The load must go somewhere — page 21
The arm that calls for its own visit
An outrigger connected to a concrete building collects the core's and the columns' differential creep, and re-shimming its joint every few years lets that force go. Dates on a drawing are a guess at how fast the building will creep. A load cell in the joint replaces the guess: re-shim whenever it reads 1.40 MN and three visits, at one, four and twenty-three years, hold the arm there whatever the building does. A building that creeps 60 per cent more than predicted needs a fourth visit; the dated schedule lets it reach 2.30 MN. Holding a tenth of the wind takes eight visits, three in the first thirteen months, and a contractor who can come within weeks.
The pier that may rise belongs under a joint
A pier that may only settle is best put in the middle of a two-span pair, whose hogging a settlement relieves before it adds to anything. A pier on swelling clay, or over a culvert that may be relieved of its fill, may rise instead, and then the pair is the worst place for it: 40 mm of heave puts 459 kN·m into a pair that would have carried 230 for the same settlement. The place that is gentle both ways is the end of a group, under a movement joint. With the doubtful piers' movement known in size but not in sign, joints over them carry 335 kN·m where pairs carry 459 and groups of three 465 — and nothing with the same traffic envelope does better.
The plate the loose frame stops protecting
A cross-frame bolted through clearance holes does nothing until a lorry has distorted the box far enough to take up the hole, and among ring frames a millimetre is nearly the whole distortion a lorry produces. What that costs is not the frame's own life but the plates' around it. A tight frame holds the corner angle's range to 0.21 mrad over a few metres either side of itself; a millimetre of clearance lets it rise to 0.50, and a detail there loses a factor of thirteen in fatigue life. The box's worst place does not move, because it was never at the frame. The critical detail moves only if the frame's own detail is a worse category than the plain plate's, which it usually is.
The slab left to dry before the fill
A basement stem propped by its ground slab keeps the pressure the roller locked into its fill only while the slab still bears on it, and a slab cast four weeks before the fill shrinks away within sixteen months. Casting the slab first and letting it dry before the fill goes up sounds like the cure. Six months of drying buys four more years; a year keeps the slab touching the stem every summer for thirty. But a slab that touches only in summer gives back the propped moment only in summer, and in the tenth year a stem filled two years late still reaches 63 kN·m of its unpropped 70. The delay keeps the contact. It does not keep the design.
The load at which a strut's weight matters least
A pinned member that weighs something is no longer a two-force member — its own weight bends the line its force runs along into a parabola. A tie only straightens as it is pulled harder. A strut does not: its weight matters least at very nearly half its Euler load, for every section, length and material, and past a certain length it matters at every load the strut can carry.
The loop that sees only the end bolts
A friction joint's hysteresis loop below slip carries its clamp in it, so a gauge across a splice reading a small loop could in principle tell a loose bolt from a tight one. In a row of six it can tell only some of them. The plates between the bolts share the load so that the two end bolts carry 38 kN of a 120 kN cycle and the middle two 7, and a loop's width goes as the square of a bolt's force: the end bolts draw the loop, the middle ones barely touch it. One end bolt at half its clamp nearly doubles the loop; the third bolt at half changes it by a third of a per cent. Forty rows of scattered clamps read their end bolts' mean with a correlation of 0.99 and their weakest bolt's with 0.51.
The girder sized member by member
A Vierendeel girder's posts can be sized to the stress ranges a crossing load gives them, and the earlier essay found that this keeps the girder's fatigue life for a tenth less steel. With the chords counted too — their axial force and their bending together — the girder's worst member is not a post but a middle chord. Sizing every member to that one range takes a quarter of the steel out and keeps the life; the posts barely move when the chords are resized, and sizing the two in turn settles in four passes. Sized for strength instead, the same girder uses more steel and lives a third as long, and sized to a range a fifth below the worst it is lighter than the uniform girder and lives twice as long.