Concept

Impact factor — where it appears

A multiplier applied to a static load to stand in for the dynamic response it will actually produce. It is a way of not solving the dynamics, and it is right only when the load's duration compares with the structure's period in the way the factor assumed.

Named by 10 essays across 3 fields — each of them below, with the objects they name alongside it.

20 kN applied at once and held, on a structure of 0.500 s period. Displacement against time for a single-degree-of-freedom structure of natural period 0.500 s and 2.0% damping, under 20 kN applied at once and held. The static deflection under the same peak force is 12.67 mm and the peak response is 24.56 mm — a factor of 1.94.

Twice the deflection, for the same load

A weight placed gently on a beam deflects it by one amount. The same weight let go from rest, a millimetre above the same beam, deflects it by twice as much — and the factor of two is exact, for every structure ever built.

dynamics · Dynamic amplification
What a drop height is worth, as a factor on the answer for a weight placed slowly. The peak displacement as a multiple of the static deflection, against the height a weight is dropped from divided by the deflection that weight causes when it is placed. The curve is 1 + √(1 + 2h/δ), which is conservation of energy and nothing else: the weight does work over the height it falls PLUS the distance the structure then gives, and the structure stores work only over the second. At a ratio of 40 the factor is 10.00, and at zero it is exactly 2 — the marked point, where a dropped weight becomes a placed one.

The weight that was dropped

A half-tonne load lowered onto a beam produces 5 kN. The same load dropped one metre onto the same beam produces 160 kN — and onto a beam ten times softer, 54 kN. The stiff structure is the one that suffers, which is the opposite of nearly every other rule about structures.

dynamics · Impact factor
The worst speed is not the fastest one. Peak deck acceleration against train speed, for a 20 m span at 6.25 Hz under 10 axles 18 m apart. The spikes are not a numerical artefact and they are not about how heavy the axles are: a regularly spaced train is a forcing function with a frequency v/d, and where a multiple of it lands on the bridge's own frequency each coach arrives in step with the motion the last one left. The arithmetic is v = d·f₁/k, which puts peaks at 405, 203, 135, 101 km/h — all of them operating speeds. What fails first is the acceleration rather than any stress: ballast loses its interlock at about 3.5 m/s², and strength does not appear in the equation at all. Here the limit is first passed at 376 km/h.

The train that arrives in time with itself

A single load crossing a span is a mild problem. A train is not one load — its axles are regularly spaced, so the forcing has a frequency of its own, and where a multiple of it lands on the bridge's frequency each coach arrives exactly in step with the motion the last one left behind.

dynamics · Moving load resonance
The force nobody applied, and the speed it wins at. Lateral force per unit weight for a vehicle on a 400 m curve, against speed. The rising curve is what the free body demands — v²/gR, which is the body's own acceleration written on the other side of the equation — and the flat line is what 6.0° of cant supplies from the weight. They cross at 73 km/h, which is the speed the curve was set out for; below it the deficiency has the other sign and the rail is pushed the other way. The upper line is overturning, at b/2h = 0.399 — and there is no mass in that number, so a loaded vehicle and an empty one go over at the same 160 km/h and only the height of the load decides. At the 108 km/h drawn the deficiency is 0.124 of the weight, which is 49 kN on this 40 tonne vehicle.

The force that is really an acceleration

Every other load in this collection is applied by something. This one is applied by nothing at all — it is the body's own acceleration, written on the other side of the equation so that statics can be used on a problem statics has no business with. The move is legitimate, it is a hundred and eighty years old, and it is exactly half done more often than it is done.

equilibrium · Centrifugal load
The resonance that ran out of time. The response of a 0.100 s oscillator at 2.0% damping while the driving frequency sweeps up through its own, plotted against the driving frequency rather than against time. The steady-state amplification is 1/2ζ = 25; this sweep reaches 23.6, which is 95% of it, because the time spent inside the half-power band is a limited number of build-up time constants. The whole answer depends on one group, β/ζ²ω², and over the range this figure's sibling sweeps the fraction falls from 100% to 41%. Two features fall out of the integration and neither is guessable from the steady-state picture: the peak arrives after the frequency has passed resonance, by 1.2% of it here, and the response beats afterwards at the difference between the two frequencies. A machine's instrument therefore reads its largest amplitude while it is already above its critical speed.

The resonance that ran out of time

A resonance amplifies by one over twice the damping, which for a lightly damped structure is fifty or a hundred. That is a steady-state answer and it takes time to arrive — with a time constant containing the same small damping — so nothing that sweeps through a resonance ever collects all of it, and past a certain rate the peak reached stops depending on the damping at all.

dynamics · Transient resonance
One collision, four contact laws, one impulse. Contact force against time for one collision between 500 t and 300 t closing at 1.94 m/s, under four contact laws sharing one contact constant of 2.8×10^9 N/m^1.5. The elastic linear spring peaks at 19.7 MN and lasts 58 ms; the Hertz law peaks at 22.0 MN over 61 ms. Set to a restitution of 0.65, the spring and dashpot peaks at 16.8 MN and ends pulling at 3.5 MN, a tension two faces in contact cannot carry, while the damped Hertz law peaks at 20.1 MN and returns a restitution of 0.77 instead. The areas under the curves are the impulses: 600 kN·s for the spring and dashpot, which is what momentum requires at 0.65, 646 for the damped Hertz law, and 727 for both elastic laws.

