A hole takes a tenth of every perimeter
A 300 mm riser cut a slab's depth from a column throws a shadow from the column's centre, and EN 1992-1-1 deletes whatever part of a punching perimeter falls inside it. The outer perimeter, being longest, loses the most length — but it loses the same share as the control perimeter, a tenth of each, because the shadow is an angle. The cost arrives somewhere less obvious: a seventh ring of studs, 24 per cent more steel, and studs needed in a bay a third of a metre shorter than before.
The reaction moves one per cent and the moment five
Over the support of a wide-flanged continuous girder the flange works over a third of its width, so the girder there should be softer and shed moment into its spans. It does — but it is the reaction that the softness changes, by less than one per cent, and the support moment, a small difference of two large ones, moves by five. The stress spike over the support follows the reaction rather than the moment and eases by two. A prismatic analysis is right about the moments to a few per cent, and the spike stays a problem of the section.
Two planes of braces and one circumference
A tower leg or a triangular girder's chord receives K joints from two planes at once, and each can be checked as a planar joint: its gap, its eccentricity, its band. What the planar checks cannot see is that the two planes' braces are welded to the same tube. A 114 mm brace takes up 86 degrees of a 168 mm chord's circumference whatever its gap, so a square tower's two planes leave 6.5 mm between them where the welds need 12.6, and a triangular girder's braces land on each other. And two eccentricities at the edge of their band give the chord √2 or √3 times the moment the band was written for.
The water tower that could damp itself
A full water tower's sloshing water is a second mass on a spring, hung from the container at very nearly the tuning a designed tuned-mass damper would be given, and it weighs two-fifths as much as what it hangs from. Plain water has half a per cent of damping, so it splits the tower's resonance into two sharp peaks and helps nothing. A screen across the tank that gives it a tenth makes the water a damper: the tower's rms base shear falls to four-tenths of what it would be with the water frozen, and the same screen keeps working as the town empties the tank.
The prop that holds what the roller left
A basement wall whose ground-floor slab is cast before the backfill spans between its base and the slab, and as the fill is compacted against it the wall bows by a sixth of a millimetre. A free cantilever stem leaned sixteen times as far and shed an eighth of the roller's pressure; the propped wall sheds one per cent. Its base moment falls to a third, which looks like a gain, but the pressure has not gone: the slab now carries 22.6 kN a metre against the 6 an active-pressure design gives it and the 9 of soil at rest.
The pile the ground pulls apart
Clay that swells after its trees are felled rises past the piles in it, and the same compatibility that put a pile into compression in settling ground puts it into tension in heaving ground, at nearly the same depth. Nearly everything else changes. A lifted toe parts from the soil and holds nothing, so the shaft alone anchors the pile; the head load that added to the downdrag now subtracts from the tension; and the tension peaks 17 metres down, far below the short cage a lightly loaded pile is given. A house's piles in swelling clay are tension members nobody reinforced.
The beam that leaves the bed
A pretensioned beam's debonding is designed for the moment its strands are cut, when the casting bed holds it at its ends and its own weight is the largest relief its top fibre will get. Then it is lifted by loops a little in from its ends and stored on bearers a little further in. Setting the supports a metre in takes 31.5 kN·m off the self-weight moment along the whole length between them, not just at the ends, and the schedule that passed transfer with 0.07 N/mm² to spare has room for 51 mm of it. In the yard's conditions the bearers may come in 0.57 m; a metre in needs a third strand sleeved, and past 2.2 m nothing does.
The frames the deck pushes first
A half-through girder's U-frames are the ends of the cross-girders that carry its deck. Load the deck and every cross-girder sags, its ends rotate, and every frame's foot swings inward by millimetres before the compression chord has asked the frames for anything. It looks like a second imperfection on top of the chord's bow. It is a much weaker one: the frames all move together and the chord simply goes with them, so a 7.5 mm push adds 1.4 kN to frames that the bow loads with 13.6, and stiffer frames make it smaller, not larger. What the push leaves is mostly in the frames' own members, not in what they ask of the chord.
The arm connected late
An outrigger is often left unconnected until a concrete building is finished, so that the columns and the core can shorten by their different amounts without it. Most of their difference has not happened yet. Three-quarters of fifty years' differential shortening arrives after the frame tops out, and an arm connected then ends up carrying 3.5 MN of it — 60 per cent of what the design wind puts into the same arm, permanently, and in the same direction on both sides of the core. The connection date is the largest load the arm has, and a stiffer arm collects it faster than it collects the wind.
How far a doubler has to run
A doubler on a coped web is joined to the beam only along its welds, and the force reaches it through those welds from wherever it is welded. Stopped at the end of the cope, a plate welded along its two long edges gives about two fifths of the relief a fully joined plate would give at the very section it was put there for. Run on past the cope by four tenths of its own depth, it gives nine tenths. Welded all round, it is fully joined at any length.
The building the trough twists
A building that crosses a tunnel's settlement trough at an angle stands on ground that is warped as well as sagged. Its four corners do not settle into a plane, and beyond about twenty degrees of skew the warp is larger than the sag. Whether the building follows that warp or resists it depends on a property its bending never needed — whether its walls and floors close into a tube — and the same walls, closed or open, differ a thousandfold in their stiffness against it.
The branch that holds the riser to a floor
A riser guided at every floor leans with each storey's drift and is barely bent by it. Take a branch off it and brace the branch to a slab, and the branch becomes a strut that holds the riser to that slab partway up the storey. The riser, which was carrying 3 N/mm², carries 71 at the tee. Let the branch slide at its brace and the riser is spared, but the branch is then bent by the riser's lean. The lean has to go somewhere, and the brace decides where.
