Theme

The load must go somewhere — page 15

Essays 337 to 360 of 487 on this thread, in the same order.
What leaves the interior panel lands in the span. A frame of two 8 m bays and two 4 m storeys with fixed bases, 457 mm beams and 254 mm columns, with 20 kN/m on the left bay's beams only, against the stiffness of every beam-to-column joint as a multiple of the beam's EI/L, on a logarithmic scale. The shear across the floor interior joint's column-web panel (solid): 154 kN with rigid joints, 146 at EN 1993-1-8's rigid limit of 25 EI/L, 104 at 3.0 EI/L, 23 MN·m/rad, 63 at EI/L. The loaded beam's largest sagging moment (dashed), in kN·m: 71, 76, 102 and 126, against 160 for a simply supported span. The faint lines are EN 1993-1-8's boundaries for a frame that sways: nominally pinned below 0.5 EI/L, rigid above 25. Internal forces

The panel a soft joint empties into the span

Under a load on one bay, an interior column's web panel carries the difference between the two beams' moments. Make the beam-to-column joints semi-rigid and the panel is relieved — by 5 per cent at the stiffness EN 1993-1-8 still calls rigid, by a third at three times the beam's EI/L — because a softer joint takes less moment. The moment it does not take lands at mid-span, where the beam was not designed for it, and in sway it lands in the columns. And soften only some of a frame's joints, and the sway goes looking for the ones still stiff: their panels carry up to a quarter more than they would in an all-rigid frame.

However heavy the chord, ordinary posts cap its share. The heavy chord's share of the shear in a panel of uniform shear in a Vierendeel girder of 2 m panels, 1.5 m deep, against how many times stiffer it is than the light chord, from the one-panel model (lines) and from a whole girder (dots). Splitting by second moment (dashed) runs from 0.5 towards 1. With posts as stiff as the light chord the share is 0.54 at a ratio of 4 and still only 0.55 at 30; posts 4, 16 and 100 times stiffer reach 0.65, 0.80 and 0.93 at 30. The posts, not the chord, set the ceiling. The dots are a twenty-panel girder at its sixth panel, far from both support and load: with ordinary posts 0.50, 0.53, 0.56, 0.60, 0.65, 0.69 at ratios of 1, 2, 4, 10, 20, 30. They follow the model until the heavy chord's own second moment becomes a noticeable part of the girder's — 31 per cent at a ratio of 30 — and it starts to carry the global moment by bending as a beam. Structural form

The heavy chord the posts will not let work

A Vierendeel girder carries its shear as bending in its two chords, and when one chord is four times as stiff as the other the obvious rule gives it four fifths of the shear. With posts as stiff as the light chord it takes 0.56. The heavy chord's end moments have to be carried round each joint by a post, the post bends, and the heavy chord turns with its joints instead of bending between them. No amount of extra steel in that chord takes its share past 0.55 in the middle of a long girder; only the posts can, and they have to be about 150 times as stiff as the light chord to make the rule come true.

How long the pumps must run is set by how fast the water comes back. The floors that must be cast before the pumps stop under a 20 × 30 m basement dug 6 m below a water table at the surface, its 0.9 m slab and walls weighing 18.7 MN against 35.3 MN of uplift when the water is back, so that the weight stays ahead of the water at every instant, against the water's recovery time on a logarithmic scale, for a floor every 5, 7 and 10 days. If the water returns at once, five floors — the building has to be nearly heavy enough on its own. With a floor every 5 days: 3 at a 3-day recovery, 2 at 7, 0 at 14; a floor every 7 days: 4 at a 3-day recovery, 3 at 7, 1 at 14; a floor every 10 days: 4 at a 3-day recovery, 3 at 7, 2 at 14. Dashed, the closed form for weight added continuously at a floor a week, which runs about one floor below the steps: a floor arrives at the end of its cycle, not through it. Equilibrium

The water that comes back while the floors go up

A basement below the water table is built dry, inside an excavation kept pumped, and the building that will one day hold it down is not there yet. When the pumps stop, the water comes back over days and the frame goes up a floor a week, and the basement is safe only if the weight stays ahead of the water at every instant. How long the pumps must run is not set by how heavy the building is. It is set by one ratio — how much weight the frame adds while the ground refills — and for a basement that needs five floors on it to hold itself down, a seven-day recovery asks for three and a fourteen-day one for one.

