Concept

Lateral restraint — where it appears

Anything that stops a compression element moving sideways, at a point or continuously along it. What it needs is a stiffness rather than a strength, and the force it actually carries comes from the member's initial crookedness.

Named by 7 essays across one field — each of them below, with the objects they name alongside it.

The length at which a beam stops being a beam. Elastic critical moment against the distance between lateral restraints, with the section's plastic capacity drawn across it. The two cross at 3803 — beyond that length the beam buckles sideways before it reaches the strength its cross-section has, and the capacity is set by the restraints rather than by the steel.

The beam that fails sideways

A deep narrow beam bending in its strong plane can, at a moment well below its capacity, swing out of that plane and twist. The failure has nothing to do with how much it can carry and everything to do with what is holding it.

stability · Lateral-torsional
A brace is a stiffness requirement, not a strength one. Critical load against brace stiffness for a pinned column braced at mid-height. The curve climbs from the unbraced Euler load of 9.87EI/L² and flattens at 39.48EI/L², which is the Euler load of the braced segment — past that the column buckles in a shape the brace does not obstruct, and further stiffness buys nothing. The knee is at about 159EI/L³. A stiffness of 60EI/L³ is marked, reaching 21.75EI/L².

The brace that need not be strong

A brace holding a column at mid-height carries almost no force. What it has to be is stiff — and the stiffness required is exact, large, and reached at a knee past which more buys nothing at all.

stability · Effective length
How stiff a brace has to be before the frame stops swaying. The effective length factor of a swaying portal against the stiffness of a horizontal spring at its head. The curve starts at k = 1.317, the unbraced value, and falls to 0.774 — the factor for the same frame with its head held — at a brace stiffness of 23.2 EI/L³. Past that point the frame buckles in the non-sway mode, which the brace does not restrain, and further stiffness buys nothing at all. The threshold is worth stating as 1.41 N꜀ᵣ/L, which is the form the number is memorable in: for a storey carrying a thousand kilonewtons over four metres it is about 0.35 kN per millimetre of sway. Against the frame's own lateral stiffness of 12.0 EI/L³ it is a factor of 1.93.

The most dangerous day is before it is finished

A structure is analysed once, complete, with every restraint present. It spends weeks in states nobody drew — a beam landed with no deck on it holds 17% of the moment its section is worth, a frame not yet braced buckles at a third of the load it will, and a bolt not yet tightened is a pin where the analysis assumed a fixity.

stability · Erection stability
At the tip it is the tension flange that swings. The buckled shape of a 3.00 m cantilever of 457 mm universal beam carrying a load at its tip at the shear centre, root built in: slope and warping held, seen from above: the sideways movement of the top flange and of the bottom flange along the length, scaled so the larger is one. The cantilever hogs, so its bottom flange is in compression, and that flange bows out furthest 0.58 of the way from the root, where it moves 0.15 — and has come back to 0.00 by the tip. The top flange, in tension, swings out to the full 1.00 at the tip. The section twists as it goes, so the flange that is doing the buckling is not the flange that moves most at the end. Critical moment at the root: 1266 kN·m.

The flange that swings is in tension

A cantilever hogs, so its bottom flange is the one in compression and the one that buckles. At its tip the bottom flange barely moves: the section turns about it, and the flange that swings out is the top one, in tension. So the restraint that matters at a cantilever's tip is on the flange every rule for spans calls the wrong one — and the root, which a drawing shows as a single line, moves the critical moment by a factor of thirty-four.

stability · Moment gradient
The knee moves out as the braces multiply. The critical load of a pin-ended column, over the Euler load of the segments between its braces, against the braces' stiffness in units of that load over the segment's length, for one, two and four braces. Each curve rises to the segment's Euler load and stays there; the knee where it arrives is at 2.00, 3.00, 3.62. With no braces at all the column buckles at 1/(n + 1)² of the segment's load: 0.25, 0.11, 0.04.

The braces that have to hold each other

One brace at mid-height must have a stiffness of twice the column's load over the length it halves. Spread the same column over four braces and each one must be stiffer, not softer: 3.62 times the load over its segment, rising towards four with every brace added, because the shape the braces have to stop is a zigzag in which every brace point is pushed by both its neighbours. Braces that tie the column to itself instead of to the ground need one, however many there are. A row with surplus stiffness can carry one brace at two thirds of the ideal, but not one that is missing, and the force each brace has to resist grows with the count.

stability · Effective length
A floor that shears lowers the storey's buckling load before the core does. The buckling factor of a storey of eleven lines of leaning columns, ten bays, each column carrying 3,000 kN over 3.6 m and built a three-hundredth out of plumb, held by a floor to a core sized for a buckling factor of 4.0 were the floor rigid, against the floor's shear stiffness per bay as a multiple of a column's sway softening P/h, logarithmic, with the core at one end, in the middle, or split between both ends; dotted, the rigid floor's 4.0. At 100 times the factor is 1.52, 2.80 and 3.02; at 1,000 times, 3.49, 3.84 and 3.88; a concrete slab is several thousand times.

The floor the columns lean on

A storey of pin-ended columns, every one a little out of plumb, leans on its floor, and the floor leans on a core. Count the floor as rigid and the core needs the sum of the columns' demands. A floor that shears in its own plane is a brace in series with the core, and the far columns lean on it before their push arrives. With a floor a hundred times stiffer per bay than a column's own sway softening, the storey's buckling factor falls from 4.0 to 1.5 and the core is asked for twice as much.

stability · Effective length
Where a girder held along its top flange twists as it buckles. The twist along a 8.0 m span whose ends are hogged 2.0 times its sagging moment, a slab holding its top face, each mode scaled to its largest: a 300 mm top flange over a 150 (1,066 kN·m at the supports), equal flanges (7,083) and a 150 over a 300 (24,482), and the wide-topped girder with no slab (746). At mid-span the held modes twist 1.00, 0.86 and 0.51 of their largest.

The slab holds what the shear centre lets it

A floor slab fixed along a girder's top flange holds a line, and the line is worth its distance from the shear centre. Over the supports of a fixed-ended 8 m span the slab raises the wide-topped girder's buckling moment by 43 per cent, the equal-flanged girder's fivefold and the wide-bottomed girder's fifteenfold — because the wide top flange drags the shear centre up to the slab, where holding it holds almost nothing. Under a uniform hogging moment the same slab is worth under a tenth to all three.

stability · Lateral-torsional

Named alongside it

The objects these essays reach for when they reach for this one.

Effective lengthBracingLateral-torsional bucklingCritical loadImperfectionStiffnessBuckled mode shapeCompression flangeCritical momentWarpingCantileverConstruction sequence

All concepts