Prying — where it appears
Named by 13 essays across one field — each of them below, with the objects they name alongside it.
The force the bolt never saw applied
Pull a tee stub with a hundred kilonewtons and its bolt carries a hundred and fifty. The extra comes from the flange bending and pressing its own edge against the thing it is bolted to, and no free body of the connection as a point contains it.
A joint made of springs in series
A connection's stiffness is not a property of the connection. It is the series combination of the flexibilities of everything the force passes through — so the softest component decides, and stiffening any of the others changes almost nothing.
Making a moment cross a gap
A moment is not a thing that can be handed across a joint. It has to be turned into a pair of forces, carried separately, and reassembled — and the whole design is a question of how the tension is shared between bolt rows that are not equally able to take it.
The failure that is in the concrete
An anchor bolt is a steel component and its capacity is usually decided by something else entirely — a cone of concrete pulled out around it, failing in tension, in a material every other calculation on the project has assumed cannot take tension at all. The exponent in the capacity says so: it is not the square the geometry implies.
The thickness that decides who fails
A bolt in a tee stub carries more than the load applied to it, because the flange bends and levers against its own edge. How much more, and whether the bolt or the flange is the thing that gives way, are both decided by one dimension — and the two regimes it separates fail in completely different ways.
How much of the plate is bending
A tee stub is an object nobody builds, and the whole component method rests on replacing a real end plate with one. The length of the substitute is not a dimension of the plate — it is the length of the cheapest fold the plate can collapse along, and two families of fold compete for it on a criterion with no strength in it at all.
The rows have to share one fold
Each bolt row of an end plate is checked on its own, and the answers are added up. Two rows ninety millimetres apart cannot each fold the plate on a pattern two hundred and fifty millimetres long, because there is only one plate — so the group folds on one shorter pattern, and the sum was never available.
The bolt that was already stretched
Prying is a lever that needs the flange to lift before it can act, and a preloaded bolt does not let it. The bolt carries a fifth of every kilonewton applied until the plates part, and everything after that is the ordinary calculation — which is why preload changes the fatigue answer by a factor of a thousand and the strength answer by nothing at all.
The hinge that forms in the other flange
An end plate bolted to a column flange is two tee stubs sharing one bolt, and the force at their tips is one force pressing on both. Checked separately, as the component method checks them, the end plate carries 109 kN a bolt and the column flange 104. Together they carry 92 — by a mechanism with one hinge in each flange that neither tee stub has on its own.
The fixed base the bolts decide
A column base drawn as fixed is a spring, and the component method says what it is made of: the grout squeezed under the flange, the plate bending under the bolt row, and the anchor bolts stretching over their free length. For a 500 mm plate on two M24 bolts the bolts are three fifths of its flexibility, so the base comes out at nine times the column's EI/L — under a third of what EN 1993-1-8 calls rigid — and no thickness of plate can lift it above fifteen. Leave the bolts free in sleeves for erection tolerance and it falls to five. The frame on it drifts 28 per cent more than a fixed-based one and buckles at 83 per cent of the load.
The base that is rigid until the bed lets go
A column base drawn as fixed is a spring about a tenth as stiff as the rule for "rigid" requires, and most of its softness is the holding-down bolts stretching. Shortening the bolts helps less than it seems: even 60 mm of free length leaves the base below two thirds of the rigid boundary. Preloading them works completely — the base becomes half as stiff again as the boundary asks — but only while the grout under the plate stays in compression. The preload is spent at a definite moment, the same moment the column's own weight would buy for free, and the shorter the bolt the faster creep of the grout takes the preload away.
The flanges that lean on each other
A bolted end-plate joint's stiffness is built from springs in series: the end plate as a tee stub on a rigid base, the column flange as another, the bolt shared between them. The rigid base is not a fiction. It is exactly the plane of symmetry between two identical flanges bolted back to back, so for matched flanges the series sum is exact. A real end plate and column flange are not matched, and each tip bears on a tip that moves differently from its own. Solved as a pair, the error is the mismatch: 3% for an 18 mm end plate on a 14 mm column flange with similar lever arms, 12–15% when the end plate's bolt is twice as far from its web.
The clamp the pair holds longer
A preloaded bolt clamps an end plate to a column flange, and the joint stays closed until the tension relieves the clamp. The joint diagram says that happens at the preload over one minus the bolt's share — 122 kN for a 110 kN preload — but prying adds to the tension at the bolt line and the clamp lets go at 88. A component model checks each flange as a stub on a rigid base and lets the joint go when its weaker stub does, at 81 kN. The real pair, its tips leaning on a column flange that gives way, pries less than the end plate alone would, and holds its clamp nine per cent longer — fifteen when its lever arms are two to one.