Two triangles that cross zero, and a block that does not
Two triangles that cross zero, and a block that does not. Stress across a 300 × 700 mm section at each stage, compression positive. The prestress alone gives -6.33 MPa at the top and 20.61 at the bottom; at transfer, with only self-weight on it, the top is at -2.47 MPa and in service the section runs from 7.61 to 3.82 MPa — compression everywhere. The same beam with no prestress reaches -12.67 MPa at the bottom fibre, which is 4.2 times what the concrete can hold.
20 essays call
prestress-section. The drawing above is what it returns with no arguments at all; every
call below passes it something, because a placement that passes nothing draws whichever
member of the family the generator happens to default to rather than the one its essay
argues about.
Where it is called
Changing this generator changes every one of these figures.
The load put on backwards
Every other structure in this collection waits for its load and then resists it. A prestressed one is given a load first — chosen, permanent, and pointing the wrong way — so that when the real one arrives the two nearly cancel and the material never has to do the thing it is bad at.
The middle third
A material that cannot be pulled imposes a condition on where the load may land, and the condition is a region rather than a point. For a rectangle it is the famous middle third; for every other section it is a shape nobody quotes, and one ordinary section's is nearly twice as generous as the rule allows.
The structure that was never complete
Every analysis in this collection is of a finished structure loaded once. Real ones are built in pieces, and each piece carries whatever was present at the moment it became structural — so the stress in a member depends on when it arrived, which appears nowhere on any drawing.
The prestress that pushes back
On a simply supported beam a tendon is an internal matter and changes no reaction. Put the same beam on three supports and the tendon lifts it off the middle one, the support refuses, and the force it takes to hold the beam down is a reaction produced with no load applied at all.
Four inequalities and a wedge
A prestressed section has to satisfy two stress limits when the force is largest and the load smallest, and two more when the force has relaxed and the load has arrived. Each is linear in one over the force — which turns a search for a prestress into a region on a page, and turns an impossible section into an empty one.
The web that carries no bending
A corrugated web needs no stiffeners, because the folds give it in one direction a depth it does not have in its thickness. In the other direction the same folds make it an accordion — and a web that cannot be stretched cannot carry a bending stress at all.
Where the steel is, not how much of it
A section in bending resists a moment with a couple, and a couple is a force times a distance. The force is bought — it is an area of steel at a stress. The distance is free, decided by where the bars were put, and it is the variable almost nobody optimises because it does not appear on an order.
The load that comes from changing direction
A force that travels in a straight line asks nothing of anything. Bend its path and it asks for a transverse load of F over R along every millimetre of the curve, and that load is real, is nowhere on the load schedule, and is the same statement behind a prestressing tendon, a hoop force, an arch thrust and a web that buckles with nothing applied to it.
The crack that never reached forty-five degrees
Every shear expression for reinforced concrete is a curve fitted to tests, because a cracked section has no free body worth drawing. An uncracked prestressed web has one — a single point, a Mohr's circle and a principal tension — and it is the only shear check in the subject that is derived rather than measured.
The tendon that can be moved
Lift a continuous beam's tendon at its interior support without changing its drape and nothing about the beam's total moment changes. The primary falls, the secondary rises by exactly as much, and the pressure line stays where it was — which turns a parasitic effect into a quantity a designer can place.
The flange the prestress cannot use
The four stress limits on a prestressed section pair up by fibre: the bottom fibre has to hold the service tension and the transfer compression from the same force, and the top fibre the service compression and the transfer tension. Each pair is possible only if that fibre's own section modulus is large enough, whatever the eccentricity. On a symmetric section the two pairs are close to balanced. On a tee they are not: its wide flange multiplies the top fibre's modulus and hardly touches the bottom's, so a tee with half as much concrete again as a symmetric I cannot be prestressed for a load the I carries.
The relief that belongs to the pressure line
An inclined tendon carries part of a prestressed beam's shear, and the rule is to subtract its vertical component, P times the slope of the tendon. In a continuous beam the tendon also provokes reactions, and the reactions make a shear of their own — a constant in each span, too small to look at. It is not small where it matters. Beside the end support of a two-span beam it doubles the shear left for the links, and moving the tendon without changing the beam at all can make the tendon's slope report that there is none.
