Which failure arrives first — page 3
The wind that brings its own frequency
Every other load in this subject arrives at whatever rate it happens to arrive at. Vortex shedding arrives at a rate set by the wind speed — so for any chimney, mast or cable there is always a wind speed at which the shedding matches the structure exactly, and it is a breeze rather than a storm.
The bridge that was pushed by its own sway
A crowd walking on a bridge that moves sideways adjusts its footing to stay balanced, and the adjustment pushes the bridge the way it is already going. The crowd is a damper with the sign reversed, and past a certain number of people the total damping is negative.
The machine that shakes the building
Put a machine on springs to keep its vibration out of the floor, and below a frequency ratio of root two the springs make things worse. Every transmissibility curve ever drawn passes through exactly one at that ratio, whatever the damping — so a soft mount either works well or fails badly, with nothing in between.
The motion that feeds itself
A steady wind contains no frequency at all, and it can destroy a bridge. The force that does it is manufactured by the structure's own movement, so there is no excitation to resonate with — there is a wind speed above which the equilibrium is unstable, and below which nothing happens.
The load put on backwards
Every other structure in this collection waits for its load and then resists it. A prestressed one is given a load first — chosen, permanent, and pointing the wrong way — so that when the real one arrives the two nearly cancel and the material never has to do the thing it is bad at.
The roof that jumps
Every stability failure in this collection so far has been a bifurcation — a straight thing discovering it can be bent. A shallow frame does something else entirely. It stays perfectly symmetric, deforms steadily, and at some point the load it can carry starts to fall while it is still moving in the direction it was pushed.
A third of what the theory promised
A column with a small crookedness reaches almost its full Euler load. A cylinder with the same relative crookedness reaches a third of its classical one, and the theory is not wrong — what separates them is the slope of the path just past the critical load, which no calculation of the critical load itself can see.
The structure that survives losing a member
Every check in this collection asks what a structure carries. None of them asks what is left when part of it is gone — and two frames with the same members, the same weight and the same factor of safety can answer that question completely differently.
The load that depends on what carries it
Every other load in this collection is a number the structure is given. Retained soil is not — it pushes with a fraction of its own weight, and the fraction is decided by how far the wall moves. Six millimetres of retreat on a six-metre wall takes a third off the load, and being held still puts it back.
The bar that was bent before it was loaded
In a curved bar plane sections still stay plane, and the bending formula is wrong anyway. The fibres were different lengths before anything was applied, so an equal rotation of two plane faces produces unequal strain — the stress is a hyperbola, the neutral axis has moved inward, and a crane hook carries half as much again as My/I reports.
The column that twists instead of bending
Euler's column has one mode. A real column has three, and which of them governs is settled by where the shear centre sits. A cruciform strut buckles by rotating about its own length at a load that does not change no matter how short it is made.
Held, and not held
One horizontal restraint at the head of a storey, carrying no vertical load whatever, moves the critical load of the columns beneath it by a factor of 2.89. Effective length is a property of the frame, not of the member.
The stiffness that comes from the shape
A cable has no bending stiffness whatever, and it still holds up a roof. What resists the load is the change of its own geometry, so its stiffness is a function of the tension already in it — and prestress buys stiffness that no change of material could.
The column that had yielded before it was loaded
A real column sits below both of the two straight answers over the whole middle of the slenderness range, and the usual explanation — that it was not straight — is only half of it. The other half is that the flange tips had already yielded when it left the rolling mill.
The panel that carries more after it has failed
Everywhere else in this field a critical load is where the argument ends. A thin web is the exception — it buckles visibly, in waves anybody can see, and then goes on to carry nearly twice as much again by turning itself into a truss nobody drew.
The force nobody put in the model
A slab strip whose ends cannot move apart is not the strip in the yield-line calculation. Deflecting shortens the chord between its ends, the ends do not come in, and the strip is forced into an arch — worth four times the load it was designed for, at a movement nobody would see.
The worst stress is not where the worst bending is
Every stress this collection has quoted is a stress on a particular plane, and neither the bending stress nor the shear stress is a property of the point. Turn the plane and both change; one pair of numbers does not, and on a short beam it peaks where neither of them does.
The hole that costs nothing, and everything
A service opening removes 30% of a beam's second moment and 0.7% of its deflection. What it costs is not that. Across the opening the shear has nowhere to go but through the two tees, and a tee carrying shear over a length bends.
Folded until it spans
A flat sheet has a second moment of area of B·t³/12 and will not span anything. Folded, the same material has B·t·h²/12, and the gain is exactly the fold depth over the thickness, squared — a ratio with no material in it and no width in it.
A check made on a perimeter, not on a section
Every shear check in this collection is made on a plane cut through a member. A slab sitting on a column has no such plane, because the shear leaves in every direction at once — so the check is made on a closed line, and a line grows with the column while the load grows with the square of the bay.
Shear across a crack that is already there
Every shear calculation in this collection starts from an uncracked solid — a principal stress, a shear flow, a diagonal tension. This one starts after the crack, on a plane with no tensile strength at all, and the coefficient it uses is not a coefficient of friction. It is the slope of the roughness.
Two strengths, depending which way up
A symmetric section has one section modulus. A tee has two, differing by a factor of three, so the same member has two bending strengths and which applies is decided by the sign of the moment. Turn it over and it is a different beam.
The one length a section takes into a column
A section has an area, a second moment, two section moduli, a shear centre and a torsion constant. A column has heard of exactly one of them, and it is none of those — it is the length √(I/A), which is where the whole area would have to sit to give the section the stiffness it has.
The section that changes along the span
A prismatic beam is checked where the moment is largest, and everyone knows where that is. A tapered one is not, because the capacity is moving too — and for a cantilever with a load at its tip the governing station is exactly where the depth has doubled, with no length, no load and no material in the answer.