A bigger top column attracts more moment, and only the joint stops it. The top storey of the edge column of a braced six-storey frame — 4 m storeys, a 254 UC 89 below the splice and a 203 UC 60 above — carrying a 9 m beam at every floor on partial-strength joints of 261 kN·m, with each of seven columns that might be chosen for it: the moment its floor's edge joint delivers at the design load of 60 kN/m (dark) and at the beams' collapse load (light), against what the column can carry at its top end, its plastic moment reduced for the axial force (line). 203×203 UC 46: 148 and 195 against 167; 203×203 UC 60: 171 and 225 against 230; 203×203 UC 71: 189 and 247 against 283; 203×203 UC 86: 205 and 261 against 347; 254×254 UC 73: 218 and 261 against 352; 254×254 UC 89: 232 and 261 against 435; 254×254 UC 107: 243 and 261 against 527. A stiffer column attracts more of the joint's moment until the joint's 261 kN·m caps it; the lightest column that carries what it attracts at collapse is the 203 × 203 UC 60. Connections

The column on the other side of the joint

A partial-strength joint is sold as a fuse: it caps the moment a beam can put into its support at the joint's own resistance. At an interior column that is true. At the edge of a frame the column is not a support that stays still; it is a spring in series with the joint, so the joint delivers less than its resistance in service and almost exactly what a rigid joint would. The column then carries three times the moment the simple-construction rule gave it, and at the top storey, where it stands alone and is lightest, it is weaker than the joint it was meant to be protected by.

Six millimetres of slip draw the Eurocode's line. The least degree of shear connection at which a 457 × 191 × 67 UB in S355 under a 130 mm slab of C30/37 2.5 m wide, with 19 mm studs of 80 kN can reach 95 per cent of its plastic moment without its end studs slipping more than 6 mm, against the span (solid), and EN 1994-1-1's minimum for ductile studs in a beam with equal steel flanges, 1 − (355/fy)(0.75 − 0.03L), not less than 0.4 (dashed). 6 m: 0.24 against 0.43; 8 m: 0.51 against 0.49; 10 m: 0.61 against 0.55; 12 m: 0.69 against 0.61; 14 m: 0.75 against 0.67; 16 m: 0.77 against 0.73; 18 m: 0.80 against 0.79; 20 m: 0.88 against 0.85. From 8 m up the two differ by at most 0.08: a stud model and a slip capacity reproduce the rule's slope as well as its level. At 6 m the slip alone would allow 0.24, and the rule asks for 0.43. Internal forces

The slip the plastic moment asks of the studs

A composite beam with half the studs that full interaction needs still has 85 per cent of the full plastic moment, because the slab's compression block simply gets thinner and the steel finds its own neutral axis. That is the stress-block answer, and it assumes every stud slips as far as the beam asks. Follow the slip along the beam and the end studs of a 12 m beam need 6.6 mm to reach nine tenths of that moment and 9 mm to reach 95 per cent — past the 6 mm a stud is trusted to give. Require 6 mm and the Eurocode's minimum degree of shear connection comes out of the arithmetic, slope and all.

The force each section may carry rises from the end, and the strands must climb under it. The prestress each section of a pretensioned beam 300 × 700 mm spanning 12 m, with eight strands of 125 kN at 220 mm below its centroid may carry at transfer without its top fibre passing −2.50 N/mm² or its bottom 18 (thick), against the distance from the end: 739 kN at 0.5 m, 1,101 at 2 m, 1,507 at mid-span, where the self-weight moment is largest. All eight strands bonded from the end give 1,000 kN once their transmission length is past (dashed), which the beam can carry only near mid-span. Debonded — six bonded from the end, one debonded for 0.50 m, one debonded for 1.00 m — their force (solid) climbs in steps that stay under the line everywhere. Sections and stress

The strands that are sleeved at the ends

A post-tensioned tendon can be draped up towards the centroid near the supports, where the self-weight moment that made its eccentricity safe has gone. A pretensioned strand cannot: it runs straight between the abutments of the casting bed. Choose eight strands at 220 mm below the centroid of a 12 m beam and mid-span passes every limit at transfer, while a metre in from each end the top fibre cracks. The cure is to stop some strands gripping the concrete near the ends, and how many is a trade: every strand saved at mid-span by lowering the strands is a strand to sleeve at the ends.

