Theme

Which failure arrives first — page 24

Essays 553 to 560 of 560 on this thread, in the same order.
The gap is a vector, and the kern is round. The middle cross-section of a 168.3 × 5.0 mm steel tube 8.0 m long between pins, horizontal, bowed 5.9 mm, the first sine component of its own sag, the bow in a plane 15° from up, pushed with 100 kN, seen along the tube: the kern, the thrust line and the axis drawn to scale, the tube's wall 84.2 mm out beyond the drawing. The weight's line of thrust passes 15.8 mm above the straight line between the pins; the tube's axis sits 16.1 mm below the thrust line from the weight and the bow's vertical part, and 2.4 mm to the side from the bow's horizontal part, amplified 1.56 times. The gap between them is 16.3 mm, against a round kern of radius 39.6 mm: the tube bends in a plane 8° from the vertical. Equilibrium

The bow that points the wrong way round

A horizontal tube strut bowed upward by the sag its own weight would give it stays a two-force member from 40 kN to its Euler load. Turn the same bow fifteen degrees off vertical and the top of that window drops to 266 kN; turn it on its side and the window is 50 to 209, worse than a straight tube's. The tube is round, so its gap is a vector and its kern a disc, and a bow's sideways part has nothing in the weight's plane to cancel it. The plane of the bow needs to be found to a few tens of degrees, not to one — and a tube left lying on the floor is found at the worst angle short of upside down.

A stop with a soft lining: two springs met in turn. For a 2% tuned mass on a 4 s building, swung ±0.40 m along the wind by the wind, inside a ring of stops 0.50 m in radius: the stop's force on the mass, over the mass's weight, against how far the mass travels from its rest position. The hard ring alone pushes from 0.50 m at 25.2 times the mass's weight per metre of overlap. Lined with a layer 80 mm thick whose contact alone would last 0.8 s, the stop first pushes from 0.42 m at 1.57 weights per metre, 0.13 of the weight when the lining is fully compressed, and the hard ring then adds its own. Fully compressed, the lining has stored 0.05 J per kilogram of the mass — enough to stop it arriving at 0.31 m/s. The wind's swing reaches 0.40 m and never touches either. Dynamics

The lining the mass must not crush

A wind-tuned mass inside a ring of hard stops strikes them two or three times in a moderate earthquake, each strike a blow of a seventh of its weight. Line the ring with a soft layer 80 mm thick and the strikes stop: the mass meets the lining instead and is pressed back at half the force. But a lining is not better for being softer. It has to stop the mass inside its own thickness, so it has a stiffness floor set by the speed the mass arrives at, and the best lining for a strong earthquake is three times stiffer than the best for a moderate one. Below the floor the mass drives straight through to the ring.

Each member's stress as one axle crosses. For a six-panel Vierendeel girder 12 m long and 1.5 m deep, uniform, crossed node by node along its top chord by a single 100 kN axle: the bending stress at the top corner of an end post and of the middle post, and the stress at the top fibre of the third panel's top chord at its right end, against the axle's position. The end post's stress rises and falls once, a range of 51.3 N/mm²; the middle post's swings one way and then the other as the axle passes it, a range of 76.0; the chord's peaks as the axle crosses its own panel, 67.1. Every history goes from nothing to nothing with one swing between, so a crossing is one cycle of its range. Structural form

The axle the range cannot see

A Vierendeel girder's members were sized for fatigue by giving each one cycle of its stress range per crossing. Counted properly, by rainflow over every member's whole history, a single axle's crossing turns out to be exactly that — one cycle, for every post and every chord. What the range cannot see is a second axle. Two axles closer than about five metres still write one cycle; past that the middle post sees two, and once the axles are a span apart every member does, and the range understates the stress each member can be sized to by a quarter.

Two formulas for two questions, and the one that was asked. A strain of 300 microstrain in concrete of modulus 32,000 N/mm² loaded at 28 days, creep coefficient 2.38 after 27 years, imposed at once and held. The superposition integral leaves 2.32 N/mm² of the 9.60 it began with. The age-adjusted shortcut in its form for a held strain, Eε(1 − φ/(1 + χφ)), reproduces that exactly at χ = 0.90, and at the quoted 0.8 gives 1.73. The shortcut's other form, Eε/(1 + χφ), is the answer for a stress that grows from nothing; read for a held strain at 0.8 it gives 3.31, and the χ it would need to reproduce the integral is 1.32 — a number that measures the wrong formula, not the concrete. Materials

The coefficient that answered the wrong question

The age-adjusted effective modulus turns a creep integral into one line with an ageing coefficient in it, quoted as 0.8. Fed a strain imposed at once and held, the line seemed to need 1.32 on one creep function and 1.67 on another — evidence, it appeared, that the coefficient is no constant at all. It was the wrong line. The method has a second form for a held strain, and in that form the same concrete needs 0.90; so does the stress that grows from nothing. One coefficient answers both questions, and derived properly it always lies between a half and one.

