The load must go somewhere — page 15
The panel a soft joint empties into the span
Under a load on one bay, an interior column's web panel carries the difference between the two beams' moments. Make the beam-to-column joints semi-rigid and the panel is relieved — by 5 per cent at the stiffness EN 1993-1-8 still calls rigid, by a third at three times the beam's EI/L — because a softer joint takes less moment. The moment it does not take lands at mid-span, where the beam was not designed for it, and in sway it lands in the columns. And soften only some of a frame's joints, and the sway goes looking for the ones still stiff: their panels carry up to a quarter more than they would in an all-rigid frame.
The heavy chord the posts will not let work
A Vierendeel girder carries its shear as bending in its two chords, and when one chord is four times as stiff as the other the obvious rule gives it four fifths of the shear. With posts as stiff as the light chord it takes 0.56. The heavy chord's end moments have to be carried round each joint by a post, the post bends, and the heavy chord turns with its joints instead of bending between them. No amount of extra steel in that chord takes its share past 0.55 in the middle of a long girder; only the posts can, and they have to be about 150 times as stiff as the light chord to make the rule come true.
The water that comes back while the floors go up
A basement below the water table is built dry, inside an excavation kept pumped, and the building that will one day hold it down is not there yet. When the pumps stop, the water comes back over days and the frame goes up a floor a week, and the basement is safe only if the weight stays ahead of the water at every instant. How long the pumps must run is not set by how heavy the building is. It is set by one ratio — how much weight the frame adds while the ground refills — and for a basement that needs five floors on it to hold itself down, a seven-day recovery asks for three and a fourteen-day one for one.
The column on the other side of the joint
A partial-strength joint is sold as a fuse: it caps the moment a beam can put into its support at the joint's own resistance. At an interior column that is true. At the edge of a frame the column is not a support that stays still; it is a spring in series with the joint, so the joint delivers less than its resistance in service and almost exactly what a rigid joint would. The column then carries three times the moment the simple-construction rule gave it, and at the top storey, where it stands alone and is lightest, it is weaker than the joint it was meant to be protected by.
The slip the plastic moment asks of the studs
A composite beam with half the studs that full interaction needs still has 85 per cent of the full plastic moment, because the slab's compression block simply gets thinner and the steel finds its own neutral axis. That is the stress-block answer, and it assumes every stud slips as far as the beam asks. Follow the slip along the beam and the end studs of a 12 m beam need 6.6 mm to reach nine tenths of that moment and 9 mm to reach 95 per cent — past the 6 mm a stud is trusted to give. Require 6 mm and the Eurocode's minimum degree of shear connection comes out of the arithmetic, slope and all.
The strands that are sleeved at the ends
A post-tensioned tendon can be draped up towards the centroid near the supports, where the self-weight moment that made its eccentricity safe has gone. A pretensioned strand cannot: it runs straight between the abutments of the casting bed. Choose eight strands at 220 mm below the centroid of a 12 m beam and mid-span passes every limit at transfer, while a metre in from each end the top fibre cracks. The cure is to stop some strands gripping the concrete near the ends, and how many is a trade: every strand saved at mid-span by lowering the strands is a strand to sleeve at the ends.
The secondary beam that twists what it holds
A secondary beam framing into a twisting primary at mid-span is the best restraint a primary can have — concentrated exactly where the twist is. It is also a load: its reaction arrives on the primary's web, off the shear centre, as a torque at exactly the same place. Which wins is decided by the connection, and the threshold is low: a fin plate stiffer than about 33 kN·m per radian, a seventieth of what still counts as a pin, makes the secondary hold far more than it twists. The bolts' free play is another matter, because the torque acts from the first millimetre and the restraint only once the play is taken up.
The arm that ignores the shape of the wind
The outrigger arithmetic is usually done for a wind that is the same at every height, and real wind is not: it grows with height, and an earthquake's first mode loads a building as a triangle. The natural guess is that a load concentrated towards the top moves the best place for the arm. It barely does. Put the same total wind on a 200 m core as a uniform load, a power-law wind and a triangle, and the best level moves by just over one per cent of the height. What moves is the force in the arm — half as much again under the triangle — and how far the top goes, while the arm's own stiffness shifts its best level thirty times as far as the wind's shape does.
