The ground pushes back hardest where the beam has gone down furthest
The ground pushes back hardest where the beam has gone down furthest. A strip 16.4 m long and 1 m wide on ground of subgrade modulus 50 × 10³ kN/m³, carrying 1000 kN at its centre. The beam settles 3.90 mm under the load and the ground pushes back in proportion — the arrows are k times the settlement above them, peaking at 195 kN per metre — so the pressure diagram is the settlement bowl and not an assumed distribution. The characteristic length 1/β is 2.56 m: the bowl crosses zero at 6.04 m, which is 3π/4 of it, and beyond that the arrows reverse because the beam has lifted off. By 8.05 m — one π/β — the disturbance is 4.3% of what it was, which is why the moment 641 kNm and the peak pressure 195 kN/m contain no length at all. The settlement is drawn 217 times full size — the real bowl is 3.90 mm deep over 16.4 m, about 1 in 4207 — and at true scale the beam would be a straight line.
22 essays call
elastic-foundation. The drawing above is what it returns with no arguments at all; every
call below passes it something, because a placement that passes nothing draws whichever
member of the family the generator happens to default to rather than the one its essay
argues about.
Where it is called
Changing this generator changes every one of these figures.
The beam that sits on the ground
Every other beam in this collection is held at points. A footing is held everywhere, by something that pushes back in proportion to how far it is pushed — and that single change hands the structure a length it did not choose. Two or three of those lengths from the column, nothing knows the load happened.
The deflection that belongs to the support
A beam calculation answers a question about a beam sitting on things that do not move. Real ones sit on bearings, on other beams and on columns that shorten, and every one of those is a spring in series with the member — so a deflection is the sum of two things and only one of them is a property of the beam.
The settlement that matters is the difference
A building that goes down half a metre uniformly is undamaged and needs a new front step. One that goes down a twentieth as far, unevenly, has cracked. The superstructure can even the difference out — and the only way it can do so is by carrying the difference itself, as a force.
Held everywhere, and it forgets its length
A brace at a point divides a member's buckling length. A restraint spread along the whole member does something else — the member chooses its own number of half-waves, and past a few of them the critical load stops depending on the length at all.
The section that will not keep its shape
A box girder is closed, so torsion costs it almost nothing. What an eccentric load actually does to it is something a torsion calculation contains no term for — the rectangle becomes a parallelogram, in its own plane, along the whole length of the span.
The mode between the two that get checked
A thin-walled strut has three ways of buckling and two of them have design rules. The third has a half-wavelength several times the section depth, a shape in which the fold lines themselves move, and an elastic stress that no effective-width calculation can produce.
The cable that is a spring
A suspension bridge's cable is a funicular — it takes the shape the load gives it, and the deck's job is to make the load one that shape is right for. A stayed deck is not that at all. Its cables are straight, each reaches the deck at one point, and every one of them behaves as an inclined spring.
The pressure that needs no direction
Every buckling problem in this collection has had a load with a direction — a column pushed along its axis, a plate along its edge, an arch by what is on it. A buried pipe has none. The pressure is the same everywhere, it stays normal to the wall as the wall moves, and it does work on any change of shape that reduces the area inside.
The ground is a mechanism
Bearing capacity is met as a formula with three terms and a table of coefficients, and that presentation hides what it is. Underneath is a plastic collapse mechanism — a rigid wedge, a fan of radial shear on a logarithmic spiral, and a passive wedge that has to be pushed up and out of the way — and every coefficient in the table is a property of that one drawing.
Nine piles, and four times the settlement
A pile cap divides its load between its piles by the same three terms a bolt group uses and a section under biaxial bending uses. What a bolt group does not have is neighbours it shares ground with — and the group effect that matters is not the strength check everybody makes, but a stiffness effect nobody tabulates.
The lining that is stronger for being weaker
A tunnel lining is not loaded. The ground arrives already stressed and the hole wants to squash into an ellipse; the lining's only job is to refuse, and how much moment it collects depends entirely on how hard it refuses. Make it stiffer and it takes more. Make it flexible — put joints in it, make it thin — and it takes almost none, while the hoop thrust it carries does not move at all.
The buckle that will not spread out
A compression chord on a continuous restraint chooses its own number of half-waves and forgets how long it is. Give it the force it actually carries — a parabola, largest at midspan — and the number barely moves while the shape changes completely, which is the half that decides where the restraint has to be.
