Flat slab — where it appears
Named by 10 essays across 3 fields — each of them below, with the objects they name alongside it.
A check made on a perimeter, not on a section
Every shear check in this collection is made on a plane cut through a member. A slab sitting on a column has no such plane, because the shear leaves in every direction at once — so the check is made on a closed line, and a line grows with the column while the load grows with the square of the bay.
Two of these move and the third cannot
Cut one span of a continuous beam free and add up the forces on it. What comes out is that the mid-span moment plus the average of the two end moments equals the free bending moment of that span, with nothing else in it — no stiffness, no support settlement, no analysis at all. Continuity moves moment about. It does not reduce the total, and it never has.
Turn the column, and the slab passes
A flat slab that is comfortable under gravity fails its punching check the moment a moment arrives at the column, and nothing about the load has changed. The fix is not more concrete. It is the column's plan shape and, at equal area, which way round it is turned — worth more than adding half again as much column.
Loaded twice over before it is a month old
A concrete floor in a building going up a storey a week carries, in its first weeks, the wet weight of the floors being cast above it, handed down through the props. By Grundy and Kabaila's arithmetic that is twice its own weight on a single level of shores, and more with more levels — 2.25 on two, 2.37 on three — because every prop that carried wet concrete passes its load down the stack. The same props put in after the formwork is struck carry nothing until something new arrives, and the peak falls to 1.5, 1.33, 1.25. The heaviest day of a floor's life is decided by when its props went in, not how many there are.
The perimeter whose middle is not the column's
At an edge column the slab's own edge cuts the control perimeter, and what is left has its centroid 363 mm inside the column's centre. The slab's end moment moves the shear's resultant inward too, by a distance that grows with the end span. What twists the perimeter is the gap between the two: nothing at a 5 m end span, enough by 7.2 m to put the check at 1.23 of its resistance where the 1.4 shortcut reads 0.97. And a bigger column makes it worse.
The studs that send the check outward
Shear studs round a column fix a failing punching check, and they turn one check into three. The studs carry the control perimeter; past them the concrete alone must carry a perimeter long enough to need no help, and that outer perimeter stands further from the column the larger the load, so the studs follow it out. At a 10 m bay they reach four effective depths from the face, and the steel they need grows as the shear to the power 3.5. The third check, at the column face, is the one no stud reaches, and it ends the series at 11.8 m.
The backprop that takes load nobody gave it
The arithmetic of propped construction says a backprop put in snug carries nothing until the next floor is cast, and then only a share of it. Count the props as the springs they are and that barely changes, because a steel prop is about seven times stiffer than the slab per square metre. Two other things change it. The young slab just struck creeps onto its backprops within a day and hands a quarter of a slab's weight down to the one below, which then carries 1.71 times its weight rather than 1.5. And a millimetre of slack at installation — about half the slab's own deflection — gives the struck slab back everything a backprop was meant to save.
A hole takes a tenth of every perimeter
A 300 mm riser cut a slab's depth from a column throws a shadow from the column's centre, and EN 1992-1-1 deletes whatever part of a punching perimeter falls inside it. The outer perimeter, being longest, loses the most length — but it loses the same share as the control perimeter, a tenth of each, because the shadow is an angle. The cost arrives somewhere less obvious: a seventh ring of studs, 24 per cent more steel, and studs needed in a bay a third of a metre shorter than before.
The basement that leaks before it floats
A water table that rises after a basement is finished is a load that grows through the building's life, and the building's flotation check is the last thing it troubles. A metre of rise adds a sixth to the uplift on the whole building but over a quarter to the net load on the slab, which carries the water less its own weight. The slab's cracks, which a watertight basement is designed to, are the first thing to run out of room — and the limit for the cracks that pass right through it tightens as the water rises.
The core drilled after the slab was built
A building in use acquires new services, and a core drilled through a flat slab beside a column is a routine instruction. The studs round the column were laid out for a slab without the hole, and the drill finds whatever is there. Whether it cuts a stud matters less than it looks. What decides is the outer perimeter, which the hole pushes outward while the studs stay where they are, and whether the slab survives is set by a margin nobody chose: the room left when the studs were rounded up to a stock size and the rings to a whole number.
Named alongside it
The objects these essays reach for when they reach for this one.
Control perimeterEffective depthPunching shearBrittle failureEccentricityShear reinforcementBackproppingConstruction sequenceEarly-age strengthLoad sharingProgressive collapsePropping