The counterweight that follows the jib
A counterweight that stays put balances one position and leaves the mast a moment at every other. Make it move and it can balance anything that moves slowly enough to be followed. On a luffing crane the thing that moves most is not the payload but the jib itself, whose own moment about the mast changes more than twice as much through its luff as the payload's ever is — and a counterweight linked to the luff cancels that change exactly. What it cannot cancel is the payload, which leaves the ground in a second. The best any counterweight can do with that is wait halfway, and the mast is left with half the payload's moment at the longest radius, whatever else the counterweight does.
The ends the ground was holding down
Winkler's springs pull as readily as they push, and on a long footing strip the linear answer quietly uses that: it has the ground holding the strip's ends down. Take the pull away and the correction under the column is modest — eight or nine per cent on the pressure and the moment — but the shape of the answer changes completely. A weightless strip longer than about eight metres keeps exactly eight metres of itself on the ground, whatever length was poured, and the rest rises off as straight cantilevers carrying nothing. The middle-third rule turns out to be a property of rigid footings: an eight-metre strip lifts at a fiftieth of the eccentricity the kern allows.
The backprop jacked tight lands on the floor below
A backprop put in snug shares only the load that arrives after it, and creep then pushes the young slab above onto it anyway. Jack it to a preload instead and the young slab is lifted at once — but the preload survives the week, so the lift lands on the slab below the moment the next level is struck, and about half of it is load creep would have moved within the week regardless. The best preload balances the week-old slab against the fortnight-old one, and with creep it is small: a fourteenth of a slab's weight, about six hundred newtons a prop. Anything over a fifth leaves the frame worse than snug. What a small preload does buy completely is immunity to slack.
The box that is a trough until its deck is cast
A composite tub girder is a box only once its concrete deck has hardened. Before that it is an open steel trough — two leaning webs and a bottom flange — whose shear centre lies seven hundred millimetres below its bottom flange, in the air, and whose resistance to twisting is the thickness of its plates cubed. A light truss across the top is what holds it together while the deck is poured, and it is a plate for shear and nothing else: an angle of ordinary size is worth half a millimetre of steel. That half-millimetre multiplies the trough's torsion constant two thousandfold, and leaves its shear centre almost exactly where it was. The bracing closes the box for twisting; it does not close it for the shear centre.
The hole at the tip of the crack
The commonest reason to repair a coped beam end is a fatigue crack at the corner of the cope, and the commonest repair needs no plate at all: a hole drilled so that the crack's tip is inside it, turning a crack into a smooth notch that the traffic can no longer drive. The hole has to be big enough, and how big is set by the crack — its radius grows in step with the crack's length. A 30 mm crack at a stringer's cope needs a 12 mm hole, a 60 mm crack a 24 mm one. The repair stops working at about 100 mm, where the hole outgrows a site drill and the section left beside it runs out of capacity at nearly the same depth. Most of the crack's life is spent far shorter than that, which makes the repair a matter of how early the crack is found.
The filler that knows how fast it is hit
A filler graded through its depth meets the small collisions softly and the hard one with a strong layer that has to be very strong, because every kilojoule the soft layer misses must be absorbed in less depth. A filler whose strength rises with the speed it is crushed at ranks collisions by speed instead, with no layers at all, and treats the middling collisions better than grading does. But it meets every collision hardest at its first instant, when the crushing speed is greatest, and a force that falls as the collision proceeds needs a higher peak to absorb the same energy in the same depth. A purely viscous filler that stops the hardest collision in 24 mm hits it with exactly twice the force of a uniform one.
The angle that saves the most concrete
Cut an arch dam into horizontal rings and each ring is a curved surface with water on one side. The projection rule gives the water's whole push on it without an integral — the pressure times the chord — and the two abutments, pushing back along the ring, turn that into a thrust equal to the pressure times the radius, the hoop formula of a pipe arrived at without a pipe. From there one line of calculus says that the ring using least concrete has a central angle of 133.6°, whatever the canyon, the depth or the concrete. That number explains why arch dams in narrowing canyons are drawn at a constant angle rather than a constant radius, and why the angle that suits the concrete is not the one that suits the rock.
