Generator

The props decide where the stress ends up

Rendered here at the parameters it defaults to, with every essay that calls it — which is the same list as the blast radius of changing it.
The props decide where the stress ends up. Bottom-fibre stress in the steel of a 12 m composite beam carrying 12 kN/m of wet concrete and 18 kN/m afterwards. Unpropped, the bare steel takes the first stage alone and reaches 292 MPa; propped, the finished composite section takes everything and reaches 186 MPa — a ratio of 1.57. 62% of the unpropped beam's final stress was locked in before the slab was structural at all. The deflections differ by 1.73 times for the same reason, and no drawing of the finished beam distinguishes the two.

The props decide where the stress ends up. Bottom-fibre stress in the steel of a 12 m composite beam carrying 12 kN/m of wet concrete and 18 kN/m afterwards. Unpropped, the bare steel takes the first stage alone and reaches 292 MPa; propped, the finished composite section takes everything and reaches 186 MPa — a ratio of 1.57. 62% of the unpropped beam's final stress was locked in before the slab was structural at all. The deflections differ by 1.73 times for the same reason, and no drawing of the finished beam distinguishes the two.

11 essays call build-sequence. The drawing above is what it returns with no arguments at all; every call below passes it something, because a placement that passes nothing draws whichever member of the family the generator happens to default to rather than the one its essay argues about.

Where it is called

Changing this generator changes every one of these figures.

The props decide where the stress ends up. Bottom-fibre stress in the steel of a 12 m composite beam carrying 12 kN/m of wet concrete and 18 kN/m afterwards. Unpropped, the bare steel takes the first stage alone and reaches 292 MPa; propped, the finished composite section takes everything and reaches 186 MPa — a ratio of 1.57. 62% of the unpropped beam's final stress was locked in before the slab was structural at all. The deflections differ by 1.73 times for the same reason, and no drawing of the finished beam distinguishes the two. Structural form

The structure that was never complete

Every analysis in this collection is of a finished structure loaded once. Real ones are built in pieces, and each piece carries whatever was present at the moment it became structural — so the stress in a member depends on when it arrived, which appears nowhere on any drawing.

Four camber rules, and what each leaves on the finished beam. The same 12 m composite beam, cambered against four different things, followed through its own load history. Positive is a sag and negative a hog, and the point at the left of each line is the shape it was fabricated to. Cambering against the wet concrete leaves 12.7 mm of sag at the end and a flat beam on the day the slab is poured; cambering against the total load leaves the beam dead flat when fully loaded and hogged 37.9 mm — one part in 316 of the span — before anything is on it at all. Deflection

Built to the wrong shape on purpose

A cambered beam is fabricated curved upward so that load bends it down to something like straight. Nothing in the analysis changes, no stress anywhere is altered, and almost every mistake made with it is a bookkeeping mistake about which loads count.

Two differences up the same building, peaking in different places. Differential shortening between a perimeter column and the core of a 40-storey building, plotted up the height. The part driven by load peaks at level 20 — exactly half way up, because a floor near the top has almost nothing built above it to shorten what is beneath, and a floor near the bottom has almost nothing beneath it to shorten. The part driven by shrinkage does not care what is above it at all and accumulates all the way to the roof. Their sum is worst at level 40, at 43 mm, which across a 9 m bay is a floor out of level by one in 208. Deflection

The columns are shorter than the core

Every column in a tall building gets shorter as the building is built on top of it, and the core beside it gets shorter by a different amount. The floors between them tilt by the difference — and the difference is largest exactly half way up, because a floor near the top has almost nothing built above it and a floor near the bottom has almost nothing beneath it.

A couple applied to the core, and two columns to make it. A 20-storey core with one outrigger at 59% of its height. The arm is stiff in bending and the perimeter columns are stiff in tension and compression, so between them they resist the core's rotation at that level — a couple of 35283 kNm here, carried as a 294 kN pair in the columns at 120 m centres. The compatibility is one equation: the core's rotation at that level, less what the couple takes back out of it, equals the rotation the arm and its columns allow. The top drift falls from 360 mm to 74, which is 80% of it, and the base moment from 73500 to 38217 kNm. The deflected shape is drawn hugely exaggerated: the real top drift is about one five-hundredth of the height. Structural form

The arm that makes the columns work

The perimeter columns of a tall building are already there, already carrying gravity, and already the furthest thing from the centre. They take almost none of the overturning, because a floor slab transmits shear and not moment — and one storey-deep arm at the right height changes that by nearly a half.

Balanced, and four times as heavy on the bearing. A bascule leaf of 900 kN whose centroid is 9 m from the trunnion, balanced by 2700 kN at 3 m on the other side. What balancing achieves is exactly one thing: the moment about the pivot is zero at every opening angle, because both terms carry the same cosine. What it costs is two things that are not zero. The reaction on the trunnion becomes 4.0 times the leaf's own weight, since both weights are still there. And the rotational inertia rises by 33%, so the balanced leaf is the hardest one to start and to stop — which is why the counterweight is put as close to the pivot as it will fit, at the price of being heavy: the same balance at twice the radius weighs 1350 kN and carries 1.25 times the inertia. Equilibrium

Balanced, and four times as heavy

A counterweight cancels a moment about a pivot, and that is the only thing it cancels. The bearing beneath carries both weights, the inertia rises as the square of the radius, and a load that moves cannot be balanced at more than one position at all.