A secondary holds more than it twists once its connection passes a few tens of kilonewton-metres per radian. The mid-span twist of the 8 m primary beam of 12 kN/m at 75 mm off its shear centre, with a 6 m 356 × 171 × 51 UB framing in at mid-span whose 60 kN reaction acts 60 mm off the shear centre, against the rotational stiffness of the secondary's connection on a logarithmic scale, in series with the secondary's own 3EI/L of 14,453 kN·m/rad. Dashed, the 6.25° with no secondary. On the deck's side the secondary is worse than none below 33 kN·m/rad and better above it: 9.12° at 10, 3.28 at 100, 0.47 at 1,000. On the far side its torque opposes the deck's (0.89° at 10); as a pair, the torques cancel (1.05° at 100). EN 1993-1-8 calls this secondary's connection nominally pinned below 2,409 kN·m/rad (dotted). Deflection

The secondary beam that twists what it holds

A secondary beam framing into a twisting primary at mid-span is the best restraint a primary can have — concentrated exactly where the twist is. It is also a load: its reaction arrives on the primary's web, off the shear centre, as a torque at exactly the same place. Which wins is decided by the connection, and the threshold is low: a fin plate stiffer than about 33 kN·m per radian, a seventieth of what still counts as a pin, makes the secondary hold far more than it twists. The bolts' free play is another matter, because the torque acts from the first millimetre and the restraint only once the play is taken up.

The arm goes in almost the same place whatever shape the wind is. The share of the tip drift removed by one outrigger on a 200 m core of bending stiffness 1.2 × 10¹⁰ kN·m² carrying 6,000 kN of wind in all, with an outrigger of 1.0 × 10⁸ kN·m per radian, against the outrigger's level as a share of the height, for the three profiles of the same total wind. uniform: best at 0.745 of the height, removing 45.6 per cent; power law: best at 0.749 of the height, removing 45.9 per cent; triangle: best at 0.757 of the height, removing 46.4 per cent. The curves lie almost on one another: the triangle, with three quarters of its load in the upper half against the uniform wind's half, moves the best level up by 1.2 per cent of the height. Structural form

The arm that ignores the shape of the wind

The outrigger arithmetic is usually done for a wind that is the same at every height, and real wind is not: it grows with height, and an earthquake's first mode loads a building as a triangle. The natural guess is that a load concentrated towards the top moves the best place for the arm. It barely does. Put the same total wind on a 200 m core as a uniform load, a power-law wind and a triangle, and the best level moves by just over one per cent of the height. What moves is the force in the arm — half as much again under the triangle — and how far the top goes, while the arm's own stiffness shifts its best level thirty times as far as the wind's shape does.

A counterweight that follows the jib leaves only the payload, halved. The moment in the mast of a crane whose 50 m jib weighs 300 kN and luffs between 15° and 85°, lifting 60 kN at its tip, against the luffing angle, with a counterweight linked to the luff so that it balances the jib and half the payload at every angle: 1,449 kN·m loaded and −1,449 empty at 15°, 131 and −131 at 85°. What is left is the payload's moment less the half the counterweight was set for, plus or minus 1,449 kN·m at most, against 4,744 with a fixed counterweight. Equilibrium

The counterweight that follows the jib

A counterweight that stays put balances one position and leaves the mast a moment at every other. Make it move and it can balance anything that moves slowly enough to be followed. On a luffing crane the thing that moves most is not the payload but the jib itself, whose own moment about the mast changes more than twice as much through its luff as the payload's ever is — and a counterweight linked to the luff cancels that change exactly. What it cannot cancel is the payload, which leaves the ground in a second. The best any counterweight can do with that is wait halfway, and the mast is left with half the payload's moment at the longest radius, whatever else the counterweight does.

The linear answer has the ground holding the ends down. The contact pressure along a strip 16 m long, EI 5.40 × 10⁵ kN·m², on a bed of 50 × 10³ kN/m² per metre of its length, under a column of 1,000 kN. With springs that pull as readily as they push (dashed) the bed presses 197 kN/m under the column and pulls down on the ends at up to 34 kN/m — tension the ground cannot supply. With the pulling springs released (solid), the strip touches the ground only from 3.97 m to 12.03 m, 8.05 m in all, and presses 213 kN/m under the column, 8 per cent more; beyond that it carries nothing. Internal forces

The ends the ground was holding down

Winkler's springs pull as readily as they push, and on a long footing strip the linear answer quietly uses that: it has the ground holding the strip's ends down. Take the pull away and the correction under the column is modest — eight or nine per cent on the pressure and the moment — but the shape of the answer changes completely. A weightless strip longer than about eight metres keeps exactly eight metres of itself on the ground, whatever length was poured, and the rest rises off as straight cantilevers carrying nothing. The middle-third rule turns out to be a property of rigid footings: an eight-metre strip lifts at a fiftieth of the eccentricity the kern allows.

