Bolt group — where it appears
Named by 24 essays across 3 fields — each of them below, with the objects they name alongside it.
The connection is not a point, and every diagram so far says it is
Every free body drawn here has joined its members at points. Real structures fail at the joints far more often than in the members, and the reason is that a joint is exactly the region the theory behind every other page explicitly excludes.
The bolt that carries more than its share
Six bolts, one hundred kilonewtons, and a worst bolt carrying fifty. The load is shared equally and the torque is not, and the second one is invisible on any drawing where the connection is a point.
The tear that goes diagonally, and the correction that has no derivation
Stagger the holes so that no straight line crosses more than one and the plate does not get its strength back. The tear runs at an angle instead, and the arithmetic that makes it come out right is a century-old piece of curve-fitting nobody has improved on.
The hole that goes oval, and the one that tears to the edge
A bolt pressing on the side of its hole either crushes the plate in front of it or shoves a channel of metal out to the end. Which one happens is decided entirely by a distance that is usually set by a minimum in a table.
Moving a force, and what it costs
Every free body begins by putting a force somewhere convenient. That move is free along the force's own line, costs a couple across it, and in three dimensions leaves behind something no choice of point can remove.
The bolts that do not share
Every bolted connection in this collection has divided a force by a number of bolts. That is right for a short joint and wrong for a long one, and the reason has nothing to do with the bolts — it is that the plates they join are elastic, and stretch by different amounts at different points along the lap.
The joint that has to be as good as the member
A splice exists because members come in lengths and structures do not. It has to deliver the same force, at the same stiffness, in the same distribution across the section, through a discontinuity — and each of those three requirements is met by a different feature of the detail, with the third one usually left to look after itself.
Nine piles, and four times the settlement
A pile cap divides its load between its piles by the same three terms a bolt group uses and a section under biaxial bending uses. What a bolt group does not have is neighbours it shares ground with — and the group effect that matters is not the strength check everybody makes, but a stiffness effect nobody tabulates.
The joint that is crooked by construction
Lap two plates and fasten them and the two load paths are offset by the thickness of a plate. The joint carries a moment nobody applied, the peak stress is four times the mean, and the rotation that is supposed to straighten it out saves eleven per cent — because the rescue works for thin sheet with a long lap and a bolted structural joint is neither.
The radius rule, and where it fails
A weld group under an eccentric load is checked at the point furthest from its centroid, on the reasoning that the stress from the twist grows with the radius. That reasoning ignores the direction the two stresses point in, and for one common shape it misses the peak by nine per cent.
The eccentricity at right angles to the drawing
A bracket's load stands off the plane of its welds as well as being offset within it, and the second eccentricity produces a completely different object — bending about an axis through the group rather than torsion about a point in it. The weld line has no compression zone to argue about, so its neutral axis is its own centroid, and the whole length works.
Two fasteners that never arrive together
Every steel code forbids adding a weld's capacity to a bolt's in one shear joint, and states it as a rule rather than deriving it. It is derivable. Two fasteners in parallel are at the same displacement rather than the same force, and a weld has ruptured at four tenths of a millimetre while a bolt in a standard hole has not yet touched the side of it.
The bolt group has no neutral axis
A bolt group carrying a moment about an axis in its own plane has some bolts in tension and something in compression somewhere else. Where that somewhere else is decides the answer, nothing in the group decides it, and the two defensible choices give the worst bolt 50 kilonewtons and 21.
The bracket pushed from the wrong side
A six-bolt bracket checked for a load straight down carries 198.5 kN. Push the same load through the same point at 138 degrees and it carries 135.8 — the direction changes the torque as well as the shear, and the worst direction is one no drawing shows. The capacity of a group whose load can turn is a closed curve, the bolt that governs it changes as the load turns, and what the curve rewards is not a larger polar moment but a smaller distance to the furthest bolt.
The better method flatters the worse layout
The instantaneous centre method finds capacity the elastic method cannot see, and how much it finds depends on the layout it is applied to. On a six-bolt rectangle under a load of unknown direction it is worth 24 per cent; on a ring of six with a smaller polar moment it is worth 14. The two methods agree on which layout to choose and disagree by a factor of five about the margin — and the reason is that a layout the elastic method already likes is one with nothing left to redistribute.
