Generator

Two triangles that cross zero, and a block that does not

Rendered here at the parameters it defaults to, with every essay that calls it — which is the same list as the blast radius of changing it.
Two triangles that cross zero, and a block that does not. Stress across a 300 × 700 mm section at each stage, compression positive. The prestress alone gives -6.33 MPa at the top and 20.61 at the bottom; at transfer, with only self-weight on it, the top is at -2.47 MPa and in service the section runs from 7.61 to 3.82 MPa — compression everywhere. The same beam with no prestress reaches -12.67 MPa at the bottom fibre, which is 4.2 times what the concrete can hold.

Two triangles that cross zero, and a block that does not. Stress across a 300 × 700 mm section at each stage, compression positive. The prestress alone gives -6.33 MPa at the top and 20.61 at the bottom; at transfer, with only self-weight on it, the top is at -2.47 MPa and in service the section runs from 7.61 to 3.82 MPa — compression everywhere. The same beam with no prestress reaches -12.67 MPa at the bottom fibre, which is 4.2 times what the concrete can hold.

20 essays call prestress-section. The drawing above is what it returns with no arguments at all; every call below passes it something, because a placement that passes nothing draws whichever member of the family the generator happens to default to rather than the one its essay argues about.

Where it is called

Changing this generator changes every one of these figures.

Two triangles that cross zero, and a block that does not. Stress across a 300 × 700 mm section at each stage, compression positive. The prestress alone gives -6.33 MPa at the top and 20.61 at the bottom; at transfer, with only self-weight on it, the top is at -2.47 MPa and in service the section runs from 7.61 to 3.82 MPa — compression everywhere. The same beam with no prestress reaches -12.67 MPa at the bottom fibre, which is 4.2 times what the concrete can hold. Internal forces

The load put on backwards

Every other structure in this collection waits for its load and then resists it. A prestressed one is given a load first — chosen, permanent, and pointing the wrong way — so that when the real one arrives the two nearly cancel and the material never has to do the thing it is bad at.

The middle third, computed. The kern of a 400 × 600 mm rectangle, computed by asking, for every direction, how far the resultant can move before the far face would be pulled. It reaches ±100.0 mm vertically and ±66.7 mm horizontally, which are h/6 and b/6 exactly, and the region between is a rhombus rather than the ellipse the two numbers suggest — a resultant on a diagonal has less room than either axis allows. Sections and stress

The middle third

A material that cannot be pulled imposes a condition on where the load may land, and the condition is a region rather than a point. For a rectangle it is the famous middle third; for every other section it is a shape nobody quotes, and one ordinary section's is nearly twice as generous as the rule allows.

The props decide where the stress ends up. Bottom-fibre stress in the steel of a 12 m composite beam carrying 12 kN/m of wet concrete and 18 kN/m afterwards. Unpropped, the bare steel takes the first stage alone and reaches 292 MPa; propped, the finished composite section takes everything and reaches 186 MPa — a ratio of 1.57. 62% of the unpropped beam's final stress was locked in before the slab was structural at all. The deflections differ by 1.73 times for the same reason, and no drawing of the finished beam distinguishes the two. Structural form

The structure that was never complete

Every analysis in this collection is of a finished structure loaded once. Real ones are built in pieces, and each piece carries whatever was present at the moment it became structural — so the stress in a member depends on when it arrived, which appears nowhere on any drawing.

A reaction with no load, and the moment it bends the beam with. The prestress moments in a 2-span beam. The primary moment is −P·e, the tendon acting on its own section, and it reaches 540 kNm over the middle support. The secondary moment is what is left when the primary is taken off the total, and it is 306 kNm — 57% of the primary, with the same sign, so it does not cancel anything. It comes from the middle support refusing to let the beam lift: 51.0 kN pressing down there and 25.5 kN lifting at each end, a reaction set that sums to -2e-13 because nothing external was applied. Its diagram is straight between supports to 2.0e-13% of its own peak, which it has to be: reactions are point forces and a point force puts no curvature in a span. Internal forces

The prestress that pushes back

On a simply supported beam a tendon is an internal matter and changes no reaction. Put the same beam on three supports and the tendon lifts it off the middle one, the support refuses, and the force it takes to hold the beam down is a reaction produced with no load applied at all.

