Concept

Earth pressure — where it appears

The horizontal stress soil applies to a structure retaining it, expressed as a coefficient times the vertical stress. The coefficient is not a soil property but a movement one: it falls to its active value when the wall moves away and rises toward its passive value when the wall pushes in.

Named by 4 essays across 2 fields — each of them below, with the objects they name alongside it.

A bearing capacity is a mechanism, and here it is. Prandtl's collapse mechanism under a 3.0 m footing in a soil of 32° friction. A rigid wedge is driven down with the footing at 61° to the horizontal; a fan of radial shear turns the stress through exactly ninety degrees on a logarithmic spiral whose growth rate is tanφ; and a passive wedge at 29° has to be pushed up and out of the way. Nothing here is empirical — every angle is a function of φ alone — and the mechanism reaches 15.9 m from the centre, which is 10.6 times the footing's half width. That is why two footings closer together than about four widths do not have separate bearing capacities.

The ground is a mechanism

Bearing capacity is met as a formula with three terms and a table of coefficients, and that presentation hides what it is. Underneath is a plastic collapse mechanism — a rigid wedge, a fan of radial shear on a logarithmic spiral, and a passive wedge that has to be pushed up and out of the way — and every coefficient in the table is a property of that one drawing.

equilibrium · bearing capacity
The prop load is decided by the digging, not by the hole. Prop forces in a 12 m excavation propped at 3 levels, with the force each prop reaches at any stage of the sequence drawn thick and the force the finished arrangement gives it drawn thin. The pale dots are the individual stages. The middle prop reaches 214 kN while the dig is at 9.5 m and finishes at 88 — a factor of 2.44 between the two, and the larger one is not in the final analysis anywhere. Terzaghi and Peck's apparent pressure diagram, a rectangle of 49.4 kN/m², reproduces the total of the staged maxima to 2% — which is what it is: an envelope of measured prop loads, back-figured into a pressure, and a shape nothing on a wall is ever loaded with.

Every prop has its own worst day

A braced excavation has no finished state worth analysing. It is dug in stages, a level of props goes in at each stage, and a prop's force is largely fixed the moment it is installed — so the force to design it for is the largest it sees during a sequence that appears on no calculation sheet, and which for the middle prop here is nearly two and a half times what the finished arrangement gives.

structures · propped excavation
The lining that carries less for being weaker. Bending moment and hoop thrust in a circular lining, against the lining's own bending stiffness, both as fractions of the free-ring values. The ground arrives already stressed — 500 kPa vertically and 300 horizontally at K₀ = 0.6 — and the difference between them tries to squash the hole into an ellipse. A lining stiff enough to refuse absolutely collects the whole distortion pressure, p₂R²/3 = 300 kNm/m; one flexible enough to go with the ground collects nothing, because there is no curvature change left to resist. The thrust is the flat line: it comes from the mean stress rather than the difference, so it does not move at all. Putting 8 joints in this ring drops the moment to 34% of the solid one and leaves the thrust exactly where it was, which is why a segmental lining is jointed and why the intuition carried over from a beam is inverted here.

The lining that is stronger for being weaker

A tunnel lining is not loaded. The ground arrives already stressed and the hole wants to squash into an ellipse; the lining's only job is to refuse, and how much moment it collects depends entirely on how hard it refuses. Make it stiffer and it takes more. Make it flexible — put joints in it, make it thin — and it takes almost none, while the hoop thrust it carries does not move at all.

structures · tunnel ring
Two identical pipes, and one carries three times the other. Load per metre on a buried conduit against the depth of cover, in trench widths, with the weight of the prism of soil directly above it drawn between them. A conduit laid in a narrow trench is stiffer than nothing and softer than the sides: the backfill settles relative to the undisturbed ground, the friction on the trench walls acts upward, and the conduit gets 64% of the prism. Lay the same conduit on the ground and build an embankment over it and it is now stiffer than the fill beside it, the interior prism settles less, the friction acts downward, and it gets 172% — a factor of 2.71 between two pipes with nothing different but which way the ground moved. The equation is Janssen's, the same one a silo wall obeys, with a trench for a silo; both curves start on the prism line, because with no depth there is no shear to redistribute anything. This is why a flexible pipe is buried rather than a rigid one: making the conduit weaker moves it down the page.

The pipe decides what the soil weighs

A buried conduit is not loaded by the soil above it. It is loaded by whatever share of that soil the relative movement leaves it — and which way the shear on the sides of the prism acts depends on whether the conduit settles more or less than the ground beside it. Two identical pipes under identical fill, one carrying two thirds of the prism and one carrying nearly twice it.

equilibrium · soil arching

Named alongside it

The objects these essays reach for when they reach for this one.

Free bodyImposed deformationLower bound theoremStiffnessConstruction sequencePassive pressureRing compressionActive pressureApparent pressureBearing capacityBuried conduitCohesion