Effective stress — where it appears
Named by 6 essays across 2 fields — each of them below, with the objects they name alongside it.
The ground that hangs on instead of holding up
A pile is driven through fill that has not finished settling. The fill goes down past the shaft, the friction along that length turns round, and the pile is now carrying the soil rather than the other way about. The worst force is not at the head and not at the toe, and nothing at that depth can be seen.
The surface that has to be searched for
Every other check in this collection is made at a section somebody drew. A slope has no section — the failure surface is a shape the ground chooses, so the calculation is a search over shapes, and the answer is the smallest number found rather than the solution of anything.
The coating that takes the resistance with it
The cure for downdrag is to make the pile slippery, and it works — a bitumen slip layer takes the drag on this pile from 1,131 kN to 34. It also removes the shaft friction that was holding the pile up, in the same proportion and over the same length, and past a certain smoothness there is no neutral plane to find because there is no equilibrium.
A failed slope gives a line, not a soil
A slope that has slipped is the one full-scale strength test geotechnics ever gets, and the standard way to read it is to set its factor of safety to one and solve for the soil. One equation cannot give two strengths. What it gives is a line of cohesions and friction angles, every one of which fails the slope exactly, and the repair designed on one point of that line can be worth a factor of 1.07 or of 1.51. The slip itself says which point: each soil on the line fails along a different surface, and the depth of the scar is the second equation.
The piles that would lift the ground
A basement too light to stay down can be pinned down with tension piles, each holding by the friction on its shaft. Add enough of them, close enough together, and the ground between them stops being something they grip and becomes something they carry: the group lifts out as a block, and the block's weight is all it can hold. For 600 mm piles 15 m long that happens closer than 2.06 m apart, a spacing with no raft, no water and no load in it — and every pile past that point is paid for twice.
Two slips are a shear test
One failed slope gives a line of soils, every one of which fits the failure. Two failed slopes give two lines, and where they cross is a soil that fits both. Whether the crossing means anything depends on how differently the two slopes loaded the ground: two slips at one angle cross only at zero cohesion, two at nearby angles cross anywhere in a twenty-degree band, and a flat, tall slope beside a steep, short one pins the soil to within two degrees — because each slip is a shear test at one normal stress, and a strength line needs two tests far apart.
Named alongside it
The objects these essays reach for when they reach for this one.
Factor of safetyBack analysisBishop methodCohesionDowndragEquilibriumFree bodyFrictionFriction angleLimit stateLoad pathNeutral plane