Four inequalities, and the wedge between them. The Magnel diagram: every limit on a prestressed section, plotted as a bound on 1/P against the eccentricity. Two of the four come from transfer, when the force is largest and the only moment is the beam's own weight, and two from service, when 20% of the force has been lost and the moment is 640 kNm. Each is linear in 1/P, which is the substitution that makes the problem a picture rather than a search. The shaded region is every force-and-eccentricity pair the section will accept: it is a wedge opening to the right, so the cheapest prestress is always at the largest eccentricity the cover allows — 1029 kN at e = 400 mm here. The section's kern is 241 mm, and every useful answer is outside it. Sections and stress

Four inequalities and a wedge

A prestressed section has to satisfy two stress limits when the force is largest and the load smallest, and two more when the force has relaxed and the load has arrived. Each is linear in one over the force — which turns a search for a prestress into a region on a page, and turns an impossible section into an empty one.

Pull it along the girder and it just unfolds. One period of a 30° trapezoidal corrugation, 300 mm of flat and 260 mm of incline, and the same period pulled along the girder's axis. The fold opens by bending the inclined panels out of the web's own plane, so the axial flexibility contains the plate's t³ where a flat web's would contain t — and the effective modulus that comes back from solving the cell as a frame is 222 N/mm², which is 10.6 parts in ten thousand of the steel's 210 GPa. A web with a thousandth of the stiffness carries a thousandth of the stress, which is why the flanges of a corrugated girder carry the whole moment and why the section has 9 per cent less second moment than the flat-webbed girder it replaces. The fold buys freedom from stiffeners and pays for it here. Sections and stress

The web that carries no bending

A corrugated web needs no stiffeners, because the folds give it in one direction a depth it does not have in its thickness. In the other direction the same folds make it an accordion — and a web that cannot be stretched cannot carry a bending stress at all.

The neutral axis is wherever the first moment vanishes. A 300 by 600 section with 1800 mm² of steel at a depth of 540, carrying 250 kNm after the tension side has cracked. The neutral axis is no longer at mid-depth: it has risen to 234.5 mm from the top, which is where the first moment of the compression zone plus the transformed steel vanishes. The compression is 15.4 N/mm² at the top fibre and the steel carries 301 N/mm²; the resulting couple is 541 kN on a lever arm of 462 mm, which multiplies back to the 250 kNm applied. The uncracked section would have had 6673×10⁶ mm⁴ against the cracked 3809×10⁶ — a loss of 43% of the stiffness. Sections and stress

Where the steel is, not how much of it

A section in bending resists a moment with a couple, and a couple is a force times a distance. The force is bought — it is an area of steel at a stress. The distance is free, decided by where the bars were put, and it is the variable almost nobody optimises because it does not appear on an order.

The tendon is a load, pointing the other way. A 14 m beam with a parabolic tendon dropping 260 mm to midspan, stressed to 1440 kN after losses. Its curvature pushes the beam up along its whole length with an intensity of 8Pe/L² = 15.28 kN/m, against an applied 17.63 kN/m — so 2.34 kN/m is left to bend anything, and the beam carries 57.4 kNm where an unstressed one carries 432 kNm. What the section then feels is 6.40 MPa of uniform compression and very little else. Internal forces

The load that comes from changing direction

A force that travels in a straight line asks nothing of anything. Bend its path and it asks for a transverse load of F over R along every millimetre of the curve, and that load is real, is nowhere on the load schedule, and is the same statement behind a prestressing tendon, a hoop force, an arch thrust and a web that buckles with nothing applied to it.