The preload lifts the young slab and lands on the one below it. The load on one slab of a frame of 250 mm slabs on a 7.5 m grid cast a floor every 7 days at 20 °C, on one level of shores and one of backprops, as a multiple of its own weight, from the day it is struck at 7 days to 28 days, with creep. With its backprops put in snug (dashed) it takes 1.52 w at the cast above it, creeps down to 1.29 by the end of the week, takes 1.48 w when the slab above it is struck and cast on in turn, and creeps up to 1.71. With every backprop jacked to 0.30 w (solid) the young slab starts its week at 1.22 w and ends it at 1.14; a week later the preload of the backprops above lands on it, and it takes 1.78 w, creeping to 1.86. Materials

The backprop jacked tight lands on the floor below

A backprop put in snug shares only the load that arrives after it, and creep then pushes the young slab above onto it anyway. Jack it to a preload instead and the young slab is lifted at once — but the preload survives the week, so the lift lands on the slab below the moment the next level is struck, and about half of it is load creep would have moved within the week regardless. The best preload balances the week-old slab against the fortnight-old one, and with creep it is small: a fourteenth of a slab's weight, about six hundred newtons a prop. Anything over a fifth leaves the frame worse than snug. What a small preload does buy completely is immunity to slack.

The tub girder's shear centre at three stages of its building. A steel trough 1,500 mm deep, 3,000 mm between its web tops and 2,000 mm across its 12 mm bottom flange, with 12 mm webs and a 400 × 20 mm flange on each web, drawn to scale. Open, as it is lifted, its shear centre lies 706 mm below the bottom flange, outside the steel entirely. Closed across the top by a bracing truss equivalent to a plate 0.50 mm thick, which carries shear and no bending stress, it is still 538 mm below. With a 250 mm concrete deck cast and hardened across the web tops it is 1,127 mm above the bottom flange, inside the box. The steel's centroid, 673 mm up, does not move until the deck is cast. Sections and stress

The box that is a trough until its deck is cast

A composite tub girder is a box only once its concrete deck has hardened. Before that it is an open steel trough — two leaning webs and a bottom flange — whose shear centre lies seven hundred millimetres below its bottom flange, in the air, and whose resistance to twisting is the thickness of its plates cubed. A light truss across the top is what holds it together while the deck is poured, and it is a plate for shear and nothing else: an angle of ordinary size is worth half a millimetre of steel. That half-millimetre multiplies the trough's torsion constant two thousandfold, and leaves its shear centre almost exactly where it was. The bracing closes the box for twisting; it does not close it for the shear centre.

A crack at the cope's corner, and the hole its tip needs. A 457 × 190 beam end coped 150 mm long and 80 mm deep, reacting 350 kN of which 70 per cent comes and goes with traffic, to scale. A fatigue crack has grown 30 mm down the web from the corner where the cope's two cuts meet, the most stressed point of the coped section. At that depth the live load's range of stress intensity at its tip is 15.6 MPa√m, and a hole drilled with the tip inside it stops the crack only if its radius is at least (ΔK/10.5√fy)², 6.2 mm: a 12 mm hole. The crack and the hole together leave 341 mm of the 377 mm coped section below them. Connections

The hole at the tip of the crack

The commonest reason to repair a coped beam end is a fatigue crack at the corner of the cope, and the commonest repair needs no plate at all: a hole drilled so that the crack's tip is inside it, turning a crack into a smooth notch that the traffic can no longer drive. The hole has to be big enough, and how big is set by the crack — its radius grows in step with the crack's length. A 30 mm crack at a stringer's cope needs a 12 mm hole, a 60 mm crack a 24 mm one. The repair stops working at about 100 mm, where the hole outgrows a site drill and the section left beside it runs out of capacity at nearly the same depth. Most of the crack's life is spent far shorter than that, which makes the repair a matter of how early the crack is found.

