Amplification — where it appears
Named by 14 essays across 4 fields — each of them below, with the objects they name alongside it.
The column that fails years later
A concrete column under sustained load goes on straining at constant stress, so its deflection grows — and because the second-order moment is the load times that deflection, the demand grows with it. There is a load below which the two settle and one above which they never do.
The stiffness the load takes away
Buckling is usually taught as an event — a critical load, a bifurcation, a mode. Written as a matrix it stops being an event at all. A compressive load subtracts a stiffness from the structure, the subtraction grows with the load, and the critical load is simply where what is left reaches zero.
The ground has a period of its own
An earthquake is measured on rock and felt on soil, and between the two is a layer that behaves exactly like a structure — a column fixed at bedrock, free at the surface, with a fundamental period of four times its depth over its shear wave velocity and a set of odd harmonics above it. The motion a building receives is the rock motion through that filter, and the filter is sharp.
The spectrum a floor hands on
Most of what breaks in an earthquake is not the structure. It is a transformer, a chiller, a rack, a ceiling, a pipe — and every one of them is bolted to a floor rather than to the ground. The motion it feels has already been through a filter with one very sharp tooth in it.
Counted, not checked
A column with pinned ends and no bracing cannot buckle on its own, so nothing about it fails a stability check. It still carries load, and load with no stiffness attached lowers the buckling load of everything around it — which is why a gravity-only column is put on the frame model and never designed by itself.
The lacing decides the force it has to carry
A perfectly straight column carries no shear, so the diagonals of a built-up column are resisting a force that exists only because the column is crooked. Computing it turns out to be circular — the shear is amplified by the very flexibility the lacing supplies — and the rule of thumb that replaces the calculation is wrong by a factor that grows as the lacing gets worse.
What the frames hold is the bow
A row of U-frames is sized for a force, and the rules give that force as a percentage of the compression chord's force that nobody derives. Derived, it is not a property of the frames at all. It is the chord's initial bow, grown by how near the chord works to buckling — and it is least, not greatest, near the stiffness at which the chord stops using the frames. Stiff frames tend to a limit that is π²/500 of the chord force: the familiar two per cent, arriving from a bow of one five-hundredth.
The bound from underneath
Rayleigh's quotient turns a guessed shape into a buckling load that is always too high. Divide the same guess differently — use the curvature its bending moment would cause instead of its own — and a parabola that was 21.6 per cent high is 1.3 per cent high. Add one more number that needs no guess at all and the load is caught from below as well, which is the only side of it an amplifier can safely use.
The weight that bends a rib it cannot bend
A parabolic rib carries its own uniform dead load as pure thrust, with no bending in it at all. Put a live load on half the span and the rib bends in the shape of its own buckling mode from the first kilonewton, and the whole thrust, most of it from the dead load, multiplies that bending. The rib never reaches its buckling load. It yields well short of it, at a load its first-order check says it can carry.
The frames the deck pushes first
A half-through girder's U-frames are the ends of the cross-girders that carry its deck. Load the deck and every cross-girder sags, its ends rotate, and every frame's foot swings inward by millimetres before the compression chord has asked the frames for anything. It looks like a second imperfection on top of the chord's bow. It is a much weaker one: the frames all move together and the chord simply goes with them, so a 7.5 mm push adds 1.4 kN to frames that the bow loads with 13.6, and stiffer frames make it smaller, not larger. What the push leaves is mostly in the frames' own members, not in what they ask of the chord.
The roof that drains towards its sag
The depth of water a ponding check takes as given is set by the drainage: an overflow's height above the roof, plus the head a storm needs to leave through it. Which head a roof can carry depends less on how stiff it is than on where the overflow sits. With the level fixed by a scupper in the parapet, a 12 by 9 m bay allows 85 mm of water and an 18 m square bay 39. With a drain at the middle of the bay, whose inlet goes down as the roof sags, the same bays allow 182 and 205 mm — more than a rigid roof would — because the water's surface follows the sag down instead of filling it.
The braces with slack in their bolts
A cross-frame bolted into clearance holes resists nothing until the girder it braces has twisted far enough to take up the clearance, and then resists fully. It is a two-way brace that starts late. The girder, erected a little crooked, twists freely into its braces while the load is still small, and from then on the braces hold a girder that is more crooked than the one they were fitted to. The slack acts as an imperfection, and a costly one: each milliradian of it adds more to the middle brace's force than a milliradian of extra crookedness would, and no stiffness takes it back out. On a 24 m plate girder braced at twice the stiffness it needs, three milliradians of slack — a pair of ordinary clearances over its depth — raise the middle brace's force by 70 per cent.
The drain that is mostly blocked
A roof's ponding check is made with its primary drains blocked, and a drain is seldom blocked outright: leaves and gravel choke it to a fraction of its flow. A fraction turns out to be nearly enough. On a 12 by 9 m bay sized to L/240, a drain passing a seventh of its clear flow still takes the whole of a 150 mm/h storm, because the water standing over it at the bottom of the sag is the bay's own deflection plus the level. A softer roof's drain works harder still. Only near complete blockage does the scupper take over, and only there does stiffness help.
The roof that makes the wind worse every storm
A portal frame's shakedown check is made on its elastic moments, and the elastic moments a heavy roof sways are larger than first-order analysis says: each storm's wind is amplified by 1/(1 − N/Ncr), on its way out and on its way back. On pinned bases under a 1,000 kN roof that takes the wind at which the knees start to alternate from 110 kN down to 90, and the shakedown load down by 4.8 per cent where gravity leads and 8.4 where the wind does. Fixed bases are worth more under a heavy roof than without one, but by half again, not twice.
Named alongside it
The objects these essays reach for when they reach for this one.
ImperfectionSecond-orderBucklingBracingCritical loadLoad pathMode shapeServiceabilityStabilityContinuous restraintCreepDamping