Prestress buys shear as a square root, not as a sum. The shear stress an uncracked web can take before the principal tension reaches the concrete's tensile strength, against the axial compression the prestress put there. With no prestress it is 1.35 N/mm², the tensile strength itself, because pure shear has a principal tension of exactly its own magnitude at forty-five degrees. Adding compression gives √(f_ct² + σ_cp·f_ct), which is a square root and therefore flattens: the first newton of prestress is worth far more than the last. At the 7.14 N/mm² drawn the limit is 3.39 N/mm², a gain of 2.51, and doubling the prestress from there takes it only to 4.59. The straight line is what a rule that simply added the two strengths would have promised. Internal forces

The crack that never reached forty-five degrees

Every shear expression for reinforced concrete is a curve fitted to tests, because a cracked section has no free body worth drawing. An uncracked prestressed web has one — a single point, a Mohr's circle and a principal tension — and it is the only shear check in the subject that is derived rather than measured.

A reaction with no load, and the moment it bends the beam with. The prestress moments in a 2-span beam. The primary moment is −P·e, the tendon acting on its own section, and it reaches 1440 kNm over the middle support. The secondary moment is what is left when the primary is taken off the total, and it is 720 kNm — 50% of the primary, with the same sign, so it does not cancel anything. It comes from the middle support refusing to let the beam lift: 102.9 kN pressing down there and 51.4 kN lifting at each end, a reaction set that sums to 0e+0 because nothing external was applied. Its diagram is straight between supports to 3.6e-13% of its own peak, which it has to be: reactions are point forces and a point force puts no curvature in a span. Internal forces

The tendon that can be moved

Lift a continuous beam's tendon at its interior support without changing its drape and nothing about the beam's total moment changes. The primary falls, the secondary rises by exactly as much, and the pressure line stays where it was — which turns a parasitic effect into a quantity a designer can place.

Each fibre has to earn its own prestress. For each section on a 12 m span carrying its own weight and 20 kN/m more: bars, the top and bottom moduli it has; ticks, the moduli its two pairs of limits need — the top fibre holding the service compression and the transfer tension, the bottom holding the service tension and the transfer compression, both from the same prestress. The symmetric I: top 28.9 against 17.4 needed, bottom 28.9 against 23.5 (× 10⁶ mm³) — a prestress exists; the tee: top 48.5 against 17.8 needed, bottom 22.7 against 24.0 (× 10⁶ mm³) — no prestress exists; the bulb-tee: top 46.0 against 17.7 needed, bottom 37.4 against 23.8 (× 10⁶ mm³) — a prestress exists. Sections and stress

The flange the prestress cannot use

The four stress limits on a prestressed section pair up by fibre: the bottom fibre has to hold the service tension and the transfer compression from the same force, and the top fibre the service compression and the transfer tension. Each pair is possible only if that fibre's own section modulus is large enough, whatever the eccentricity. On a symmetric section the two pairs are close to balanced. On a tee they are not: its wide flange multiplies the top fibre's modulus and hardly touches the bottom's, so a tee with half as much concrete again as a symmetric I cannot be prestressed for a load the I carries.

The shear is read from the pressure line, not the tendon. The first 9.6 m of a two-span beam of 16 + 16 m, 400 × 900 mm, prestressed with 2,400 kN on a parabolic tendon and carrying 45 kN/m, with depths drawn from the top face (−450 mm) to the bottom (+450 mm): the tendon's centre (dashed) and the pressure line, where the resultant of the prestress actually acts once the supports have pushed back (solid). 0.8 m from the support the tendon falls 87.00 mm per metre, which is the slope the rule P·sin θ reads, worth 209 kN; the pressure line falls 76.39 mm per metre, worth 183 kN. The difference is the secondary shear, 26 kN, which the supports put back. Internal forces

The relief that belongs to the pressure line

An inclined tendon carries part of a prestressed beam's shear, and the rule is to subtract its vertical component, P times the slope of the tendon. In a continuous beam the tendon also provokes reactions, and the reactions make a shear of their own — a constant in each span, too small to look at. It is not small where it matters. Beside the end support of a two-span beam it doubles the shear left for the links, and moving the tendon without changing the beam at all can make the tendon's slope report that there is none.

