Harmonic — where it appears

One sine wave in a sum that rebuilds a load or a moment along a member. Each wave can be solved on its own and the answers added, so a property that depends on wavelength, such as how much of a flange a stress reaches, can be found for any load from its mix of long and short waves.

Named by 4 essays across one field — each of them below, with the objects they name alongside it.

The lag follows the shear, so it is worst at the supports. Effective width along the span of a simply supported beam under a uniform load, summed over 25 odd harmonics. Each harmonic has its own half-wavelength L/n and its own, smaller, effective width — 0.815 for the first, 0.400 for the third, 0.269 for the fifth — and near a support the short harmonics carry a bigger share of what little moment there is. So the working fraction is 0.603 at the support against 0.839 at mid-span, a difference of 23.6 percentage points on the same flange. The single sinusoid's answer, 0.815, is drawn as the flat line, and it is only right at mid-span. This is the behaviour a code reproduces by shortening L_e near a support, and the reason it does is that shear lag is driven by w‴, which is the shear force.

The flange works least where the shear is largest

Shear lag is driven by the shear force rather than by the moment, so the effective width of a wide flange is not a property of the beam. It is a function of position along it, worst at the supports, and a single number quoted for a whole span is right at mid-span and nowhere else.

sections · Effective width
The flange over the support works over a third of its width. The effective width of the flange as a share of its overhang along two continuous 20 m spans with a flange overhang of 3.0 m each side of the web, the support bearing over 1.0 m, under a uniform load, left out where the moment is under three tenths of its peak (solid), with EN 1993-1-5's factors over the regions they apply to (dashed) and the simply supported span's mid-span value (dotted). At the sagging peak, 7.6 m from the end, the flange works over 0.81 of its width; over the support, over 0.33. EN 1993-1-5 gives 0.83 in the span and 0.34 over the support, from effective lengths of 17.0 and 10.0 m; a single span of 20 m has 0.88 at mid-span.

The reaction that is made of short waves

Run a wide-flanged girder continuously over a support and its worst moment moves to the support. That moment is made by a reaction, a reaction is made of short waves, and a short wave puts its stress next to the web. Over the support of two 20 m spans with a 3 m overhang the flange works over a third of its width, against four fifths at the sagging peak, so the stress at the web there is 4.2 times the sagging peak for a moment only 1.7 times as large — and how much flange works depends on what the support bears on.

sections · Effective width
A girder softer to short waves sheds a little of its support moment. For two continuous 20 m spans of a girder whose flanges are 6.0 m wide and 30 mm thick, 1.20 m apart on 24 mm of web — the flanges 97% of its stiffness — under a uniform load, each interior support 1.0 m long: the bending moment along the girder per unit load, sagging up — for a prismatic girder (dashed), which is what a global analysis gives with one effective width per span, and for the girder whose every wave of moment bends it with that wave's own effective flange (solid). The interior reaction falls by 0.88%, and because the support moment is the difference of two much larger moments, that becomes 4.6% of the support moment, 47.0 to 44.8; the sagging peak rises by 2.9%, 28.1 to 28.9.

The reaction moves one per cent and the moment five

Over the support of a wide-flanged continuous girder the flange works over a third of its width, so the girder there should be softer and shed moment into its spans. It does — but it is the reaction that the softness changes, by less than one per cent, and the support moment, a small difference of two large ones, moves by five. The stress spike over the support follows the reaction rather than the moment and eases by two. A prismatic analysis is right about the moments to a few per cent, and the spike stays a problem of the section.

sections · Effective width
The deck's width over the pier is set by its bars. The local effective width, as a fraction of the overhang, along a deck flange overhanging 3.0 m each side of its girder, continuous over two 20 m spans under a uniform load, drawn where the moment is at least three tenths of its largest: uncracked (dashed), and over the pier, where the deck is in tension, cracked with 1.5% of steel along the girder and 1.5% across it and with half that transverse steel. EN 1994's widths are drawn as the short level lines, Le/8 over the pier and in the spans. Over the pier the uncracked deck works over 0.325 of its overhang, the cracked one with equal bars over 0.328, and with half the transverse steel over 0.281; in the spans, uncracked, the deck works over 0.81. The rule gives 0.417 over the pier whichever way the deck is reinforced.

The deck that cracks over the pier

Over the pier of a continuous composite bridge the concrete deck is in tension and cracks, and what is left of it is a grid of bars and struts. Shear lag does not stop at the cracks: the bars still receive their force through the concrete between them. Whether the cracked deck works over a narrower width than the whole one depends on one ratio, the deck's shear stiffness over its axial stiffness — and once the concrete has cracked, both of those come from the reinforcement, so the answer is set by how the bars are arranged.

sections · Effective width

Named alongside it

The objects these essays reach for when they reach for this one.

ContinuityEffective widthShear lagBox girderFlangeStress distributionCompatibilityComposite actionEmpirical ruleFree bodyHoggingModular ratio

All concepts