Which failure arrives first — page 23
The doubtful pier belongs in the middle of a pair
A viaduct's designer who knows which piers stand on poor ground can put a movement joint over each of them, and the joint helps: with either of two piers settling 40 mm, twelve spans grouped to put joints over them carry 315 kN·m where groups of three carry 367. Putting each doubtful pier in the middle of a two-span pair does far better, 230, because a pair's hogging is the thing a settling middle pier relieves. Under the full load, until its pier has sunk 35 mm, a pair is no worse than two simple spans, and it pays for that with the traffic envelope that groups of three were chosen for.
The silt a jet cannot reach
A basement held down by drains that silt up floats in the spring of year 24 if nobody touches them. Clean them every four years and it floats in year 104 — if a fifth of the silting is in places no jet reaches; in year 44 if half is. The cleaning interval barely matters beside that share, and the share is not knowable when the drains are laid. But it is measurable as soon as they are first cleaned: the standpipe read just after a cleaning sees only the silt that stayed, and its trend is the drains' life.
The overload whose last half decides
A notch that has yielded once is left holding a residual stress, and the small cycles that follow run about it. Which sign it has is set by which half of the overload came last: tension last leaves the root in compression, compression last in tension. The same overload, the same small cycles, the same rainflow count — and at a notch of factor three the small cycles' life differs by a factor of 2.4 between the two orders, by 3.8 at a factor of five. Taken at random, the orders do not cancel: the count by range alone overstates the life by a fifth where the small cycles do most of their damage.
The joint that hides its clamp in its loop
A friction joint loaded well below slip looks like a piece of solid steel, and the stiffness it shows a passing lorry has no clamp in it at all: a bolt at half its preload starts out exactly as stiff as one at full. The clamp is not in the stiffness but in the loop. Cycle the joint through a fifth of its slip load and the edge of each clamped patch slips a little, both ways, and the loop it traces is 0.17 µm wide at full preload and 0.40 at half. A proof load can read a joint's clamp, but only by its hysteresis, and only with a gauge good to a tenth of a micrometre.
The arm that calls for its own visit
An outrigger connected to a concrete building collects the core's and the columns' differential creep, and re-shimming its joint every few years lets that force go. Dates on a drawing are a guess at how fast the building will creep. A load cell in the joint replaces the guess: re-shim whenever it reads 1.40 MN and three visits, at one, four and twenty-three years, hold the arm there whatever the building does. A building that creeps 60 per cent more than predicted needs a fourth visit; the dated schedule lets it reach 2.30 MN. Holding a tenth of the wind takes eight visits, three in the first thirteen months, and a contractor who can come within weeks.
The pier that may rise belongs under a joint
A pier that may only settle is best put in the middle of a two-span pair, whose hogging a settlement relieves before it adds to anything. A pier on swelling clay, or over a culvert that may be relieved of its fill, may rise instead, and then the pair is the worst place for it: 40 mm of heave puts 459 kN·m into a pair that would have carried 230 for the same settlement. The place that is gentle both ways is the end of a group, under a movement joint. With the doubtful piers' movement known in size but not in sign, joints over them carry 335 kN·m where pairs carry 459 and groups of three 465 — and nothing with the same traffic envelope does better.
The plate the loose frame stops protecting
A cross-frame bolted through clearance holes does nothing until a lorry has distorted the box far enough to take up the hole, and among ring frames a millimetre is nearly the whole distortion a lorry produces. What that costs is not the frame's own life but the plates' around it. A tight frame holds the corner angle's range to 0.21 mrad over a few metres either side of itself; a millimetre of clearance lets it rise to 0.50, and a detail there loses a factor of thirteen in fatigue life. The box's worst place does not move, because it was never at the frame. The critical detail moves only if the frame's own detail is a worse category than the plain plate's, which it usually is.
The slab left to dry before the fill
A basement stem propped by its ground slab keeps the pressure the roller locked into its fill only while the slab still bears on it, and a slab cast four weeks before the fill shrinks away within sixteen months. Casting the slab first and letting it dry before the fill goes up sounds like the cure. Six months of drying buys four more years; a year keeps the slab touching the stem every summer for thirty. But a slab that touches only in summer gives back the propped moment only in summer, and in the tenth year a stem filled two years late still reaches 63 kN·m of its unpropped 70. The delay keeps the contact. It does not keep the design.
The ring the mass swings inside
A tall building's tuned mass is usually swung by the wind across one line, and an earthquake can arrive from any direction. If the mass runs on two tracks with stops on each, an earthquake at right angles to the wind's swing finds its whole stroke free: the wind costs nothing. If it hangs inside a ring of stops, the two strokes add as a vector and the ring is nearer than it looks. In a moderate earthquake across a wind that already swings the mass ±0.40 m of its ±0.50, the ring is struck 2.6 times a record against 0.5 between pairs and 8.0 along the wind's line. In a strong one the ring is struck more often across the wind than along it.
The loop that sees only the end bolts
A friction joint's hysteresis loop below slip carries its clamp in it, so a gauge across a splice reading a small loop could in principle tell a loose bolt from a tight one. In a row of six it can tell only some of them. The plates between the bolts share the load so that the two end bolts carry 38 kN of a 120 kN cycle and the middle two 7, and a loop's width goes as the square of a bolt's force: the end bolts draw the loop, the middle ones barely touch it. One end bolt at half its clamp nearly doubles the loop; the third bolt at half changes it by a third of a per cent. Forty rows of scattered clamps read their end bolts' mean with a correlation of 0.99 and their weakest bolt's with 0.51.
The joint born holding a moment
A continuity joint over a pier ends its first thirty years sagged or hogged by the beams' creep and the slab's shrinkage, by an amount the date of the pour decides. Jacking the beams' pier ends before the joint is cast lets it be born holding the opposite moment, so that the two cancel at thirty years. The arithmetic works for any slab date. The jack does not, for two reasons: the beams' creep relaxes a jacked moment like every other restraint, so the jack must be two to three times the moment it cancels and is larger than the joint's cracking moment on either side; and a jack sized for one humidity is wrong by as much as the moment it removed at another. Held to what the joint can take uncracked, it cancels about half.
The overload that is outvoted
A notch's small cycles run about whatever residual mean the last overload left at its root, so a single overload's direction can halve or double their life. A real history has overloads of several sizes, and it is tempting to think the largest one decides. It does not. The small cycles take their mean from the overload just before them, whatever its size, so in a block of one ±300 N/mm² overload and three of ±200, the three medium ones set three quarters of the small cycles' means. Over all sixteen ways the four can end, the life runs from 0.63 to 1.56 of a count by range, and the largest overload's direction leaves the ranges of the two halves overlapping. Every overload ending in compression and every one in tension are the bounds; no subset of the largest is.
The girder sized member by member
A Vierendeel girder's posts can be sized to the stress ranges a crossing load gives them, and the earlier essay found that this keeps the girder's fatigue life for a tenth less steel. With the chords counted too — their axial force and their bending together — the girder's worst member is not a post but a middle chord. Sizing every member to that one range takes a quarter of the steel out and keeps the life; the posts barely move when the chords are resized, and sizing the two in turn settles in four passes. Sized for strength instead, the same girder uses more steel and lives a third as long, and sized to a range a fifth below the worst it is lighter than the uniform girder and lives twice as long.