Shear reinforcement — where it appears
Named by 3 essays across one field — each of them below, with the objects they name alongside it.
A check made on a perimeter, not on a section
Every shear check in this collection is made on a plane cut through a member. A slab sitting on a column has no such plane, because the shear leaves in every direction at once — so the check is made on a closed line, and a line grows with the column while the load grows with the square of the bay.
The load that has to be lifted
Every shear calculation on this site assumes the load arrives on the top of the beam and walks down a diagonal to the support. Hang the same load from the soffit and the diagonal cannot start — the load has to be carried up to the compression zone first, by a tie no sectional calculation contains.
The studs that send the check outward
Shear studs round a column fix a failing punching check, and they turn one check into three. The studs carry the control perimeter; past them the concrete alone must carry a perimeter long enough to need no help, and that outer perimeter stands further from the column the larger the load, so the studs follow it out. At a 10 m bay they reach four effective depths from the face, and the steel they need grows as the shear to the power 3.5. The third check, at the column face, is the one no stud reaches, and it ends the series at 11.8 m.
Named alongside it
The objects these essays reach for when they reach for this one.
Strut-and-tieControl perimeterEffective depthFlat slabPunching shearAggregate interlockBrittle failureClamping forceColumn headCompression strutDetailingEccentricity