Tension pile — where it appears
Named by 2 essays across one field — each of them below, with the objects they name alongside it.
A basement is a boat
Every load in this collection presses down and is resisted by strength. Hydrostatic uplift presses up, is resisted by weight, and does not care what is built on it — so the check contains no material property at all. It is a ratio of two weights, and one of them is water.
The water that comes back while the floors go up
A basement below the water table is built dry, inside an excavation kept pumped, and the building that will one day hold it down is not there yet. When the pumps stop, the water comes back over days and the frame goes up a floor a week, and the basement is safe only if the weight stays ahead of the water at every instant. How long the pumps must run is not set by how heavy the building is. It is set by one ratio — how much weight the frame adds while the ground refills — and for a basement that needs five floors on it to hold itself down, a seven-day recovery asks for three and a fourteen-day one for one.
Named alongside it
The objects these essays reach for when they reach for this one.
Hydrostatic pressureUpliftBallastBuoyancyConstruction sequenceControl perimeterDrainageEffective depthEquilibriumFactor of safetyFlotationFree body