The strength that belongs to the test programme
A characteristic strength is a fractile of a distribution, and a distribution estimated from four specimens is not the same object as one known exactly. The same material tested four times reports a strength 15 per cent below what it reports when its scatter is known — and nothing about the material differs.
The strength three cores revise
A characteristic strength estimated from three specimens and nothing else is heavily penalised, because three results cannot say how scattered a material is. An existing structure is never nothing else. It was built to a specified grade, from a population of concretes whose scatter is known in general, and three cores drilled from it revise that knowledge rather than replace it. Together they give a characteristic strength that three cores alone would need twenty to match. The same arithmetic catches a concrete much weaker than its specification, because cores that disagree with the prior widen it — unless the prior is given so much weight that it no longer listens.
The cores that agree for the wrong reason
Three cores drilled a metre apart in one slab share a pour, a curing and a morning's water, so they agree with each other more closely than they agree with the rest of the building. Counted as three independent specimens, they overstate what is known — and with nothing else to go on, the estimate built on them leaves a quarter of the building's concrete below a value meant to leave a twentieth. Counting them by their correlation repairs that. But once the specification is in the update, the honest count hands the estimate back to the specification, and a concrete weaker than it was meant to be hides behind it. The repair is not in the arithmetic. It is in where the cores are drilled.
The wrench that reads the rust
The obvious check on a preloaded joint that has been in service for years is a wrench on the nut, and it measures the wrong thing. The nut holds against the bolt's tension times a friction bracket, and twenty years of rust raise the bracket until a bolt with half its preload passes four times in five. The washer that could have said more remembers only the day it was crushed.
The survey that arrives after the floors
A tall building's lower storeys start shortening months before its upper floors are cast, so a survey every ten floors should tell the creep the building really has and let the floors still to come be set for it. It does tell it, to a millimetre's precision, after the twenty-fifth floor. By then most of the floors whose height it was meant to correct are already set, and the floor that ends furthest from level is the one no survey can help.