Ring compression — where it appears
Named by 2 essays across 2 fields — each of them below, with the objects they name alongside it.
The lining that is stronger for being weaker
A tunnel lining is not loaded. The ground arrives already stressed and the hole wants to squash into an ellipse; the lining's only job is to refuse, and how much moment it collects depends entirely on how hard it refuses. Make it stiffer and it takes more. Make it flexible — put joints in it, make it thin — and it takes almost none, while the hoop thrust it carries does not move at all.
The pipe decides what the soil weighs
A buried conduit is not loaded by the soil above it. It is loaded by whatever share of that soil the relative movement leaves it — and which way the shear on the sides of the prism acts depends on whether the conduit settles more or less than the ground beside it. Two identical pipes under identical fill, one carrying two thirds of the prism and one carrying nearly twice it.
Named alongside it
The objects these essays reach for when they reach for this one.
Earth pressureImposed deformationStiffnessBuried conduitConstruction sequenceFlexibility ratioFlexible pipeFree bodyFrictionHoop tensionJoint stiffnessLoad sharing