The basement that leaks before it floats
A water table that rises after a basement is finished is a load that grows through the building's life, and the building's flotation check is the last thing it troubles. A metre of rise adds a sixth to the uplift on the whole building but over a quarter to the net load on the slab, which carries the water less its own weight. The slab's cracks, which a watertight basement is designed to, are the first thing to run out of room — and the limit for the cracks that pass right through it tightens as the water rises.
The same studs, moved to where the slip is
A composite beam with half the studs full interaction needs reaches 85 per cent of the full plastic moment, if its end studs can slip as far as the beam asks — nearly 9 mm on a 12 m span, past the 6 mm a stud is trusted to give. Keep the same nineteen studs and crowd them toward the supports, and the end studs need 4.4 mm. Nothing about the beam's strength changes; what changes is how soon the slab's force builds up, and the least connection the slip allows falls from 0.69 to 0.40.
The preload that cannot be taken back
A backprop jacked tight under a young slab relieves it and loads the slab below by the same amount at the same instant. The obvious repair is to slacken the backprop once the young slab is past its worst, so that the preload never reaches the slab below. It cannot work. Slackened to snug, a backprop lets go of everything it carries, not only its preload, and the young slab's load jumps from 1.19 to 2.00 times its weight. Let down by the preload alone, it gives back a load the slab below has already carried at its worst.
Two islands in one film
Bore a hole along a shaft and its torsion film acquires an island that floats at a height of its own. Bore two and there are two islands, and the steel between them is a strip of film stretched from one to the other. Side by side at one radius, the islands float level, the strip is flat, and two holes cost twice one hole's stiffness and none of its stress. One inside the other on a radius, the islands float at different heights, the strip is steep, and the steel between the holes becomes the shaft's weak point.
The load that visits every panel
A Vierendeel girder checked for a load at mid-span is checked for one position of a load that, on a bridge, stands everywhere in turn. Crossing it, a 100 kN load puts 1.7 times the mid-span check's moment into the end panels' chords, loads the middle post that a central load leaves idle, and makes the deck chord a beam between its posts in every panel where its share of the shear is small. Equal chords stay the stiffest arrangement; a vehicle whose axles span a panel cannot stand in the middle of one.
The day taken off the floor cycle
A frame cast a floor a week loads its slabs with the same multiples of their weight whether the cycle is seven days or four. What a shorter cycle changes is how strong each slab is when its load arrives, and it changes that unequally, costing the youngest slab more than the one below it. That is why a faster cycle makes a jacked backprop more useful rather than less, and why a frame that wants four days needs both a second level of backprops and a preload to be as safe as a week on one.
The slab that shrinks away from the wall
A basement wall propped by its ground-floor slab before it is backfilled keeps the roller's pressure, and its slab takes it. Then the slab dries. Two millimetres of shrinkage at each end — about a year for a 30 m slab indoors — and a slab that only bears on the wall has let go of it, leaving a stem designed as propped to carry 2.6 times the base moment it was given. Tying the slab into the wall to stop that makes it worse: the slab goes on shrinking and pulls, and the base moment passes the free cantilever's.
The joint cast over the pier
Two pretensioned beams made continuous over a pier by a joint cast with the slab have ends that are still turning when the joint goes in, and the joint stops them. What it is then asked to carry depends on the day it is cast. At four weeks the beams' creep is still lifting their ends and the joint is sagged to half as much again as its cracking moment. At a year the beams have nearly stopped and the slab's shrinkage hogs the joint by as much the other way. Cast at about sixteen weeks, it is asked for almost nothing.
The nut turned after the storm
A preloaded column base that has been through a storm has lost some of its preload, and the obvious repair is to retighten its bolts. Left alone, the bolts stretched once in the first storm and never again; the base settled. Retightened, they are given back the preload the storm could not live with, and the next storm takes it away again by stretching them again. Retightening after every storm turns a base that settles into one that ratchets, a tenth of a millimetre at a time, and the count of storms it has in it is set by the bolt's elongation.
The arm that slips on purpose
An outrigger connected to a concrete building at topping out goes on collecting the columns' and the core's differential shortening for fifty years. The obvious cure is a joint that lets the arm move under the slow force and holds under the fast one. A friction joint cannot do it — once creep has brought it to its slip load it has nothing left on one side of the core, and a joint strong enough to hold the wind is never reached by the creep at all. A viscous damper can, because its force depends on how fast it is pushed rather than how far.
The beam at the bottom of the stack
A precast yard stacks pretensioned beams to save space, each on bearers resting on the one below. If the bearers line up, the weight above goes straight down through them and the bottom beam never knows it is there. If they land outside its own bearers, the stack hogs the bottom beam at every section between them and takes from its top fibre relief that its debonding schedule had already spent. A schedule built for the yard leaves the bearers of a stack of three seven millimetres to be out of line. A bottom beam with a schedule of its own can be given half a metre.
The core drilled after the slab was built
A building in use acquires new services, and a core drilled through a flat slab beside a column is a routine instruction. The studs round the column were laid out for a slab without the hole, and the drill finds whatever is there. Whether it cuts a stud matters less than it looks. What decides is the outer perimeter, which the hole pushes outward while the studs stay where they are, and whether the slab survives is set by a margin nobody chose: the room left when the studs were rounded up to a stock size and the rings to a whole number.