Settlement trough — where it appears
Named by 2 essays across one field — each of them below, with the objects they name alongside it.
The building the trough cannot bend
A tunnel leaves a settlement trough, and damage criteria are applied to the trough's deflection ratio over the length of each building above it. But a building is not the ground: it has a bending stiffness, and it takes only as much of the ground's curvature as that stiffness lets it. One number decides how much — the building's stiffness over the soil's modulus times its length to the fourth — and over two decades of it a building goes from following the trough to bridging it. Because the length enters to the fourth power, the same building is stiff when short and soft when long.
The building the trough twists
A building that crosses a tunnel's settlement trough at an angle stands on ground that is warped as well as sagged. Its four corners do not settle into a plane, and beyond about twenty degrees of skew the warp is larger than the sag. Whether the building follows that warp or resists it depends on a property its bending never needed — whether its walls and floors close into a tube — and the same walls, closed or open, differ a thousandfold in their stiffness against it.
Named alongside it
The objects these essays reach for when they reach for this one.
Deflection ratioDifferential settlementElastic foundationRelative stiffnessDiaphragmHoggingSaggingShear flowStiffnessTorsional constant