Uplift — where it appears
Named by 17 essays across 4 fields — each of them below, with the objects they name alongside it.
Weight is the only thing resisting it
A structure that is strong enough everywhere can still be blown over, and nothing in its material properties has any part in whether it is. The whole answer is a weight and a width — and the failure begins long before anything tips, at the moment one edge stops pressing down.
The middle third
A material that cannot be pulled imposes a condition on where the load may land, and the condition is a region rather than a point. For a rectangle it is the famous middle third; for every other section it is a shape nobody quotes, and one ordinary section's is nearly twice as generous as the rule allows.
A basement is a boat
Every load in this collection presses down and is resisted by strength. Hydrostatic uplift presses up, is resisted by weight, and does not care what is built on it — so the check contains no material property at all. It is a ratio of two weights, and one of them is water.
Held up by the air inside
A membrane has no bending stiffness at all, so the only thing that can hold it in tension is a pressure difference. The pressure needed to hold up a roof is smaller than the pressure a closed door makes — and the same pressure arrives at the foundation as hundreds of tonnes of uplift.
Most of it is suction
A wind load is drawn as arrows pressing on the windward face, which is where about three fifths of it comes from. The rest is a pull on the back. The two side faces carry the largest suctions on the building and contribute nothing at all to the answer — and the inside of the building, which nobody draws, decides whether the roof stays on.
Nine piles, and four times the settlement
A pile cap divides its load between its piles by the same three terms a bolt group uses and a section under biaxial bending uses. What a bolt group does not have is neighbours it shares ground with — and the group effect that matters is not the strength check everybody makes, but a stiffness effect nobody tabulates.
Every pressure points at the pin
Pressure acts normal to a surface, so on a curved one every element pushes in a different direction and no multiplication gives the resultant. Two free bodies recover it without an integral — and on a circular surface a third observation makes the whole force disappear from the equation a hoist has to satisfy.
It tips inside its own hull
On rigid ground a body tips when its resultant reaches the edge of its base, and how stiff its supports are has nothing to do with it. On pads that settle, the body leans as it is pushed, the lean moves its weight, and the push that tips it falls by one number a site engineer already has: settlement times the height of the weight, over the square of the half-width. Toward a corner the loss doubles, and one soft pad makes the weakest direction one nobody checks.
The piles that would lift the ground
A basement too light to stay down can be pinned down with tension piles, each holding by the friction on its shaft. Add enough of them, close enough together, and the ground between them stops being something they grip and becomes something they carry: the group lifts out as a block, and the block's weight is all it can hold. For 600 mm piles 15 m long that happens closer than 2.06 m apart, a spacing with no raft, no water and no load in it — and every pile past that point is paid for twice.
The water that comes back while the floors go up
A basement below the water table is built dry, inside an excavation kept pumped, and the building that will one day hold it down is not there yet. When the pumps stop, the water comes back over days and the frame goes up a floor a week, and the basement is safe only if the weight stays ahead of the water at every instant. How long the pumps must run is not set by how heavy the building is. It is set by one ratio — how much weight the frame adds while the ground refills — and for a basement that needs five floors on it to hold itself down, a seven-day recovery asks for three and a fourteen-day one for one.
The ends the ground was holding down
Winkler's springs pull as readily as they push, and on a long footing strip the linear answer quietly uses that: it has the ground holding the strip's ends down. Take the pull away and the correction under the column is modest — eight or nine per cent on the pressure and the moment — but the shape of the answer changes completely. A weightless strip longer than about eight metres keeps exactly eight metres of itself on the ground, whatever length was poured, and the rest rises off as straight cantilevers carrying nothing. The middle-third rule turns out to be a property of rigid footings: an eight-metre strip lifts at a fiftieth of the eccentricity the kern allows.
The basement that leaks before it floats
A water table that rises after a basement is finished is a load that grows through the building's life, and the building's flotation check is the last thing it troubles. A metre of rise adds a sixth to the uplift on the whole building but over a quarter to the net load on the slab, which carries the water less its own weight. The slab's cracks, which a watertight basement is designed to, are the first thing to run out of room — and the limit for the cracks that pass right through it tightens as the water rises.
The footing the storms press down
A footing strip under a column that a storm rocks one way and then the other was expected to dig itself a bowl: its ends loaded half the time, compacted, and left hanging over the hollow. On ground that unloads and reloads four times as stiffly as it first loads, the bowl appears and the strip fills it. The column settles 26% more over three storms and then stops; the footing rocks 22% less than it did in its first storm and is 64% stiffer than on springs that forget, because rocking unloads half the strip and ground that has carried the column unloads stiffly. The storms change the settlement and the stiffness, and leave the moments almost where they were.
The building held down by its pump
A basement whose water table has risen above its design level is often given back its design head by a pump under the slab, and from then on it is safe while the pump runs. When the pump stops the water comes back on the ground's own clock, and the checks the pump was protecting are lost in an order the building's weight decides. Under eight storeys only the slab's cracks were ever at risk; under five, the building's flotation check goes first, four and three-quarter hours after the pump stops, and the slab's strength is never in question at all. A structure that was safe by its weight has become one that is safe by a machine, and the machine's reliability is now one of its loads.
The drain that fails a season at a time
A basement held at its design head by drains and a pump can fail suddenly, when the pump stops, or slowly, when fines settle in the drains and the head under the slab creeps up while the pump keeps running. The slow failure gives a standpipe read once a year a decade of warning, in its own time constants — if it is read in the wet season. And long before the silt floats the building on its own, it has made every stop of the pump more likely to.
The pressure the openings decide
A building's internal pressure is usually read from a table with three or four rows in it. It is really a balance: the air inside stays at whatever pressure lets as much out as comes in, and that makes it a statics problem with one unknown. Solved, it says a window of 1.8 m² in a 720 m² wall is enough to lift a 360 kN roof. It says the wall between two rooms carries more wind than the wall outside it. And it says the air in the room is a mass on a spring, which overshoots when the window breaks.
The silt a jet cannot reach
A basement held down by drains that silt up floats in the spring of year 24 if nobody touches them. Clean them every four years and it floats in year 104 — if a fifth of the silting is in places no jet reaches; in year 44 if half is. The cleaning interval barely matters beside that share, and the share is not knowable when the drains are laid. But it is measurable as soon as they are first cleaned: the standpipe read just after a cleaning sees only the silt that stayed, and its trend is the drains' life.
Named alongside it
The objects these essays reach for when they reach for this one.
Free bodyEquilibriumHydrostatic pressureFlotationOverturningBearing pressureDrainageEccentricityElastic foundationFactor of safetyKernLoad path