The base that lets go and closes again
A column base whose holding-down bolts are preloaded is rigid until the moment on it lifts the plate off its bed, and then softer. Under a storm the moment goes one way and then the other, many times, and the question is whether the preload survives. It does, entirely, as long as no bolt yields — and on an ordinary base the bolts do not yield until the moment is three times what first lifts the plate. Past that the yielded bolts lose part of their preload once, and the loss stops within a cycle or two: the base settles rather than ratchets. What decides how much is lost is how close to its yield the bolt was tightened, so that past a point a larger preload leaves less after the storm.
The edge that cannot hold the arch
A slab strip whose ends cannot move apart arches inside its own depth and carries nearly four times its flexural load. "Cannot move apart" is a stiffness, not a fact, and the arch needs a lot of it: half the gain takes end springs about half as stiff as the strip itself in compression, and nine tenths takes springs five times as stiff. An interior panel is held by the floor around it and gets the arch. An edge panel is held on its outer side by whatever runs along the edge, and a band of slab two metres wide between columns eight metres apart supplies a twentieth of what the strip needs. The arch is a property of where the panel is.
The roof that ponds on its girders
A flat roof's joists sit on girders, and the water fills the sum of both their sags. Two members each half-way to ponding on their own are unstable together, and long before that the growth of the water is far larger than either member's own amplification says. AISC's simplified rule turns out to be a line of constant growth, and a member sized to a deflection limit has a ponding parameter proportional to its span — so a bay sized to L/240 under 1.5 kN/m² meets the rule up to 6 m, doubles its water at 12 and ponds at 24.5.
The rib that cannot lean on its own tie
A free arch rib under a half-span live load bends in the shape of its own buckling mode, and its thrust amplifies the bending more than twofold. Hang a deck from the same rib on vertical hangers and close the thrust in the deck, and the amplification disappears: the thrust and the tie's pull move together, so the couple they make keeps its lever arm, and the only second-order term left is the small difference between the rib's deflection and the deck's. The critical load rises sixteenfold, and the deck's share of the bending is simply its share of the stiffness.
The hangers that carry the shear twice
Crossing a tied arch's hangers turns them into the web of a truss, which is why the tie stops bending. It also means a live load's shear passes through them, so as a load runs on from either end each crossed hanger swings from nearly nothing to nearly its most: on a 100 m arch the worst swings through 678 kN, 90% of the largest force in any hanger, where a vertical hanger swings through 194, half of its own. More dead load raises the force and leaves the range alone. The arrangement that is best for strength is the one that hands its hangers to fatigue.
The water the valley floor takes
An arch dam is not a stack of rings. At its crown it is also a vertical cantilever fixed into the valley floor, and the water at each depth is shared between the ring there and the cantilever in whatever proportion makes them bend alike. In a V-shaped canyon the short lower rings are stiff and carry nearly everything, and the top rings carry up to twice their own water because the cantilever leans on them. In a U-shaped canyon the cantilever takes half the reservoir and bends the heel into tension that the ring formula never sees.
The building the trough cannot bend
A tunnel leaves a settlement trough, and damage criteria are applied to the trough's deflection ratio over the length of each building above it. But a building is not the ground: it has a bending stiffness, and it takes only as much of the ground's curvature as that stiffness lets it. One number decides how much — the building's stiffness over the soil's modulus times its length to the fourth — and over two decades of it a building goes from following the trough to bridging it. Because the length enters to the fourth power, the same building is stiff when short and soft when long.
The damper is only as good as its brace
A viscous damper added to a frame is held by a brace, and the brace is a spring in series with it. That pair has a ceiling: the most damping it can add is (√(1+κ) − 1)/2, κ being the brace's stiffness over the frame's, reached at one damper size and lost on either side of it. A brace as stiff as the frame allows 20.7%; a quarter as stiff, 5.9%. A damper larger than the best one is not better — it strokes less, locks, and turns the brace into a strut that moves the resonance instead of flattening it.
A quarter of the weld takes half the pull
A beam flange welded straight on to an unstiffened column flange is checked with an effective width of 191 mm out of 250. While the joint is elastic the plate's force does not use anything like that width: 47 per cent of it goes through the 65 mm over the web, and the flange has already yielded at 30 per cent of the force the rule allows. The rule's width is a plastic width, and the full-strength weld it insists on is what lets the joint get there.