The ground holds the section round while the tube bends. Moment against curvature for a 1,200 mm steel tube with a 2.5 mm wall bent along its length: bare and in air, where the section flattens into Brazier's oval and the moment turns over at 796 kN·m; and buried under 1.5 m of fill in ground of modulus of soil reaction 0.05, 0.3 and 3.0 MPa, where the ground pushes back on the flattening sides and the turnover rises to 1,375, 3,827 and 12,428 kN·m. The wall yields at 1,004 kN·m and buckles locally at 877, so in all but the loosest ground the wall's own limit arrives first. Stability

The ground that holds the tube round

A thin steel tube bent along its length flattens into an oval, and Brazier's limit — 796 kN·m for a 1.2 m tube with a 2.5 mm wall — is where the flattening wins. Bury it, and the soil pressing on its sides resists every millimetre of that oval. In ground as stiff as an ordinary compacted fill the limit rises sixteenfold, far past the moment at which the wall itself buckles, so a buried tube is never governed by Brazier at all. What the ground decides instead is the oval the cover's own weight makes before anything bends, and that is set by the soil and hardly by the tube.

Two staggered holes and the post that hands the shear across. Two 300 mm holes in a 533 × 209 mm I-beam spanning 9.0 m under 20 kN/m, the first 0.15 of the span from a support, the first centred 50 mm above mid-depth and the second 450 mm further along and 50 mm below, drawn to scale with the flanges' inner faces. The web between them is narrowest along the line of their centres, 161 mm, against 150 mm for the same holes in line. Across that strip the post carries 54.1 kN horizontally, the change in the top tees' compression, and 48.9 kN vertically — the shear moving from the first hole's deep bottom tee, which carries 88 per cent of it, to the second hole's deep top tee, which carries 88 — so the strip is a strut. Sections and stress

The post that hands the shear across

Two web openings side by side are usually staggered, one high for a duct and the next low for a pipe. Each is an offset hole whose deep tee is on the opposite side from its neighbour's, so the strip of web between them has to move most of the shear from the bottom of the beam to the top. Two 300 mm holes a diameter and a half apart, staggered 50 mm each way, leave a post that fails at 3.3 times the load where the same holes in line leave one that outlasts the holes at 5.8 — and the post governs all the way to mid-span, where the shear it hands across has gone and the step in the top tees' thrust has taken its place.

Five resets a year apart end where one reset on the last date ends. For two 12 m pretensioned beams made continuous over their pier in one pour with the slab, the first jack set to leave the joint with nothing at thirty years in 60 per cent humidity, a slab cast at six weeks, the beams creeping in 80 per cent humidity: the joint's moment, sagging positive, over thirty years. Jacked once it ends at 29.6 kN·m. Read and reset every year for five years, the resets are 17.8, −23.2, −10.6, −5.3, −4.9 kN·m and the joint ends at 12.4. Left alone until the fifth reading's date and reset once there, by −27.9, it ends at 11.4. Deflection

The last reading is the one that counts

Jacks left in under a precast continuity joint can be read and reset every year, each reset made with one more year of evidence. The programme does not converge on its target the way that sounds. Whatever the earlier resets did, the joint ends where the design model's error after the last reading puts it — an early slab in humid air ends at 12.4 kN·m after five annual resets and at 11.4 after one reset on the fifth reading's day, having moved the jacks less than half as far. Resetting the joint to nothing every year instead keeps it near nothing all the way, and buys a path the joint never needed.

A stream of mixed vehicles, both ways, through the middle post. For a six-panel Vierendeel girder 12 m long and 1.5 m deep, crossed node by node along its top chord: the bending stress at the top corner of its middle post through the first twelve vehicles of a stream drawn at random from five classes — 100 kN on two axles 4.5 m apart, 80 kN on two 6 m apart, 60 kN on one, 40 kN on two 3 m apart and 20 kN on one — each crossing left to right or right to left with equal chance: 100→, 60←, 20→, 60→, 20→, 20→, 20←, 40→, 20←, 20←, 20→, 80→ kN. The girder is unloaded between vehicles, so every crossing starts and ends at nothing. Structural form

The traffic that comes the other way

Counting a Vierendeel girder's fatigue vehicle by vehicle assumes the order of the traffic does not matter. Counted instead as one history, by rainflow across 2,000 mixed vehicles, the order turns out not to matter at all to any member whose stress keeps one sign, and to matter by under a per cent to the posts whose stress reverses — so long as the traffic goes one way. Traffic in both directions changes the count, and in the safe direction: a vehicle crossing the other way swings the middle post down where its neighbour swung it up, the unloaded girder between them splits a swing in two, and the whole stream does three per cent less than its vehicles counted apart.

All themes