The force each section may carry rises from the end, and the strands must climb under it. The prestress each section of a pretensioned beam 300 × 700 mm spanning 12 m, with eight strands of 125 kN at 220 mm below its centroid may carry at transfer without its top fibre passing −2.50 N/mm² or its bottom 18 (thick), against the distance from the end: 739 kN at 0.5 m, 1,101 at 2 m, 1,507 at mid-span, where the self-weight moment is largest. All eight strands bonded from the end give 1,000 kN once their transmission length is past (dashed), which the beam can carry only near mid-span. Debonded — six bonded from the end, one debonded for 0.50 m, one debonded for 1.00 m — their force (solid) climbs in steps that stay under the line everywhere. Sections and stress

The strands that are sleeved at the ends

A post-tensioned tendon can be draped up towards the centroid near the supports, where the self-weight moment that made its eccentricity safe has gone. A pretensioned strand cannot: it runs straight between the abutments of the casting bed. Choose eight strands at 220 mm below the centroid of a 12 m beam and mid-span passes every limit at transfer, while a metre in from each end the top fibre cracks. The cure is to stop some strands gripping the concrete near the ends, and how many is a trade: every strand saved at mid-span by lowering the strands is a strand to sleeve at the ends.

Out of the bed, the beam loses its own weight's help. For the 12 m pretensioned beam, 300 × 700 mm, with eight strands at 220 mm below its centroid: its self-weight moment along its length in kN·m, sagging positive — in the casting bed, which holds it at its ends (dashed), and on bearers 1.0 m in from each end (solid). Over the cantilevers the stored beam hogs, 2.6 kN·m at the bearers; between them its moment is the bed's less a constant 31.5 kN·m, the bearers' reactions acting a metre closer in. Mid-span drops from 94.5 to 63.0. That constant is the relief the top fibre loses everywhere between the bearers: 1.29 N/mm² for each metre of inset. Sections and stress

The beam that leaves the bed

A pretensioned beam's debonding is designed for the moment its strands are cut, when the casting bed holds it at its ends and its own weight is the largest relief its top fibre will get. Then it is lifted by loops a little in from its ends and stored on bearers a little further in. Setting the supports a metre in takes 31.5 kN·m off the self-weight moment along the whole length between them, not just at the ends, and the schedule that passed transfer with 0.07 N/mm² to spare has room for 51 mm of it. In the yard's conditions the bearers may come in 0.57 m; a metre in needs a third strand sleeved, and past 2.2 m nothing does.

The yard's schedule has no room for the beams above. For the 12 m pretensioned beam, 300 × 700 mm, with eight strands, stored on bearers 1.0 m in from each end, debonded for the bed and the yard, with two beams stacked on it: the top fibre's stress along half the beam, N/mm², compression positive, with the stack lined up and landing 100 and 250 mm outside its bearers; dotted, the yard's limit of −3.0. Lined up, the worst is −2.98; 100 mm out, −3.24; 250 mm out, −3.63. Every beam above costs the top fibre 0.13 N/mm² for every 100 mm, at every section between the bearers. Sections and stress

The beam at the bottom of the stack

A precast yard stacks pretensioned beams to save space, each on bearers resting on the one below. If the bearers line up, the weight above goes straight down through them and the bottom beam never knows it is there. If they land outside its own bearers, the stack hogs the bottom beam at every section between them and takes from its top fibre relief that its debonding schedule had already spent. A schedule built for the yard leaves the bearers of a stack of three seven millimetres to be out of line. A bottom beam with a schedule of its own can be given half a metre.

Stressed bay by bay, the beam keeps half its secondary moment. The secondary moment along a 4-span beam of 16 + 16 + 16 + 16 m prestressed with 2,400 kN on a parabolic tendon, straight between supports: stressed in one operation, stressed one bay at a time, and bay by bay after creep with a coefficient of 2.0. At the first interior support it is 350 kN·m stressed at once, 164 bay by bay and 307 after creep; at the next, 234, 160 and 216. Internal forces

The beam stressed one bay at a time

A long continuous beam is rarely stressed in one pull. It is cast and stressed a bay at a time, each new length of tendon coupled to the last, and at every stage the structure is a different beam. The secondary moments the finished beam carries are the sum of what each stage did to the beam that existed then — about half of what the one-stage analysis gives — and creep spends the following years taking most of the other half back.

