Moment envelope — where it appears
Named by 8 essays across 3 fields — each of them below, with the objects they name alongside it.
Where to put the supports, which is not at the ends
Moving the supports of a uniformly loaded beam inward by about a fifth of its length halves the worst bending moment. The load has not changed and nor has the beam.
The moment over the support, and what it buys
Run a beam over its supports instead of stopping at each one, and the mid-span moment falls by a third while a new moment appears where there was none. Nothing was added but continuity.
The worst place to stand
A bridge is not designed for a load. It is designed for a load that moves, and for every station along it there is a different position of that load that does the most damage.
The train that is worse than its heaviest axle
An influence line says where to stand one load. A vehicle is several loads at fixed spacings, and the worst arrangement never puts the heaviest one at the peak.
Where a bar may stop
The moment diagram falls away from midspan, so the steel midspan needs is not needed everywhere, and curtailing it saves real money. Then two things get in the way, and between them they take nine tenths of what the moment diagram promised.
Every section was somewhere else
A bridge pushed out over its piers subjects each of its cross-sections to a history rather than to a load case. Every one passes over every support and through every span, so the design envelope is the envelope of envelopes — and no in-service condition produces it.
The shear whole spans cannot find
A continuous beam is designed by loading its spans in patterns, whole spans at a time, and for the bending moment that is very nearly exact: the moment's influence line keeps one sign over each span, so a span is either worth loading or not. The shear's influence line changes sign at the section itself, inside the span, and no pattern of whole spans can load one side of a section and not the other. At the middle of the inner span of three equal spans the imposed shear is 0.198 qL; whole spans find 0.083 qL, and the straight line to qL/8 that is safe on a simple span finds 0.125.
Two hinges let in and nothing lost
Continuity is usually sold as the reason to avoid hinges: a continuous beam shares its moment over the supports, and a chain of simple spans wastes it. Heinrich Gerber's 1866 bridge showed that the choice is not between those two. Put two hinges in the right places and the beam becomes statically determinate, a support can settle as far as it likes without moving a single moment, and under a pattern of moving load the largest moment comes out lower than the continuous beam's. What has been spent is something a moment diagram does not show: if one of those hinges fails, there is no other way for the load to reach the ground.
Named alongside it
The objects these essays reach for when they reach for this one.
Pattern loadingContinuityInfluence lineAxle trainBending momentHogging and saggingLoad arrangementMoving loadPoint of contraflexureAnchorageBarre ruleCantilever