The props decide where the stress ends up. Bottom-fibre stress in the steel of a 12 m composite beam carrying 6 kN/m of wet concrete and 9 kN/m afterwards. Unpropped, the bare steel takes the first stage alone and reaches 146 MPa; propped, the finished composite section takes everything and reaches 93 MPa — a ratio of 1.57. 62% of the unpropped beam's final stress was locked in before the slab was structural at all. The deflections differ by 1.73 times for the same reason, and no drawing of the finished beam distinguishes the two. Sections and stress

The section that changed while it was being loaded

A stress is computed from a moment and a section modulus. When part of the moment arrived while the section was a different shape, there is no single section modulus to divide by — the stresses add and the properties do not, and two identical finished beams can differ by half again in stress with nothing on the drawing to say which is which.

Two drawings of one deck, and they are not the same structure. A 112 m viaduct on five supports, articulated two ways. Above, the fixed point is at the left abutment: the far end has to be given 45 mm of movement, and the friction of every sliding bearing runs one way, so the fixed support takes 660 kN before any wind or braking is applied. Below, the fixed point is at the middle pier: the largest joint halves to 22 mm and the friction now cancels across the fixed point, leaving 0 kN. The movement arrows are drawn at 900 times the scale of the deck, because a 45 mm movement on a 112 m span is thinner than the line the deck is drawn with. Nothing about the deck, the loads or the ground has changed between the two. Structural form

Where the structure is allowed to move

One drawing decides how big every movement joint on a bridge is and where every horizontal force goes, it takes an afternoon, and it appears on no calculation sheet. Move the fixed point from an abutment to the middle pier and the largest joint halves and the horizontal force on that support drops from the whole of the friction to none of it.

The gap is a sum of five things and only one of them is computed. What a 30 mm movement joint is asked to accommodate, by three combination rules. The top bar is every term at its extreme, added: 33.2 mm, which assumes the hottest day, the fullest floor, the whole of the shrinkage and the worst-placed wall arrive together. The chance of that is about 1.5%. The bottom bar treats them as independent and asks for 16.0 mm. The middle bar is the rule used for actions and almost never for movements — one term at its full value and the rest at their coincidence factors — and gives 25.5 mm. The segments across the top bar are the terms themselves, and the ordering is the finding: the largest is tolerance at 10.0 mm, which is not a structural quantity at all, and the smallest is deflection at 3.2 mm — the only one anybody computes carefully, and 10% of the total. Deflection

The gap nobody computed

A movement joint is sized by adding up everything the structure will do to it, and the deflection calculation — the only term anybody computes carefully — is usually the smallest one in the list. The largest is a construction tolerance, which is not a structural quantity at all, and the sum of the extremes is nearly twice what treating them as independent would ask for.

The prop load is decided by the digging, not by the hole. Prop forces in a 12 m excavation propped at 3 levels, with the force each prop reaches at any stage of the sequence drawn thick and the force the finished arrangement gives it drawn thin. The pale dots are the individual stages. The middle prop reaches 214 kN while the dig is at 9.5 m and finishes at 88 — a factor of 2.44 between the two, and the larger one is not in the final analysis anywhere. Terzaghi and Peck's apparent pressure diagram, a rectangle of 49.4 kN/m², reproduces the total of the staged maxima to 2% — which is what it is: an envelope of measured prop loads, back-figured into a pressure, and a shape nothing on a wall is ever loaded with. Structural form

Every prop has its own worst day

A braced excavation has no finished state worth analysing. It is dug in stages, a level of props goes in at each stage, and a prop's force is largely fixed the moment it is installed — so the force to design it for is the largest it sees during a sequence that appears on no calculation sheet, and which for the middle prop here is nearly two and a half times what the finished arrangement gives.

The check that depends on a date. Total deflection and the deflection occurring after the brittle finishes are built, for one 12 m beam, against the day those finishes go up. The total barely moves — the beam ends up where it ends up. The increment falls from 32 mm at a week to 14 mm at a year, because creep is fast at first and slow later and a partition built early inherits nearly all of it: 44% of the final creep has already happened by day 28. The span/500 limit is 24 mm and the span/250 limit is 48; this beam passes the first only after day 25. Camber subtracts from both terms of the difference and therefore changes the upper curve and not the lower one, which is the reason a cambered beam can satisfy every total-deflection check and still crack the wall. Deflection

The limit that depends on a date

Total deflection can nearly always be met, and on a long span it is met with camber. The limit that actually decides the member is the other one — the deflection occurring after the brittle finishes are built — and camber does nothing for it whatever, because it is subtracted from both terms of a difference. The same beam passes or fails on the day the partitions went up.

Every section is hogged and sagged before the bridge exists. The bending moment envelope of a launched deck, section by section along its own length, taken over every position of the launch. In service each section has one sign; during the launch 100 per cent of them see both, because each passes over every pier and through every span on its way out. The worst launch moment is 42568 kNm against 40500 in service, and with no launching nose at all it would be 185977. That is why a launched bridge is a constant-depth box with symmetric flanges: the design case is not a load, it is a history. Structural form

Every section was somewhere else

A bridge pushed out over its piers subjects each of its cross-sections to a history rather than to a load case. Every one passes over every support and through every span, so the design envelope is the envelope of envelopes — and no in-service condition produces it.

The library, page 1 of 7 — where build-sequence sits