A filler that knows the speed meets the collision hardest at its start. The contact force against the depth crushed in the hardest collision, 500 t and 300 t closing at 2.85 m/s with 761 kJ, on a 40 mm filler between 500 t and 300 t, crushable over 24 mm: uniform (dashed), with 50 per cent of its strength at that speed depending on the speed, and with all of it. Each is as strong as it must be to stop the collision in 24 mm. Uniform: 30.5 MN at first contact; 50 per cent on speed: 38.4 MN at first contact; all on speed: 63.4 MN at first contact. The crushing speed is highest at the first instant and falls to nothing, so a filler whose strength follows it spends its force at the start; the same area under a falling line needs a higher peak than under a level one, and a purely viscous filler's is twice the uniform's. Dynamics

The filler that knows how fast it is hit

A filler graded through its depth meets the small collisions softly and the hard one with a strong layer that has to be very strong, because every kilojoule the soft layer misses must be absorbed in less depth. A filler whose strength rises with the speed it is crushed at ranks collisions by speed instead, with no layers at all, and treats the middling collisions better than grading does. But it meets every collision hardest at its first instant, when the crushing speed is greatest, and a force that falls as the collision proceeds needs a higher peak to absorb the same energy in the same depth. A purely viscous filler that stops the hardest collision in 24 mm hits it with exactly twice the force of a uniform one.

The water pushes on the chord, and the abutments push back along the arch. One horizontal ring of an arch dam, one metre high, 50 m below the water, spanning a 100 m gap with a central angle of 133.6°, drawn in plan with the water on the convex side. The water presses 491 kPa normal to the face everywhere (arrows); by the projection rule its resultant is that pressure times the chord, 49,050 kN per metre of height, pointing straight downstream. Each abutment pushes back along the ring's tangent, at 66.8° to the chord, so the two thrusts are N = pw/2sin(θ/2) = 26,686 kN — the pressure times the ring's radius, 54.4 m, which is the hoop formula of a pipe, arrived at without a pipe. Equilibrium

The angle that saves the most concrete

Cut an arch dam into horizontal rings and each ring is a curved surface with water on one side. The projection rule gives the water's whole push on it without an integral — the pressure times the chord — and the two abutments, pushing back along the ring, turn that into a thrust equal to the pressure times the radius, the hoop formula of a pipe arrived at without a pipe. From there one line of calculus says that the ring using least concrete has a central angle of 133.6°, whatever the canyon, the depth or the concrete. That number explains why arch dams in narrowing canyons are drawn at a constant angle rather than a constant radius, and why the angle that suits the concrete is not the one that suits the rock.

The base comes back to a different joint. Moment against rotation at the base of a 500 × 400 × 20 mm base plate with two M24 holding-down bolts in each of two rows, preloaded to 150 kN a bolt, through four cycles to ±170 kN·m. It is stiff until the bed lets go at 57 kN·m, softer past it, and near 170 kN·m the bolts on the tension side yield and stretch for good. Coming back through zero the base is not the base it was: its bolts have kept 83 per cent of their preload, and it lets go at 46.0 kN·m instead of 56.6. After the first full cycle the loops lie on top of one another. Connections

The base that lets go and closes again

A column base whose holding-down bolts are preloaded is rigid until the moment on it lifts the plate off its bed, and then softer. Under a storm the moment goes one way and then the other, many times, and the question is whether the preload survives. It does, entirely, as long as no bolt yields — and on an ordinary base the bolts do not yield until the moment is three times what first lifts the plate. Past that the yielded bolts lose part of their preload once, and the loss stops within a cycle or two: the base settles rather than ratchets. What decides how much is lost is how close to its yield the bolt was tightened, so that past a point a larger preload leaves less after the storm.

