Concept

Shear reinforcement — where it appears

Steel carrying the tension diagonal of a concrete member's internal truss, usually links crossing the potential shear crack. Its area follows from the shear force, the strut angle assumed and the lever arm, and it is separate from any steel needed to suspend a load into the compression zone.

Named by 6 essays across one field — each of them below, with the objects they name alongside it.

A check made on a perimeter, not on a section. One bay of a flat slab, 7.2 m square, on a 400 × 400 mm column. The heavy closed line is the control perimeter, 2d from the column face with its corners rounded at that radius — 4427 mm long against 1600 mm round the column itself. The shaded area inside it delivers no shear across it and is subtracted from the load; everything outside arrives through the perimeter. At 12 kN/m² that is 604 kN across 4427 × 225 mm, a shear stress of 0.606 N/mm² against a resistance of 0.658.

A check made on a perimeter, not on a section

Every shear check in this collection is made on a plane cut through a member. A slab sitting on a column has no such plane, because the shear leaves in every direction at once — so the check is made on a closed line, and a line grows with the column while the load grows with the square of the bay.

internal-forces · Punching shear
The same beam, the same load, and one of them has to lift it. Two lower-bound models of one beam, differing only in which chord the 600 kN is applied to. The chord forces are identical in both — the moment diagram does not know where the load arrived — and so are the struts. What is not identical is the vertical at the load: nothing in the top-loaded model, and the whole 600 kN in the hung one, because a bottom-chord panel point touches no strut and the load has nowhere to go but up. That tie is 1200 mm² of steel against the 96 mm² the shear calculation asks for over the same length — a factor of 12.5, in the same place, and additional to it.

The load that has to be lifted

Every shear calculation on this site assumes the load arrives on the top of the beam and walks down a diagonal to the support. Hang the same load from the soffit and the diagonal cannot start — the load has to be carried up to the compression zone first, by a tie no sectional calculation contains.

internal-forces · Indirect support
The studs reach out to where the concrete is enough. One column of a 260 mm flat slab (d = 225 mm) carrying 12 kN/m² on 400 × 400 mm internal columns, the moment it hands the column putting the shear 300 mm off centre, on a 10.0 m bay, to scale. The inner check, on the control perimeter 2d out (solid), needs reinforcement: 12 rails of studs, 6 perimeters of them from 0.5d at 0.75d spacing, 1,415 mm² on each perimeter. The outer perimeter (dashed), where the concrete alone carries the shear, stands 5.4d from the face — 9,173 mm long against the control perimeter's 4,427 — and the last studs must be within 1.5d inside it, 3.9d from the face.

The studs that send the check outward

Shear studs round a column fix a failing punching check, and they turn one check into three. The studs carry the control perimeter; past them the concrete alone must carry a perimeter long enough to need no help, and that outer perimeter stands further from the column the larger the load, so the studs follow it out. At a 10 m bay they reach four effective depths from the face, and the steel they need grows as the shear to the power 3.5. The third check, at the column face, is the one no stud reaches, and it ends the series at 11.8 m.

internal-forces · Punching shear
The shadow an opening casts on every perimeter. One column of a 260 mm flat slab (d = 225 mm) carrying 12 kN/m² on 400 × 400 mm columns, the shear 300 mm off centre, on a 10.0 m bay, to scale, with a 300 × 300 mm opening 225 mm (1.0d) from the column. The two tangents from the column's centre to the opening's corners (dashed) enclose 38.9 degrees, and every perimeter loses the part between them: 458 mm of the control perimeter 2d out (solid), 1,093 mm of the outer perimeter (dashed), the lost parts drawn faint. With the opening the outer perimeter stands 6.13d from the face instead of 5.36d, and the studs need 7 perimeters instead of 6; one of the 12 rails runs into the hole.

A hole takes a tenth of every perimeter

A 300 mm riser cut a slab's depth from a column throws a shadow from the column's centre, and EN 1992-1-1 deletes whatever part of a punching perimeter falls inside it. The outer perimeter, being longest, loses the most length — but it loses the same share as the control perimeter, a tenth of each, because the shadow is an angle. The cost arrives somewhere less obvious: a seventh ring of studs, 24 per cent more steel, and studs needed in a bay a third of a metre shorter than before.

internal-forces · Punching shear
A core drilled into a slab the studs were laid out for without it. One column of a 260 mm flat slab (d = 225 mm) carrying 12 kN/m² on 400 × 400 mm columns, the shear 300 mm off centre, on a 10.0 m bay, to scale, its studs laid out for the slab without a hole — six rings of 14 mm studs on twelve rails, the last ring 4.25d from the face — and a 150 mm core 225 mm (1.00d) from the face. Its shadow from the column's centre takes 20.3 degrees of every perimeter. The studs' outer perimeter stands where the last ring leaves it, 5.75d out (solid); with the core the slab needs it at 5.74d (dashed), so the outer check is at 1.00 of its capacity, and the control check's studs at 0.79. No rail runs into it.

The core drilled after the slab was built

A building in use acquires new services, and a core drilled through a flat slab beside a column is a routine instruction. The studs round the column were laid out for a slab without the hole, and the drill finds whatever is there. Whether it cuts a stud matters less than it looks. What decides is the outer perimeter, which the hole pushes outward while the studs stay where they are, and whether the slab survives is set by a margin nobody chose: the room left when the studs were rounded up to a stock size and the rings to a whole number.

internal-forces · Punching shear
Whole spans miss the shear inside a span. The shear along three spans of 8.0, 8.0, 8.0 m, under 20 kN/m of dead load everywhere and 15 kN/m imposed: the largest and least when the imposed load stands wherever it raises or lowers the shear at each section (solid), and when it may only cover whole spans (dashed). At the supports the two agree. At the middle of the second span the exact envelope reaches 23.8 kN either way and the whole spans 10.0 kN; at a tenth of the way along it, 122.4 against 122.0.

The shear whole spans cannot find

A continuous beam is designed by loading its spans in patterns, whole spans at a time, and for the bending moment that is very nearly exact: the moment's influence line keeps one sign over each span, so a span is either worth loading or not. The shear's influence line changes sign at the section itself, inside the span, and no pattern of whole spans can load one side of a section and not the other. At the middle of the inner span of three equal spans the imposed shear is 0.198 qL; whole spans find 0.083 qL, and the straight line to qL/8 that is safe on a simple span finds 0.125.

internal-forces · Influence line

Named alongside it

The objects these essays reach for when they reach for this one.

Control perimeterEffective depthFlat slabPunching shearBrittle failureStrut-and-tieEccentricityAggregate interlockBending momentClamping forceColumn headCompression strut

All concepts