Two beams, or one beam four times as stiff — the interface shear generator
Two beams, or one beam four times as stiff. Two 200 × 150 planks spanning 4 m under 6 per millimetre. Loose, they have 112.5×10⁶ mm⁴ between them and deflect 16.2 mm, with the two faces at the interface sliding past one another. Bonded, the pair has 450.0×10⁶ — exactly 4 times as much, because doubling a depth cubes — and deflects 4.0 mm at half the extreme-fibre stress. Nothing was added but a restraint on slip. With connectors of stiffness 200 the same beam deflects 5.4 mm, which is 89% of the way from one bound to the other.
10 essays call
interface-shear. The drawing above is what it returns with no arguments at all; every
call below passes it something, because a placement that passes nothing draws whichever
member of the family the generator happens to default to rather than the one its essay
argues about.
Where it is called
Changing this generator changes every one of these figures.
Two beams, or one beam four times as stiff
Stack two planks and they bend as two beams whose faces slide past one another. Bond the faces and the pair has one neutral axis, four times the second moment and half the stress. Nothing was added but a restraint on slip.
A section made of two materials, one of them pretended away
Multiplying a material's width by the ratio of the moduli produces a fictitious section of one material with the right neutral axis and the right forces. It is not a trick — it is compatibility and Hooke's law written down — and it says a stiff material takes what its modulus asks for.
Half the studs, and most of the beam
Bonding two layers together quadruples the stiffness of the pair. A real connection is a row of studs that deform, so the layers slide a little and the beam sits between the two answers — but not halfway between, and the number that decides where is a single dimensionless group.
Two skins and the space between them
A sandwich panel is a section made of a material that carries the bending and a material that carries none of it. The parallel-axis term is not a correction here — it is 98.8 per cent of the second moment — and the shear deflection is not a correction either.
The ground that hangs on instead of holding up
A pile is driven through fill that has not finished settling. The fill goes down past the shaft, the friction along that length turns round, and the pile is now carrying the soil rather than the other way about. The worst force is not at the head and not at the toe, and nothing at that depth can be seen.
The connection is busiest where the beam is not
A composite beam's studs are spaced evenly along it and the demand on them is not even at all. It peaks at the supports, where the bending stress is nothing, and falls to zero at mid-span, where the section is working hardest — so the connection is designed from a diagram nobody looks at.
The shear that decides a timber beam
A steel beam is never governed by shear, because its bending strength is only 1.73 times its shear strength and no beam is that short. Timber's ratio is 6.7 along the grain and 23 across it, so shear governs at proportions people build every day.
The slip the plastic moment asks of the studs
A composite beam with half the studs that full interaction needs still has 85 per cent of the full plastic moment, because the slab's compression block simply gets thinner and the steel finds its own neutral axis. That is the stress-block answer, and it assumes every stud slips as far as the beam asks. Follow the slip along the beam and the end studs of a 12 m beam need 6.6 mm to reach nine tenths of that moment and 9 mm to reach 95 per cent — past the 6 mm a stud is trusted to give. Require 6 mm and the Eurocode's minimum degree of shear connection comes out of the arithmetic, slope and all.
The same studs, moved to where the slip is
A composite beam with half the studs full interaction needs reaches 85 per cent of the full plastic moment, if its end studs can slip as far as the beam asks — nearly 9 mm on a 12 m span, past the 6 mm a stud is trusted to give. Keep the same nineteen studs and crowd them toward the supports, and the end studs need 4.4 mm. Nothing about the beam's strength changes; what changes is how soon the slab's force builds up, and the least connection the slip allows falls from 0.69 to 0.40.
The slip that peaks where the moment turns
A simply supported composite beam slips most at its supports, and its studs are crowded there. Make the same beam continuous over a middle support and the slip peaks twice: at the end support, and again, just as hard and the other way, at the point of contraflexure — not over the middle support, where the shear is largest but the slip falls to nothing. Studs graded toward the supports, as a simple span's would be, miss the second peak and buy a tenth; graded to the slip they buy more than a third. And the hogging region cannot give its studs away to the span, because its edge is where the second peak is.