Fractile — where it appears
Named by 10 essays across 2 fields — each of them below, with the objects they name alongside it.
The strength no specimen had
A material property is written into a calculation as a number, and a material does not have one. It has a population of strengths with a mean and a spread, and the number used is a low fractile of that population — a value that need not have been measured, that most of the material exceeds, and whose distance below the mean is decided entirely by the scatter.
The load that is never all there at once
A column at the bottom of twenty storeys is designed for the imposed load of twenty floors added up, and twenty floors do not reach their own worst day together. The reduction that follows is not a discount on the safety margin. It is the central limit theorem, and it has a floor it never goes below.
The strength that belongs to the test programme
A characteristic strength is a fractile of a distribution, and a distribution estimated from four specimens is not the same object as one known exactly. The same material tested four times reports a strength 15 per cent below what it reports when its scatter is known — and nothing about the material differs.
The floors that fill up together
A column may be designed for less than the sum of its floors' imposed loads because the floors do not reach their worst day together — an argument that assumes each floor's load is independent of every other's. Let any two floors be correlated, and the reduction the averaging can pay for shrinks, and stops shrinking at a higher floor. At a correlation of 0.16 that floor reaches the 0.7 the storey rule falls to. One tenant on five floors halves what twenty floors can average away.
The load that stays and the load that visits
An office floor's imposed load is two loads: a sustained one that arrives with a tenant and stays until the next, and intermittent ones — a party, a move, a crowd — that visit one floor for a few days. Simulated over fifty years, a floor's characteristic load is set mostly by its worst visit, and visits on different floors almost never coincide. So twenty floors let one by one need only 0.27 of their summed loads, in tenancies of five 0.37 and to one tenant 0.60, against the storey rule's 0.73. The rule is safe for offices by a wide margin. It stops being safe only where the load stays — an archive or a library let to one occupier — and there its column load is exceeded in a quarter of lives.
The visits that come to every floor at once
A floor's characteristic imposed load is set mostly by its worst visit — a party, a move, a crowd — and visits to different floors almost never coincide, which is why a column carrying twenty office floors needs only about a quarter of their summed loads. Let some of the visits be made by the whole building at once and nothing changes on any one floor; one floor cannot tell. The column can. A tenth of the visits shared takes the twenty-floor factor from 0.26 to 0.51, a quarter to 0.68, and a third uses up the whole of the storey rule's reduction. The rule fails in exactly the buildings whose use synchronises the crowd, and it fails most where the load mostly visits.
The column under the escape corridor
A column's imposed-load reduction is allowed by the number of floors it carries, on the reasoning that floors are not crowded at the same moment. A column whose tributary area includes escape corridor carries a part of every floor that is crowded at exactly the same moment, every time the building is evacuated. Its reduction follows how much corridor its area holds, not how many floors it carries — a tenth costs little, two-fifths uses up the whole of the storey rule's allowance, and a stair-core column needs almost none. Against the nominal loads a designer writes down, the margin that saves the columns at the corridor's edge has run out by the time the area is mostly corridor.
The strength three cores revise
A characteristic strength estimated from three specimens and nothing else is heavily penalised, because three results cannot say how scattered a material is. An existing structure is never nothing else. It was built to a specified grade, from a population of concretes whose scatter is known in general, and three cores drilled from it revise that knowledge rather than replace it. Together they give a characteristic strength that three cores alone would need twenty to match. The same arithmetic catches a concrete much weaker than its specification, because cores that disagree with the prior widen it — unless the prior is given so much weight that it no longer listens.
The cores that agree for the wrong reason
Three cores drilled a metre apart in one slab share a pour, a curing and a morning's water, so they agree with each other more closely than they agree with the rest of the building. Counted as three independent specimens, they overstate what is known — and with nothing else to go on, the estimate built on them leaves a quarter of the building's concrete below a value meant to leave a twentieth. Counting them by their correlation repairs that. But once the specification is in the update, the honest count hands the estimate back to the specification, and a concrete weaker than it was meant to be hides behind it. The repair is not in the arithmetic. It is in where the cores are drilled.
The stair that empties three floors at a time
A column beside an escape stair carries the corridor crowd of every evacuation, and when every floor empties at once its floors are loaded together and earn almost no reduction. Tall buildings are usually evacuated in phases instead, three floors at a time, so that the stair is never asked to carry everyone. Under such a stair the column earns its reduction back and more — 0.29 of the summed floor loads, where the storey rule allows 0.73. But a phased strategy is a plan for the usual alarm, and the column's characteristic load belongs to the unusual one. If one alarm in a hundred escalates to a full evacuation, the factor climbs back to 0.59; one in twenty, and it passes the rule.
Named alongside it
The objects these essays reach for when they reach for this one.
ReliabilityIndependenceCharacteristic valueImposed loadLive load reductionLoad combinationTributary areaCharacteristic strengthScatterTestingPartial factorQuality control