The strands that are sleeved at the ends
A post-tensioned tendon can be draped up towards the centroid near the supports, where the self-weight moment that made its eccentricity safe has gone. A pretensioned strand cannot: it runs straight between the abutments of the casting bed. Choose eight strands at 220 mm below the centroid of a 12 m beam and mid-span passes every limit at transfer, while a metre in from each end the top fibre cracks. The cure is to stop some strands gripping the concrete near the ends, and how many is a trade: every strand saved at mid-span by lowering the strands is a strand to sleeve at the ends.
The beam that leaves the bed
A pretensioned beam's debonding is designed for the moment its strands are cut, when the casting bed holds it at its ends and its own weight is the largest relief its top fibre will get. Then it is lifted by loops a little in from its ends and stored on bearers a little further in. Setting the supports a metre in takes 31.5 kN·m off the self-weight moment along the whole length between them, not just at the ends, and the schedule that passed transfer with 0.07 N/mm² to spare has room for 51 mm of it. In the yard's conditions the bearers may come in 0.57 m; a metre in needs a third strand sleeved, and past 2.2 m nothing does.
The beam at the bottom of the stack
A precast yard stacks pretensioned beams to save space, each on bearers resting on the one below. If the bearers line up, the weight above goes straight down through them and the bottom beam never knows it is there. If they land outside its own bearers, the stack hogs the bottom beam at every section between them and takes from its top fibre relief that its debonding schedule had already spent. A schedule built for the yard leaves the bearers of a stack of three seven millimetres to be out of line. A bottom beam with a schedule of its own can be given half a metre.
The beam stressed one bay at a time
A long continuous beam is rarely stressed in one pull. It is cast and stressed a bay at a time, each new length of tendon coupled to the last, and at every stage the structure is a different beam. The secondary moments the finished beam carries are the sum of what each stage did to the beam that existed then — about half of what the one-stage analysis gives — and creep spends the following years taking most of the other half back.
The beam built towards its own middle
A continuous prestressed beam built one bay at a time from one end keeps about half the secondary moment a beam stressed at once would carry, and most of it at the end where it was finished. Built from both ends towards a closure bay, it is symmetric, and the closure's supports keep only a little more than the rest: 172 kN·m against 161. Built from the middle outwards, the first interior supports — the ones the load hogs hardest — keep 215, 63 per cent of the at-once value, for any length of beam. The order of construction is a design variable. Creep then takes back most of the choice.
The beam the haulier holds
A pretensioned beam leaves the yard on a trailer, carried on a turntable and a bogie the haulier places, and bounced on them at road speed. The bounce works both ways: a wheel rising adds to the beam's weight over its overhangs, and a wheel falling away takes weight off — and with it the sag that was relieving the beam's top fibre between its supports. On the yard's own bearers a bounce of 30 per cent takes as much from that fibre as a stack placed 100 mm out of line. A rear overhang of 2.5 m takes five times as much. With the yard's schedule, a trailer may hold this beam only within half a metre and three quarters of a metre of its ends.
Internal forcesThe jack that creep carries past the mark
A continuous beam built from both ends towards a closure bay keeps less secondary moment at its supports than the same beam stressed all at once, and creep gives back three-quarters of the difference over the years. Bridge builders do not always wait: before the closure is cast, the supports can be lowered on jacks so that the beam starts with the moments it would have had. Jacked by the whole difference, it does start there — and creep, which goes on returning the staged deficit while it relaxes the jacked correction, carries it past them, by a seventh of what was jacked. Jacked by 0.89 of the difference, it starts a ninth short and ends a ninth over. And it takes a jack at every interior support: with fewer, the moment goes to the wrong places.
Sections and stressThe beam hung from its loops
A pretensioned beam is cast in a bed, stored on bearers, hauled on a trailer and then lifted by a crane onto its bearings — and at every stage its top fibre, which the strands put in tension, has to stay inside the limit its debonding schedule was drawn for. The trailer, with a bouncing wheel and supports where the haulier put them, was the harshest stage the yard essays found. The last few metres, from the trailer to the bearings, are gentler: hung from loops at the yard's bearer positions the beam is on its bearers again, set down it is on the support its middle was designed for, and only a slew of the crane pushes it a little past its limit. Where the loops are cast decides how much margin the lift has, and the best place for them is not where the yard put its bearers but where the bed held the beam: at its ends.