The arch is only as strong as what holds its ends. Load against mid-span deflection, as a share of the thickness, for a slab strip 4,000 mm long and 200 mm thick, a metre wide, with its ends held by springs of 0.05, 0.5 and 5 times its own axial stiffness EA/L and rigidly; dashed is its flexural load, 30.0 kN/m. At 0.05 EA/L it peaks at 45.3 kN/m, 1.51 times the flexural load, at 0.67 of its thickness; at 0.50 EA/L it peaks at 74.8 kN/m, 2.49 times the flexural load, at 0.45 of its thickness; at 5.00 EA/L it peaks at 108.6 kN/m, 3.62 times the flexural load, at 0.28 of its thickness; held rigidly it peaks at 116.8 kN/m, 3.89 times the flexural load, at 0.24 of its thickness. A soft restraint lets the ends move out as the strip tries to arch, so the thrust builds slowly and the peak arrives later and lower. Internal forces

The edge that cannot hold the arch

A slab strip whose ends cannot move apart arches inside its own depth and carries nearly four times its flexural load. "Cannot move apart" is a stiffness, not a fact, and the arch needs a lot of it: half the gain takes end springs about half as stiff as the strip itself in compression, and nine tenths takes springs five times as stiff. An interior panel is held by the floor around it and gets the arch. An edge panel is held on its outer side by whatever runs along the edge, and a band of slab two metres wide between columns eight metres apart supplies a twentieth of what the strip needs. The arch is a property of where the panel is.

Two members each half-way to ponding are unstable together. The girder's ponding parameter Cp against the joist's Cs. Either member alone is stable up to 1; together the roof is stable only below the solid curve, (1 − Cp)(1 − Cs) = (8/π²)·Cp·Cs, which meets the diagonal at 0.526 — two members each about half-way to ponding on their own are critical together. The dashed line is the simplified rule Cp + 0.9Cs ≤ 0.25. The marked roof is a 12 by 9 m bay whose girders and joists are each sized to deflect L/240 under 1.5 kN/m²: Cp = 0.26 and Cs = 0.19, stable, with its joists' sag amplified 1.79 times where the joist alone would say 1.24 and the girder alone 1.35. Deflection

The roof that ponds on its girders

A flat roof's joists sit on girders, and the water fills the sum of both their sags. Two members each half-way to ponding on their own are unstable together, and long before that the growth of the water is far larger than either member's own amplification says. AISC's simplified rule turns out to be a line of constant growth, and a member sized to a deflection limit has a ponding parameter proportional to its span — so a bay sized to L/240 under 1.5 kN/m² meets the rule up to 6 m, doubles its water at 12 and ponds at 24.5.

Hung from its deck, the rib's bending is not amplified at all. The bending moment along a 60 m parabolic rib at a 12 m rise (EI 250,000 kN·m²) under 25 kN/m of dead load and 10 kN/m of live load on the left half. Standing free on pinned springings (solid) it peaks at 1,303 kN·m, against 576 at first order (dashed): the thrust amplifies the half-span bending 2.26 times. The same rib hung over a deck 0.10 times as stiff as the rib on vertical hangers (thick) peaks at 524 kN·m, 0.99 times its first-order 528, and the deck (thin) carries 59. The deck closes the thrust in tension, and the tension it carries straightens the deck as much as the thrust bends the rib. Stability

The rib that cannot lean on its own tie

A free arch rib under a half-span live load bends in the shape of its own buckling mode, and its thrust amplifies the bending more than twofold. Hang a deck from the same rib on vertical hangers and close the thrust in the deck, and the amplification disappears: the thrust and the tie's pull move together, so the couple they make keeps its lever arm, and the only second-order term left is the small difference between the rib's deflection and the deck's. The critical load rises sixteenfold, and the deck's share of the bending is simply its share of the stiffness.

A crossed hanger swings through nearly all of its force. The largest and smallest force in each crossed hanger of a tied arch of 100 m span and 17 m rise on 32 hangers, with 60 kN/m of dead load and a live load of 60 kN/m running on from either end, each bar running from the one to the other. The worst range is 678 kN, from 49 to 727, in hanger 11; the largest force anywhere is 756 kN. 6 of the 32 go slack at some stage, and the worst range is 90% of the largest force anywhere: the live load's shear passes through the crossed hangers as through a truss's web, and swings them from nearly nothing to nearly their most. Structural form

The hangers that carry the shear twice

Crossing a tied arch's hangers turns them into the web of a truss, which is why the tie stops bending. It also means a live load's shear passes through them, so as a load runs on from either end each crossed hanger swings from nearly nothing to nearly its most: on a 100 m arch the worst swings through 678 kN, 90% of the largest force in any hanger, where a vertical hanger swings through 194, half of its own. More dead load raises the force and leaves the range alone. The arrangement that is best for strength is the one that hands its hangers to fatigue.