The order of building decides which supports keep the secondary moment. The secondary moment at each interior support of a five-span beam of 16 + 16 + 16 + 16 + 16 m prestressed with 2,400 kN on a parabolic tendon, built and stressed from one end, from both ends towards a closure bay, from the middle outwards, and all at once. From one end: 161, 175, 160, 219 kN·m; from both ends: 161, 172, 172, 161 kN·m; from the middle out: 215, 120, 120, 215 kN·m; all at once: 344, 258, 258, 344 kN·m. Internal forces

The beam built towards its own middle

A continuous prestressed beam built one bay at a time from one end keeps about half the secondary moment a beam stressed at once would carry, and most of it at the end where it was finished. Built from both ends towards a closure bay, it is symmetric, and the closure's supports keep only a little more than the rest: 172 kN·m against 161. Built from the middle outwards, the first interior supports — the ones the load hogs hardest — keep 215, 63 per cent of the at-once value, for any length of beam. The order of construction is a design variable. Creep then takes back most of the choice.

On the road the beam's top fibre has nothing left. The top fibre along the 12 m pretensioned beam, 300 × 700 mm, with eight strands, its schedule drawn for the bed and for yard bearers 1.0 m in from each end, the worst of the two bounces at each section: on its yard bearers standing still and bouncing ±30 per cent, and on a trailer carrying it 1.5 m from its front end and 2.5 m from its rear standing still and bouncing; dotted, the yard's limit of −3.0 N/mm². Yard bearers, still, −2.98 at 2.0 m; yard bearers, ±30 per cent, −3.26 at 9.8 m; trailer, still, −4.68 at 9.5 m; trailer, ±30 per cent, −4.88 at 9.5 m. Sections and stress

The beam the haulier holds

A pretensioned beam leaves the yard on a trailer, carried on a turntable and a bogie the haulier places, and bounced on them at road speed. The bounce works both ways: a wheel rising adds to the beam's weight over its overhangs, and a wheel falling away takes weight off — and with it the sag that was relieving the beam's top fibre between its supports. On the yard's own bearers a bounce of 30 per cent takes as much from that fibre as a stack placed 100 mm out of line. A rear overhang of 2.5 m takes five times as much. With the yard's schedule, a trailer may hold this beam only within half a metre and three quarters of a metre of its ends.

Internal forces

The jack that creep carries past the mark

A continuous beam built from both ends towards a closure bay keeps less secondary moment at its supports than the same beam stressed all at once, and creep gives back three-quarters of the difference over the years. Bridge builders do not always wait: before the closure is cast, the supports can be lowered on jacks so that the beam starts with the moments it would have had. Jacked by the whole difference, it does start there — and creep, which goes on returning the staged deficit while it relaxes the jacked correction, carries it past them, by a seventh of what was jacked. Jacked by 0.89 of the difference, it starts a ninth short and ends a ninth over. And it takes a jack at every interior support: with fewer, the moment goes to the wrong places.

Sections and stress

The beam hung from its loops

A pretensioned beam is cast in a bed, stored on bearers, hauled on a trailer and then lifted by a crane onto its bearings — and at every stage its top fibre, which the strands put in tension, has to stay inside the limit its debonding schedule was drawn for. The trailer, with a bouncing wheel and supports where the haulier put them, was the harshest stage the yard essays found. The last few metres, from the trailer to the bearings, are gentler: hung from loops at the yard's bearer positions the beam is on its bearers again, set down it is on the support its middle was designed for, and only a slew of the crane pushes it a little past its limit. Where the loops are cast decides how much margin the lift has, and the best place for them is not where the yard put its bearers but where the bed held the beam: at its ends.

The library, page 4 of 7 — where prestress-section sits