Plastic moment — where it appears
Named by 15 essays across 6 fields — each of them below, with the objects they name alongside it.
After the first yield, which is not the end
A steel beam whose extreme fibre has reached yield has not failed. It has started forming a hinge, and collapse waits until there are enough hinges to make a mechanism.
Bending is a pair of forces, pushing and pulling
A bending moment is not a mysterious twisting. It is a push near the top of a section and a pull near the bottom, separated by a lever arm — a couple, made out of stress.
The section that yields from the outside in
A rectangle has half again as much moment in reserve past first yield as its elastic capacity suggests, and an I-section has a seventh. Read as a ranking that gets it backwards — the reserve is bought with curvature, and the rectangle pays four times as much of it.
Two ways to fail, and the curve between them
A column carrying both compression and bending has two capacities and a rule for sharing them out. The rule is a straight line, the truth is a curve, and for a rectangle the straight line gives away a quarter of the plastic moment at half the squash load.
The moment that was moved on purpose
The elastic analysis of a continuous beam gives one set of moments. It is not the only set the beam is allowed to have, and taking a smaller one at the support is legal, cheaper, and paid for in a rotation that has to be delivered before the design exists.
The part that is meant to be weak
A braced frame is stiff and has nowhere to yield. A moment frame yields everywhere and is soft. Move the two diagonals a metre apart along the beam and the whole storey shear has to pass through the segment between them — which keeps most of the stiffness and puts every yielding in one member the designer chose.
Two ways of being wrong
Plastic analysis has two theorems and they point in opposite directions. Any equilibrium field that nowhere exceeds the plastic moment gives a load at or below the collapse load; any mechanism gives one at or above it. Only one of those errors is safe.
The answer is continuous and the catalogue is not
Every optimisation in this subject returns a number with three significant figures in it, and nothing with three significant figures can be bought. What can be bought is a rolled series whose steps are a quarter to a half apart, so the member that goes on the drawing is on average a tenth stronger than the one that was calculated and can be a third stronger for no reason at all.
Twice the moment, four times the brace
A lateral brace has to be on the right flange and its demand is very nearly linear in the load. A torsional brace has no flange to be wrong about, and its demand is exactly quadratic — so the restraint that is indifferent to where it is attached is the one that gets expensive fastest.
Four corners and a mechanism
The check on a hole in a web adds an axial stress to a local bending stress and compares the sum with the yield stress at one corner. What ends the opening is four hinges arriving together — and the gap between the two is a factor that varies along the span from two and a half to exactly one.
The face that dents and the core that crushes
A sandwich panel carries bending as a couple between its faces, and that is a calculation about the whole panel. Put a local load on one face — a foot, a fixing, a dropped tool — and the face becomes a thin beam on a soft bed, spreading the load over a length the fourth root of their stiffnesses sets. Then either the face yields and dents, or the core crushes beneath it, and which comes first is decided by one thickness: below it the face gives, above it the core does, and a steel-faced roof panel is on the wrong side of it for anyone who walks on it.
The slip the plastic moment asks of the studs
A composite beam with half the studs that full interaction needs still has 85 per cent of the full plastic moment, because the slab's compression block simply gets thinner and the steel finds its own neutral axis. That is the stress-block answer, and it assumes every stud slips as far as the beam asks. Follow the slip along the beam and the end studs of a 12 m beam need 6.6 mm to reach nine tenths of that moment and 9 mm to reach 95 per cent — past the 6 mm a stud is trusted to give. Require 6 mm and the Eurocode's minimum degree of shear connection comes out of the arithmetic, slope and all.
The hinge a squeezed section has to work for
Unloaded, a rectangle carries half again its first-yield moment once it is fully plastic and an I-section only a little more, and the I-section gets there almost at once while the rectangle has to bend four times further. Put a column's axial load on them and both rankings move. The rectangle's reserve grows as 1.5(1 + n), to nearly three times its first-yield moment under heavy compression; the I-section's barely moves. And the I-section loses the thing that made it the beam everyone uses: under three-fifths of its squash load it needs more than five times the curvature to develop its plastic moment that it needs as a beam, because the compression has yielded its web before any bending began.
The hinge squeezed while it turns
The leeward column of a frame overturning in an earthquake gains compression as its base hinge rotates. Followed fibre by fibre, with every fibre's plastic strain remembered, the hinge does neither of the things the constant-load curves suggest. It forms early, at the low load it started with, and then rides down the section's plastic moment as the load rises: an I-section whose compression goes from a tenth to six-tenths of its squash load holds 0.86 of its unloaded plastic moment at twice its first-yield curvature and 0.43 at twelve times it. The steel never softens, and the hinge still has a falling branch, set by statics. The relieved column on the other side gains what this one loses, less the curvature of the interaction curve.
The section stronger for being cut
Take a square bar standing on its corner, and saw a ninth off its top and bottom tips. It has lost material from the places where material does most for bending, and its first-yield moment has gone up by 5.35 per cent. Nothing has gone wrong with the arithmetic. The bar's plastic moment has gone down in the same cut, and at every curvature the whole bar still carries more than the cut one. What the cut exposes is that a first-yield moment was never a measure of how much a section can hold. It is a measure of how far its furthest fibre stands out.
Named alongside it
The objects these essays reach for when they reach for this one.
Plastic hingeDuctilityShape factorCollapse mechanismSection modulusMoment-curvatureMoment redistributionNeutral axisRotation capacitySquash loadAxial forceBeam-column