axial force and moment together) of a Vierendeel girder of six 2 m panels, 1.5 m deep, every member at first of one section (I = 117 × 10⁶ mm⁴), crossed by a 100 kN load, along the span. The posts range 50, 78, 76, 76, 76, 78, 50 N/mm² from end to end; the chords 71, 92, 103, 103, 92, 71. The worst member is a middle chord at 102.8, the worst post 78.3. Structural form

The girder sized member by member

A Vierendeel girder's posts can be sized to the stress ranges a crossing load gives them, and the earlier essay found that this keeps the girder's fatigue life for a tenth less steel. With the chords counted too — their axial force and their bending together — the girder's worst member is not a post but a middle chord. Sizing every member to that one range takes a quarter of the steel out and keeps the life; the posts barely move when the chords are resized, and sizing the two in turn settles in four passes. Sized for strength instead, the same girder uses more steel and lives a third as long, and sized to a range a fifth below the worst it is lighter than the uniform girder and lives twice as long.

6 figures · Vierendeel