Concept

Abutment — where it appears

The block at the end of an arch or a bridge that receives its thrust and passes it into the ground. It is a spring rather than a support: it turns under the springing moment and spreads under the thrust, and the spread enters the arch exactly as the rib's own shortening does.

Named by 4 essays across 3 fields — each of them below, with the objects they name alongside it.

The summer that is worse than the one before it. The earth pressure behind an integral abutment, summer by summer, as a multiple of the at-rest value it started at. A 60 m deck expands by 10.8 mm at each end and pushes the abutment into the backfill. Granular soil under cyclic strain densifies, so the same movement next year needs a higher pressure to achieve, and K climbs from 0.38 toward 0.96 — a factor of 2.49 on the force, reached after about a century. The design load on an integral abutment describes the bridge's whole life rather than a load case, and it is the only load in this collection that gets larger because time has passed rather than because something was added.

The summer that is worse than the last

An expansion joint is a hole in a deck that leaks salt water onto the bearings underneath it. Remove it and the thermal movement does not go away — it goes into the soil behind the abutment, twice a day for a hundred and twenty years, and granular soil under cyclic strain gets denser.

structures · Integral bridge
How stiff an abutment has to be to count as fixed. The shortening moments in a 60 m parabolic concrete rib at a 6 m rise (EI 420,000 kN·m²) under 60 kN/m as shares of the fixed rib's, against the rotational stiffness of each springing as a multiple of EI/L on a logarithmic scale: at the springings (solid, −112 kN·m when fixed) and the crown (dashed, 58 kN·m fixed, 29 two-hinged). The springing moment is half the fixed value at kθ = 11.3 EI/L and nine tenths at 102 EI/L; at EI/L itself it is 8 per cent. The crown moment never falls below the two-hinged rib's 51 per cent of the fixed value.

The abutment that spreads before it turns

A fixed arch is fixed only if its abutments hold still, and they have two ways not to. Turning releases the springing moment, but slowly: an abutment has to be a hundred times the rib's EI/L to hold nine tenths of it, and a footing on stiff clay under a slender concrete rib already is. Spreading does the opposite. The rib's own shortening is worth 13.6 mm of spread, so an abutment that gives 7 mm a side under the thrust doubles every secondary moment in the arch — and a footing on dense sand gives 8.

deflection · Rib shortening
The water pushes on the chord, and the abutments push back along the arch. One horizontal ring of an arch dam, one metre high, 50 m below the water, spanning a 100 m gap with a central angle of 133.6°, drawn in plan with the water on the convex side. The water presses 491 kPa normal to the face everywhere (arrows); by the projection rule its resultant is that pressure times the chord, 49,050 kN per metre of height, pointing straight downstream. Each abutment pushes back along the ring's tangent, at 66.8° to the chord, so the two thrusts are N = pw/2sin(θ/2) = 26,686 kN — the pressure times the ring's radius, 54.4 m, which is the hoop formula of a pipe, arrived at without a pipe.

The angle that saves the most concrete

Cut an arch dam into horizontal rings and each ring is a curved surface with water on one side. The projection rule gives the water's whole push on it without an integral — the pressure times the chord — and the two abutments, pushing back along the ring, turn that into a thrust equal to the pressure times the radius, the hoop formula of a pipe arrived at without a pipe. From there one line of calculus says that the ring using least concrete has a central angle of 133.6°, whatever the canyon, the depth or the concrete. That number explains why arch dams in narrowing canyons are drawn at a constant angle rather than a constant radius, and why the angle that suits the concrete is not the one that suits the rock.

equilibrium · Curved surface pressure
The gaps that open after the arch is closed. For the 60 m fixed concrete rib rising 6 m under 60 kN/m, closed at 28 days with its abutments jacked apart to take up the day's gap: the gap between the rib and its springings that each movement opens after closure, in millimetres, against the years since, on a log scale — the rib's creep under its thrust, its shrinkage, and the ground consolidating under the thrust by 1.0 times its 8 mm immediate spread with 90% done at 10 years. After a hundred years they are 24.8, 16.2 and 8.0 mm, 48.9 in all, against the 13.6 mm the thrust shortened the rib on the day. The rib resists them while it creeps itself, so the gap it acts as if fixed against is 20.9 mm (fine dashes).

The jacks the arch forgets

Jack a fixed concrete arch's abutments apart before the crown is closed, by exactly the gap its thrust and its footings open on the day, and the springings start with no moment at all. A century later they carry 173 kN·m — half as much again as the 112 the jacks were set to remove. The thrust's own moment never relaxes; the jacks' correction does, as the rib creeps; and shrinkage and the ground's consolidation arrive after the jacks have gone. No single setting cancels movements that run on different clocks.

deflection · Rib shortening

Named alongside it

The objects these essays reach for when they reach for this one.

ArchThrustAxial shorteningImposed deformationArticulationConsolidationCreepCurved surface pressureDurabilityEarth pressureElastic centreHoop stress

All concepts