The crack is a strain, not a slope
Angular distortion is what every table of settlement limits is written in, and it is a proxy. What cracks a building is a tensile strain in it, and reading the building as a deep beam says which of two mechanisms supplies it, why hogging is exactly twice as damaging as sagging, and why a horizontal stretch of a few millimetres takes half the capacity away before the settlement starts.
A row of frames is not a foundation
The top chord of a half-through girder is held sideways by U-frames, and the standard calculation smears them into a continuous elastic foundation. That is right while the frames are close and quietly wrong once they are not. The crossover sits at seven-tenths of the buckle's own half-wavelength, whatever the frames' stiffness — and beyond it the chord buckles between frames at a load no stiffening of the frames can raise.
What the frames hold is the bow
A row of U-frames is sized for a force, and the rules give that force as a percentage of the compression chord's force that nobody derives. Derived, it is not a property of the frames at all. It is the chord's initial bow, grown by how near the chord works to buckling — and it is least, not greatest, near the stiffness at which the chord stops using the frames. Stiff frames tend to a limit that is π²/500 of the chord force: the familiar two per cent, arriving from a bow of one five-hundredth.
The ends the ground was holding down
Winkler's springs pull as readily as they push, and on a long footing strip the linear answer quietly uses that: it has the ground holding the strip's ends down. Take the pull away and the correction under the column is modest — eight or nine per cent on the pressure and the moment — but the shape of the answer changes completely. A weightless strip longer than about eight metres keeps exactly eight metres of itself on the ground, whatever length was poured, and the rest rises off as straight cantilevers carrying nothing. The middle-third rule turns out to be a property of rigid footings: an eight-metre strip lifts at a fiftieth of the eccentricity the kern allows.
The building the trough cannot bend
A tunnel leaves a settlement trough, and damage criteria are applied to the trough's deflection ratio over the length of each building above it. But a building is not the ground: it has a bending stiffness, and it takes only as much of the ground's curvature as that stiffness lets it. One number decides how much — the building's stiffness over the soil's modulus times its length to the fourth — and over two decades of it a building goes from following the trough to bridging it. Because the length enters to the fourth power, the same building is stiff when short and soft when long.
The frames the deck pushes first
A half-through girder's U-frames are the ends of the cross-girders that carry its deck. Load the deck and every cross-girder sags, its ends rotate, and every frame's foot swings inward by millimetres before the compression chord has asked the frames for anything. It looks like a second imperfection on top of the chord's bow. It is a much weaker one: the frames all move together and the chord simply goes with them, so a 7.5 mm push adds 1.4 kN to frames that the bow loads with 13.6, and stiffer frames make it smaller, not larger. What the push leaves is mostly in the frames' own members, not in what they ask of the chord.
DeflectionThe building the trough twists
A building that crosses a tunnel's settlement trough at an angle stands on ground that is warped as well as sagged. Its four corners do not settle into a plane, and beyond about twenty degrees of skew the warp is larger than the sag. Whether the building follows that warp or resists it depends on a property its bending never needed — whether its walls and floors close into a tube — and the same walls, closed or open, differ a thousandfold in their stiffness against it.
Internal forcesThe footing the storms press down
A footing strip under a column that a storm rocks one way and then the other was expected to dig itself a bowl: its ends loaded half the time, compacted, and left hanging over the hollow. On ground that unloads and reloads four times as stiffly as it first loads, the bowl appears and the strip fills it. The column settles 26% more over three storms and then stops; the footing rocks 22% less than it did in its first storm and is 64% stiffer than on springs that forget, because rocking unloads half the strip and ground that has carried the column unloads stiffly. The storms change the settlement and the stiffness, and leave the moments almost where they were.
Internal forcesThe footing a prevailing wind leans
A footing rocked by storms that reverse evenly settles into a symmetric bowl and stops. A footing under a frame in a prevailing wind is pushed harder one way than the other, and its ground keeps the difference. It leans — and then it stops leaning, within three storms, at a tilt set by how unequal the storms are and how large the largest has been. Fifty years of storms lean it further only in the years when a storm beats every one before it, and between those years nothing that happens to the footing moves it at all.
Internal forcesThe footing that hangs from its column
A footing under a bracing bay's column is pressed hard when the wind pushes one way and pulled when it swings back, and if the pull is larger than the footing's weight it hangs from the column, clear of the ground, for part of every storm. It looks like a footing free to come down somewhere new each time, and walk. It does not walk. The ground under it keeps the memory of every press, and a footing that is not touching the ground cannot change that memory; it comes back down into its own bowl, leans once towards its harder press, and stops within three storms.