In a V-shaped canyon the rings carry the water, and the top rings more than theirs. The water pressure down the crown of a dam 100 m high in a V-shaped canyon 200 m wide at the crest, 5 m thick at the crest and 25 m at the base, with its rings at 133.6° (dashed), divided between the horizontal ring at each depth (solid) and the vertical cantilever at the crown (thin) so that the two deflect alike. At 4 m below the crest the ring carries 195% of the water there — the cantilever, loaded from below and free at the top, leans on it; at 49 m the cantilever carries 11%; at 89 m, 6%. Over the whole reservoir the cantilever carries 10% of the water and the rings the rest. Equilibrium

The water the valley floor takes

An arch dam is not a stack of rings. At its crown it is also a vertical cantilever fixed into the valley floor, and the water at each depth is shared between the ring there and the cantilever in whatever proportion makes them bend alike. In a V-shaped canyon the short lower rings are stiff and carry nearly everything, and the top rings carry up to twice their own water because the cantilever leans on them. In a U-shaped canyon the cantilever takes half the reservoir and bends the heel into tension that the ring formula never sees.

A stiff building bridges the trough it stands in. The settlement of a building 30 m long centred on the trough, over a trough 30 mm deep whose inflection points are 15 m from its centre (dashed: the ground with no building), measured from the building's settlement under its own weight, for relative stiffnesses EI/(kₛ·B⁴) of 10⁻⁴, 10⁻³ and 10⁻². At 10⁻⁴ its deflection ratio is 95% of the ground's; at 10⁻³ its deflection ratio is 66% of the ground's; at 10⁻² its deflection ratio is 17% of the ground's. The stiff building settles almost as a rigid body and leaves the trough's curvature to the ground beneath it. Deflection

The building the trough cannot bend

A tunnel leaves a settlement trough, and damage criteria are applied to the trough's deflection ratio over the length of each building above it. But a building is not the ground: it has a bending stiffness, and it takes only as much of the ground's curvature as that stiffness lets it. One number decides how much — the building's stiffness over the soil's modulus times its length to the fourth — and over two decades of it a building goes from following the trough to bridging it. Because the length enters to the fourth power, the same building is stiff when short and soft when long.

A damper too large stops damping. The damping of a structure with 2.0% of its own, against the size of a viscous damper held by a brace — the damper's force over the brace's at the structure's own frequency, on a logarithmic scale — for braces a quarter as stiff as the structure, as stiff, and four times as stiff. With the brace at 0.25 the damping peaks at 7.9% for a damper of 0.86; with the brace at 1.00 the damping peaks at 22.7% for a damper of 0.58; with the brace at 4.00 the damping peaks at 63.9% for a damper of 0.29. Either side of the peak it falls: a small damper barely moves, and a large one barely strokes — it locks, and the brace carries the motion as a spring. Dynamics

The damper is only as good as its brace

A viscous damper added to a frame is held by a brace, and the brace is a spring in series with it. That pair has a ceiling: the most damping it can add is (√(1+κ) − 1)/2, κ being the brace's stiffness over the frame's, reached at one damper size and lost on either side of it. A brace as stiff as the frame allows 20.7%; a quarter as stiff, 5.9%. A damper larger than the best one is not better — it strokes less, locks, and turns the brace into a strut that moves the resonance instead of flattening it.

A plate pulled off an unstiffened flange. Looking down the column at a 250 × 20 mm plate on a 300 × 19 mm flange with a 11 mm web and 27 mm root radii, the plate pulled away from the flange. Shaded on the plate's welded edge: the force per millimetre of weld while everything is elastic, 47% of it entering over the web and its root radii and peaking at 2.67 times the uniform value at the toe of the radius. Dotted: the uniform force P/bp a rigid flange would give. Dashed: the same force spread over the effective width EN 1993-1-8 gives the joint, 191 mm — a plastic width, 2.8 times the 69 mm the elastic share fits at the web's average. Connections

A quarter of the weld takes half the pull

A beam flange welded straight on to an unstiffened column flange is checked with an effective width of 191 mm out of 250. While the joint is elastic the plate's force does not use anything like that width: 47 per cent of it goes through the 65 mm over the web, and the flange has already yielded at 30 per cent of the force the rule allows. The rule's width is a plastic width, and the full-strength weld it insists on is what lets the joint get there.

All themes