The force that belongs to the model

When two buildings meet, momentum decides what each of them feels, and no contact law can change it. What the contact law decides is the force, and the force it reports is the contact stiffness somebody assumed, raised to a power. Four laws and a hundredfold change of stiffness move the buildings by a few per cent and the force by a factor of eight.

dynamics · Pounding
The force climbs back to the elastic one. The peak force of each of 40 drops of a 500 kg weight dropped 1.0 m onto a structure whose stiffness gives it 2.0 mm of static deflection under the weight, onto a structure yielding at 80 kN — half the 160 kN an elastic structure takes (dotted). Perfectly plastic, every drop peaks at 80 kN and the saving holds, at the price of the ratchet. Hardening at 2 per cent, the peak climbs drop by drop: 82 kN at the first, 91 at the fifth, 131 at the 40th; hardening at 5 per cent, the peak climbs drop by drop: 86 kN at the first, 104 at the fifth, 152 at the 40th. A hardening structure ends up carrying almost the elastic force it was made weaker to avoid.

The same weight, dropped again

A structure allowed to yield under a falling weight needs only a fraction of the strength an elastic one needs — half of it for a ductility of two and a half — because the energy goes into bending the steel rather than into force. That is the whole saving, and it is spent on the first drop. Drop the same weight again and the structure yields again: a perfectly plastic one adds the same permanent set every time and never stops, and a hardening one stops only when it has stiffened itself back up to nearly the elastic force it was made weaker to avoid, after moving more than half a metre.

dynamics · Impact factor
On the road the beam's top fibre has nothing left. The top fibre along the 12 m pretensioned beam, 300 × 700 mm, with eight strands, its schedule drawn for the bed and for yard bearers 1.0 m in from each end, the worst of the two bounces at each section: on its yard bearers standing still and bouncing ±30 per cent, and on a trailer carrying it 1.5 m from its front end and 2.5 m from its rear standing still and bouncing; dotted, the yard's limit of −3.0 N/mm². Yard bearers, still, −2.98 at 2.0 m; yard bearers, ±30 per cent, −3.26 at 9.8 m; trailer, still, −4.68 at 9.5 m; trailer, ±30 per cent, −4.88 at 9.5 m.

The beam the haulier holds

A pretensioned beam leaves the yard on a trailer, carried on a turntable and a bogie the haulier places, and bounced on them at road speed. The bounce works both ways: a wheel rising adds to the beam's weight over its overhangs, and a wheel falling away takes weight off — and with it the sag that was relieving the beam's top fibre between its supports. On the yard's own bearers a bounce of 30 per cent takes as much from that fibre as a stack placed 100 mm out of line. A rear overhang of 2.5 m takes five times as much. With the yard's schedule, a trailer may hold this beam only within half a metre and three quarters of a metre of its ends.

sections · Prestress limits
The road is the harshest stretch of the beam's journey. The worst top fibre, at any corner of any section, of the 12 m pretensioned beam, 300 × 700 mm, with eight strands, its schedule drawn for the bed and for yard bearers 1.0 m in from each end, in N/mm² with tension negative: on the yard's bearers; on the haulier's trailer, 1.5 m and 2.5 m from its ends with a bounce of ±30 per cent; lifted by loops 1.0 m in from each end on slings at 60° with a snatch of ±20 per cent; slewed at 0.10 g; and set down on bearings sloping 1 per cent across it; dashed, the stored concrete's limit of −3.0. Yard bearers, −2.98; trailer, −4.88; lifted, −2.97; slewed, −3.13; set down, −1.79.

The beam hung from its loops

A pretensioned beam is cast in a bed, stored on bearers, hauled on a trailer and then lifted by a crane onto its bearings — and at every stage its top fibre, which the strands put in tension, has to stay inside the limit its debonding schedule was drawn for. The trailer, with a bouncing wheel and supports where the haulier put them, was the harshest stage the yard essays found. The last few metres, from the trailer to the bearings, are gentler: hung from loops at the yard's bearer positions the beam is on its bearers again, set down it is on the support its middle was designed for, and only a slew of the crane pushes it a little past its limit. Where the loops are cast decides how much margin the lift has, and the best place for them is not where the yard put its bearers but where the bed held the beam: at its ends.

sections · Prestress limits
Spread over the span, the rotation gathers at the supports every drop shares. The plastic rotation each station of a 6 m beam fixed at both ends (EI 42,000 kN·m², plastic moment 200 kN·m) struck 20 times by a weight of 4.9 kJ has gathered by the last drop, for drops always at mid-span, at 0.3 and 0.7 of the span in turn, and at random. Always at mid-span, the worst station holds 0.193 radians, at 3.0 m, and 3 stations more than a milliradian; at 0.3 and 0.7 in turn, the worst station holds 0.104 radians, at a support, and 4 stations more than a milliradian; at random, the worst station holds 0.128 radians, at a support, and 15 stations more than a milliradian.

The weight that lands somewhere else

A beam that yields under a falling weight takes a permanent set from every drop, and if the weight always lands in the same place the set grows by the same amount every time. Let the weight land somewhere different each time — rocks on a canopy, crates on a deck — and the set still grows: the weight's energy fixes how much plastic work every drop does, wherever it lands. What the landing point decides is where the work goes. Half of every drop's hinge rotation goes under the weight and half to the supports, so wandering drops spread the first half along the span and leave the second half where it always was: the worst hinge turns half as fast, and it is at a support.

dynamics · Impact factor

Named alongside it

The objects these essays reach for when they reach for this one.

Dynamic amplificationDampingFree bodyImpulseNatural periodCantileverConservation of energyDebondingDuctilityEquilibriumModal massMoving load resonance

All concepts