The bolt that was never fitted
A six-bolt bracket found with five bolts in it has lost a sixth of its fasteners and between four and thirty-four per cent of its capacity, depending which one is missing. The share is the smallest of the three things that changed: the centroid moves away from the gap, which lengthens the load's own lever arm, and the polar moment falls by more than the count does. The bolt whose absence costs most is not the bolt that governed the check.
The strongest layout leans on one bolt
Search a plate for the six bolt positions that carry most and the answer carries 234 kN — and loses 36 per cent of it if one particular bolt is missing. Move that one bolt fifty millimetres, into the corner the optimum had just left, and the group carries 232 kN and loses 25 per cent whichever bolt goes. Robustness here costs one per cent of strength, and a search for strength alone will never find it.
The bracket with no worst bolt
A bracket that stands out from its column is pulled off the column by the same load that twists it in its plane, so every bolt carries shear and tension at once. Straight down, one corner bolt is worst at both and the check is that bolt's. Tilt the load and the most sheared bolt and the most pulled bolt come apart; the one that fails is whichever of them its interaction reaches first, and at the angle where they swap the group has two worst bolts and no single one.
The thinner cover carries more
A plate spliced with a cover on each face is the standard cure for a lap joint's eccentricity, and the covers are usually sized as if they shared the load in proportion to their areas. A free body cut across the splice says otherwise. With nothing but the two covers crossing the cut, their forces must balance about the line the load acts on, so they share by lever arm and not by area — and the thinner cover, which sits nearer that line, carries more than half the load on less than half the steel.
The splice that bends as one section
A plate spliced with two unequal covers shares its load by lever arm about the line the load is held on, and the thinner cover carries more. A beam's flange splice looks like the same joint, and the rule that worked for the plate puts the thin inner covers at the edge of yield. They are working at half that. A beam's halves are not held on any line; they turn, and every splice plate across the gap turns with them, so the plates bend as one section and share the beam's moment by their distances from its neutral axis. The outer cover works hardest, the inner covers less, and the web plates less than the hand design hands them.
The worst direction is an eigenvector
A bracket whose load can come from any direction in the plane of its bolts has a capacity that is a closed curve, and once the load also pulls the bracket off its column the curve becomes a surface over direction and distance. Finding its lowest point looks like a search. Under the elliptical interaction of shear and tension it is not: inside each quarter-turn of directions every bolt's demand squared is a quadratic form in the load's direction, so the worst direction is that form's eigenvector, and the bracket's least capacity is a 2 × 2 eigenvalue per bolt. Under the straight line EN 1993-1-8 prints it is a search, because a straight line has no curvature to make an ellipse of — and the hand check that sets the worst shear anywhere against the worst tension anywhere is a tenth too low in the plane and a fifth too low once the bracket is pulled.
The splice that finds its own axis
Splice a girder whose top flange is heavier than its bottom one and the splice plates, sized flange by flange, have a centroid 48 mm below the girder's. It looks as if the splice must then carry an axial force the girder does not, or be proportioned to keep the two axes together. It carries none: a cut through the gap carries what the girder carries, and the girder carries no force. Held at both ends, the mismatch makes less than a kilonewton. What the offset does instead is move the web's own force into plates that were not sized for it.
The bolts that arrive one at a time
A bearing bolt sits in a hole two millimetres bigger than itself, so a group of them is not in contact until the plates have moved, and each bolt reaches its hole at a different moment. Every calculation then shares the load equally. That is nearly right at failure and wrong on the way there, and what repairs it is a property nobody writes on the drawing: how far a bolt can travel before it breaks.
The loop that sees only the end bolts
A friction joint's hysteresis loop below slip carries its clamp in it, so a gauge across a splice reading a small loop could in principle tell a loose bolt from a tight one. In a row of six it can tell only some of them. The plates between the bolts share the load so that the two end bolts carry 38 kN of a 120 kN cycle and the middle two 7, and a loop's width goes as the square of a bolt's force: the end bolts draw the loop, the middle ones barely touch it. One end bolt at half its clamp nearly doubles the loop; the third bolt at half changes it by a third of a per cent. Forty rows of scattered clamps read their end bolts' mean with a correlation of 0.99 and their weakest bolt's with 0.51.
Named alongside it
The objects these essays reach for when they reach for this one.
EccentricityConnectionBearingElastic methodFree bodyDuctilityLever armLoad pathPolar momentLoad directionPlastic redistributionBolt tension