The most dangerous day is before it is finished
A structure is analysed once, complete, with every restraint present. It spends weeks in states nobody drew — a beam landed with no deck on it holds 17% of the moment its section is worth, a frame not yet braced buckles at a third of the load it will, and a bolt not yet tightened is a pin where the analysis assumed a fixity.
Two motions with one name
A tall building's sway is two movements added. A frame racks like a stack of parallelograms, worst at the bottom; a cantilever bends about its base, worst at the top. The total at roof level says nothing about which storey is worst, and on this building it is neither.
Named alongside it
The objects these essays reach for when they reach for this one.
Bending stiffnessBracingCantilever actionCladdingConstruction sequenceDeflected shapeDriftEffective lengthErection stabilityJoint stiffnessLateral restraintLateral system