Modular ratio — where it appears
Named by 7 essays across 3 fields — each of them below, with the objects they name alongside it.
When half the section has given up
Bending theory puts the neutral axis through the centroid. That is a consequence, not a rule — and when the tension side cracks, the same reasoning moves the axis somewhere else entirely.
The deflection that arrives three years late
A concrete beam that passes every check on the day it is built goes on deflecting for a decade, and ends up three times where it started. Nothing about the load changed, and nothing about the strength was ever in question.
A section made of two materials, one of them pretended away
Multiplying a material's width by the ratio of the moduli produces a fictitious section of one material with the right neutral axis and the right forces. It is not a trick — it is compatibility and Hooke's law written down — and it says a stiff material takes what its modulus asks for.
The section that changed while it was being loaded
A stress is computed from a moment and a section modulus. When part of the moment arrived while the section was a different shape, there is no single section modulus to divide by — the stresses add and the properties do not, and two identical finished beams can differ by half again in stress with nothing on the drawing to say which is which.
Where the steel is, not how much of it
A section in bending resists a moment with a couple, and a couple is a force times a distance. The force is bought — it is an area of steel at a stress. The distance is free, decided by where the bars were put, and it is the variable almost nobody optimises because it does not appear on an order.
The curvature nobody applied
Concrete shrinks as it dries, by about half a millimetre in every metre. In a symmetrically reinforced member that is a shortening and nothing else. In a member with more steel in one face than the other — which is every beam and every slab — the steel holds one side back and the section bends, with no load on it at all.
The deck that cracks over the pier
Over the pier of a continuous composite bridge the concrete deck is in tension and cracks, and what is left of it is a grid of bars and struts. Shear lag does not stop at the cracks: the bars still receive their force through the concrete between them. Whether the cracked deck works over a narrower width than the whole one depends on one ratio, the deck's shear stiffness over its axial stiffness — and once the concrete has cracked, both of those come from the reinforcement, so the answer is set by how the bars are arranged.
Named alongside it
The objects these essays reach for when they reach for this one.
Cracked sectionCreepComposite actionNeutral axisPlane sectionsSecond moment of areaTransformed sectionCamberDeflectionDifferential shorteningElastic modulusLever arm