Hogging — where it appears
Named by 2 essays across 2 fields — each of them below, with the objects they name alongside it.
Every section was somewhere else
A bridge pushed out over its piers subjects each of its cross-sections to a history rather than to a load case. Every one passes over every support and through every span, so the design envelope is the envelope of envelopes — and no in-service condition produces it.
The building the trough cannot bend
A tunnel leaves a settlement trough, and damage criteria are applied to the trough's deflection ratio over the length of each building above it. But a building is not the ground: it has a bending stiffness, and it takes only as much of the ground's curvature as that stiffness lets it. One number decides how much — the building's stiffness over the soil's modulus times its length to the fourth — and over two decades of it a building goes from following the trough to bridging it. Because the length enters to the fourth power, the same building is stiff when short and soft when long.
Named alongside it
The objects these essays reach for when they reach for this one.
CantileverConstruction sequenceContinuityDeflection ratioDifferential settlementElastic foundationLaunching noseLoad arrangementMoment envelopeRelative stiffnessSaggingSettlement trough