Concept

Lifting — where it appears

Picking up a precast or steel member by slings, loops or lugs at chosen points, so that it hangs from them as a beam with overhangs. The lifting points set its moments and its stability, and a slew or a sling angle adds loads the member never sees in service.

Named by 2 essays across one field — each of them below, with the objects they name alongside it.

Out of the bed, the beam loses its own weight's help. For the 12 m pretensioned beam, 300 × 700 mm, with eight strands at 220 mm below its centroid: its self-weight moment along its length in kN·m, sagging positive — in the casting bed, which holds it at its ends (dashed), and on bearers 1.0 m in from each end (solid). Over the cantilevers the stored beam hogs, 2.6 kN·m at the bearers; between them its moment is the bed's less a constant 31.5 kN·m, the bearers' reactions acting a metre closer in. Mid-span drops from 94.5 to 63.0. That constant is the relief the top fibre loses everywhere between the bearers: 1.29 N/mm² for each metre of inset.

The beam that leaves the bed

A pretensioned beam's debonding is designed for the moment its strands are cut, when the casting bed holds it at its ends and its own weight is the largest relief its top fibre will get. Then it is lifted by loops a little in from its ends and stored on bearers a little further in. Setting the supports a metre in takes 31.5 kN·m off the self-weight moment along the whole length between them, not just at the ends, and the schedule that passed transfer with 0.07 N/mm² to spare has room for 51 mm of it. In the yard's conditions the bearers may come in 0.57 m; a metre in needs a third strand sleeved, and past 2.2 m nothing does.

sections · Prestress limits
The road is the harshest stretch of the beam's journey. The worst top fibre, at any corner of any section, of the 12 m pretensioned beam, 300 × 700 mm, with eight strands, its schedule drawn for the bed and for yard bearers 1.0 m in from each end, in N/mm² with tension negative: on the yard's bearers; on the haulier's trailer, 1.5 m and 2.5 m from its ends with a bounce of ±30 per cent; lifted by loops 1.0 m in from each end on slings at 60° with a snatch of ±20 per cent; slewed at 0.10 g; and set down on bearings sloping 1 per cent across it; dashed, the stored concrete's limit of −3.0. Yard bearers, −2.98; trailer, −4.88; lifted, −2.97; slewed, −3.13; set down, −1.79.

The beam hung from its loops

A pretensioned beam is cast in a bed, stored on bearers, hauled on a trailer and then lifted by a crane onto its bearings — and at every stage its top fibre, which the strands put in tension, has to stay inside the limit its debonding schedule was drawn for. The trailer, with a bouncing wheel and supports where the haulier put them, was the harshest stage the yard essays found. The last few metres, from the trailer to the bearings, are gentler: hung from loops at the yard's bearer positions the beam is on its bearers again, set down it is on the support its middle was designed for, and only a slew of the crane pushes it a little past its limit. Where the loops are cast decides how much margin the lift has, and the best place for them is not where the yard put its bearers but where the bed held the beam: at its ends.

sections · Prestress limits

Named alongside it

The objects these essays reach for when they reach for this one.

CantileverDebondingPrestressPretensioningTransferCable zoneImpact factorSelf-weightWeak axis

All concepts